SHOWER TOILET BERNSTEIN Basic
Installation Manuel - II / 2018
Delivery
The following components are included:
- Shower Toilet Bernstein Basic unit
- Threaded Stays M 12 [hardware]
- In-Flow Pipe and Seal Ring [plumbing]
- Installation Manuel / Instruction Manuel [documentation]
- Nuts M 12 [hardware]
- Waste Pipe and Seal Ring [plumbing]
- Plugs [hardware]
- Insulation Pad [material]
- Washers [hardware]
Components & Filter Installation
Additional components may include:
- Ballvalve [plumbing]
- Filter [plumbing]
- Steel Water Hose [plumbing]
Note: A second steel hose G 1/2 inch is not included.
Filter Installation
Diagram Description: Water Supply connects to a Ballvalve, then to a Filter, and finally to the Bidet via a Steel Water Hose.
[Water Supply] ➡️ [Ballvalve] ➡️ [Filter] ➡️ [Steel Water Hose] ➡️ [to Bidet]
Liability Declaration
The supplier is not liable for damages caused by negligence in the following areas:
- This is an electronic device and must be grounded! ❗
- Persons with disabilities or small children should not be allowed to use this product without supervision.
- Please use caution and follow all installation steps to avoid accidents.
Make sure there is proper ventilation. ?
Tools (Not Included)
The following tools are required for installation but are not supplied:
- Measuring Tape [tool]
- Pencil [tool]
- Philips Screwdriver [tool]
- Flathead Screwdriver [tool]
- Box Cutter [tool]
- File [tool]
- Adjustable Wrench [tool]
- Insulation Cutter [tool]
- Drill [tool]
- Drill Bit 6mm [tool]
- Saw [tool]
- Caulking Gun [tool]
- Ruler [tool]
- Level [tool]
Installation Model A
Prior to installation, ensure that a water valve and electrical outlet are present.
Step A1
Diagram Description: The shower toilet unit is shown positioned against a tiled wall. A water valve and electrical outlet are visible. A mounting plate is depicted on the wall. A timer icon (10 seconds) is shown.
[Toilet Unit] ➡️ [Wall] + [Water Valve] + [Electrical Outlet] + [Mounting Plate] ⏱️ 10 Sec
Step A2
Diagram Description: Close-up of the mounting plate on the wall, showing connection points for water and waste.
[Mounting Plate] with [Water Connections] & [Waste Connections]
Step A3
Diagram Description: Threaded stays are being inserted into the mounting plate.
[Threaded Stays] inserted into [Mounting Plate]
Step A4
Diagram Description: The shower toilet unit is being positioned over the mounting plate and threaded stays.
[Shower Toilet Unit] positioned over [Mounting Plate] & [Threaded Stays]
Step A5
Diagram Description: The rear of the toilet unit is shown connected to the wall mounting system.
[Rear of Toilet Unit] connected to [Wall Mounting System]
Step A6
Diagram Description: Two types of pipe connectors (L1, L2) are shown, with diagrams indicating extensions (L1+6mm, L2+3mm). This suggests options for different pipe lengths or adjustments.
Pipe Connectors: [L1] ➡️ [L1+6mm], [L2] ➡️ [L2+3mm]
Step A7
Diagram Description: Tools such as screwdrivers and a measuring tape are shown being used for adjustment or securing components. Icons suggest alignment or measurement tasks.
[Tools: Screwdrivers, Measuring Tape] used for [Adjustment/Securing]. Icons indicate [Align] or [Measure].
Step A8
Diagram Description: A view of the rear of the toilet unit, showing various connections and internal components.
[Rear View of Toilet Unit] with [Connections] & [Components]
Step A9
Diagram Description: Wall measurements are indicated: 180mm and 48mm. These likely represent spacing requirements for mounting or connections.
Wall Measurements: 180mm, 48mm
Step A10
Diagram Description: The mounting plate is being attached to the wall using screws.
[Mounting Plate] attached to [Wall] with [Screws]
Step A11
Diagram Description: A screwdriver is being used to attach a component, likely to the toilet seat or lid mechanism.
[Screwdriver] attaching [Component] to [Seat/Lid Mechanism]
Step A12
Diagram Description: A Philips screwdriver is used to secure a part of the toilet unit.
[Philips Screwdriver] securing [Part of Toilet Unit]
Step A13
Diagram Description: The toilet seat is shown being lowered onto the main toilet body.
[Toilet Seat] lowered onto [Main Toilet Body]
Step A14
Diagram Description: The toilet unit is shown mounted on the wall bracket.
[Toilet Unit] mounted on [Wall Bracket]
Step A15
Diagram Description: The toilet unit is depicted in its final wall-mounted position.
[Toilet Unit] in final [Wall-Mounted Position]
Step A16
Diagram Description: A valve is shown being operated, likely for controlling the water supply.
[Valve] operated for [Water Supply Control]
Step A17
Diagram Description: The toilet unit is shown being slid into its final installed position.
[Toilet Unit] slid into final [Installed Position]
Step A18
Diagram Description: Connections are being made to the toilet unit.
[Connections] made to [Toilet Unit]
Step A19
Diagram Description: The toilet seat and lid are shown being attached to the unit.
[Toilet Seat] and [Lid] attached to [Unit]
Step A20
Diagram Description: Clips or fasteners are being applied to secure various parts of the toilet.
[Clips/Fasteners] applied to secure [Parts]
Step A21
Diagram Description: A screwdriver is used to attach the toilet lid.
[Screwdriver] attaching [Toilet Lid]
Step A22
Diagram Description: Final water and power connections are shown being made to the installed toilet.
[Final Water] and [Power Connections] made
Step A23
Diagram Description: The shower toilet unit is shown fully installed and connected.
[Shower Toilet Unit] fully [Installed] and [Connected]
Step A24
Diagram Description: A hand is shown holding a filter cartridge, indicating a step related to filter maintenance or replacement.
[Hand] holding [Filter Cartridge] for [Maintenance/Replacement]
Installation Model B
Prior to installation, ensure that a water valve and electrical outlet are installed directly next to the WC.
Step B1
Diagram Description: A mounting plate is shown on a tiled wall with measurements (100, 200, 400). Labels indicate "inlet hose" and "power cable".
[Mounting Plate] on [Wall] with measurements [100, 200, 400]. Labels: [inlet hose], [power cable].
Step B2
Diagram Description: The mounting plate is shown with connections, and inlet hoses and power cables are being attached. A timer icon (10 seconds) is present.
[Mounting Plate] with [Connections], [Inlet Hoses] & [Power Cables] attached. ⏱️ 10 Sec
Step B3
Diagram Description: The mounting plate and its attached components are being secured.
[Mounting Plate] and [Components] being secured.
Step B4
Diagram Description: The shower toilet unit is shown being prepared for connection to the wall mounting system.
[Shower Toilet Unit] prepared for connection to [Wall Mounting System]
Step B5
Diagram Description: The shower toilet unit is being attached to the wall bracket.
[Shower Toilet Unit] attached to [Wall Bracket]
Step B6
Diagram Description: The shower toilet unit is shown in its wall-mounted position.
[Shower Toilet Unit] in [Wall-Mounted Position]
Step B7
Diagram Description: Similar to A6, shows pipe connectors (L1, L2) and their extensions (L1+6mm, L2+3mm).
Pipe Connectors: [L1] ➡️ [L1+6mm], [L2] ➡️ [L2+3mm]
Step B8
Diagram Description: Similar to A7, shows tools being used for adjustment or securing components.
[Tools: Screwdrivers, etc.] used for [Adjustment/Securing].
Step B9
Diagram Description: A view of the rear of the shower toilet unit, showing connections.
[Rear View of Toilet Unit] showing [Connections]
Step B10
Diagram Description: Wall measurements are indicated: 180mm and 48mm.
Wall Measurements: 180mm, 48mm
Step B11
Diagram Description: The mounting plate is being attached to the wall.
[Mounting Plate] attached to [Wall]
Step B12
Diagram Description: A Philips screwdriver is used to attach a component to the toilet unit.
[Philips Screwdriver] attaching [Component] to [Toilet Unit]
Step B13
Diagram Description: A screwdriver is used to secure a part of the toilet unit.
[Screwdriver] securing [Part of Toilet Unit]
Step B14
Diagram Description: The toilet seat is shown being lowered onto the main toilet body.
[Toilet Seat] lowered onto [Main Toilet Body]
Step B15
Diagram Description: The toilet unit is shown mounted on the wall bracket.
[Toilet Unit] mounted on [Wall Bracket]
Step B16
Diagram Description: Water and waste connections are being made to the toilet unit.
[Water] and [Waste Connections] made to [Toilet Unit]
Step B17
Diagram Description: The toilet unit is shown in its final wall-mounted position.
[Toilet Unit] in final [Wall-Mounted Position]
Step B18
Diagram Description: A valve is operated, and hose connections are being made.
[Valve] operated, [Hose Connections] made
Step B19
Diagram Description: The toilet unit is shown being slid into its final position.
[Toilet Unit] slid into final [Position]
Step B20
Diagram Description: A view of the rear of the toilet unit showing connections.
[Rear View of Toilet Unit] showing [Connections]
Step B21
Diagram Description: The toilet seat and lid are shown being attached, with an arrow indicating downward movement.
[Toilet Seat] and [Lid] attached, [Downward Movement] indicated.
Step B22
Diagram Description: Final connections are being made, and a screwdriver is used to secure a part.
[Final Connections] made, [Screwdriver] used for securing.
Step B23
Diagram Description: The toilet unit with lid attached, and connections being made. (Repeated diagram)
[Toilet Unit with Lid] and [Connections] being made.
Step B24
Diagram Description: Close-up of connections and a hand holding a tool. (Repeated diagram)
[Close-up of Connections] and [Hand] holding [Tool].
Step B25
Diagram Description: Clips or fasteners are shown being applied to the toilet unit.
[Clips/Fasteners] applied to [Toilet Unit]
Step B26
Diagram Description: The toilet seat and lid are shown being attached using screws.
[Toilet Seat] and [Lid] attached using [Screws]