SHOWER TOILET BERNSTEIN Basic

Installation Manuel - II / 2018

Delivery

The following components are included:

Components & Filter Installation

Additional components may include:

Note: A second steel hose G 1/2 inch is not included.

Filter Installation

Diagram Description: Water Supply connects to a Ballvalve, then to a Filter, and finally to the Bidet via a Steel Water Hose.

[Water Supply] ➡️ [Ballvalve] ➡️ [Filter] ➡️ [Steel Water Hose] ➡️ [to Bidet]

Liability Declaration

The supplier is not liable for damages caused by negligence in the following areas:

  1. This is an electronic device and must be grounded! ❗
  2. Persons with disabilities or small children should not be allowed to use this product without supervision.
  3. Please use caution and follow all installation steps to avoid accidents.

Make sure there is proper ventilation. ?

Tools (Not Included)

The following tools are required for installation but are not supplied:

Installation Model A

Prior to installation, ensure that a water valve and electrical outlet are present.

Step A1

Diagram Description: The shower toilet unit is shown positioned against a tiled wall. A water valve and electrical outlet are visible. A mounting plate is depicted on the wall. A timer icon (10 seconds) is shown.

[Toilet Unit] ➡️ [Wall] + [Water Valve] + [Electrical Outlet] + [Mounting Plate] ⏱️ 10 Sec

Step A2

Diagram Description: Close-up of the mounting plate on the wall, showing connection points for water and waste.

[Mounting Plate] with [Water Connections] & [Waste Connections]

Step A3

Diagram Description: Threaded stays are being inserted into the mounting plate.

[Threaded Stays] inserted into [Mounting Plate]

Step A4

Diagram Description: The shower toilet unit is being positioned over the mounting plate and threaded stays.

[Shower Toilet Unit] positioned over [Mounting Plate] & [Threaded Stays]

Step A5

Diagram Description: The rear of the toilet unit is shown connected to the wall mounting system.

[Rear of Toilet Unit] connected to [Wall Mounting System]

Step A6

Diagram Description: Two types of pipe connectors (L1, L2) are shown, with diagrams indicating extensions (L1+6mm, L2+3mm). This suggests options for different pipe lengths or adjustments.

Pipe Connectors: [L1] ➡️ [L1+6mm], [L2] ➡️ [L2+3mm]

Step A7

Diagram Description: Tools such as screwdrivers and a measuring tape are shown being used for adjustment or securing components. Icons suggest alignment or measurement tasks.

[Tools: Screwdrivers, Measuring Tape] used for [Adjustment/Securing]. Icons indicate [Align] or [Measure].

Step A8

Diagram Description: A view of the rear of the toilet unit, showing various connections and internal components.

[Rear View of Toilet Unit] with [Connections] & [Components]

Step A9

Diagram Description: Wall measurements are indicated: 180mm and 48mm. These likely represent spacing requirements for mounting or connections.

Wall Measurements: 180mm, 48mm

Step A10

Diagram Description: The mounting plate is being attached to the wall using screws.

[Mounting Plate] attached to [Wall] with [Screws]

Step A11

Diagram Description: A screwdriver is being used to attach a component, likely to the toilet seat or lid mechanism.

[Screwdriver] attaching [Component] to [Seat/Lid Mechanism]

Step A12

Diagram Description: A Philips screwdriver is used to secure a part of the toilet unit.

[Philips Screwdriver] securing [Part of Toilet Unit]

Step A13

Diagram Description: The toilet seat is shown being lowered onto the main toilet body.

[Toilet Seat] lowered onto [Main Toilet Body]

Step A14

Diagram Description: The toilet unit is shown mounted on the wall bracket.

[Toilet Unit] mounted on [Wall Bracket]

Step A15

Diagram Description: The toilet unit is depicted in its final wall-mounted position.

[Toilet Unit] in final [Wall-Mounted Position]

Step A16

Diagram Description: A valve is shown being operated, likely for controlling the water supply.

[Valve] operated for [Water Supply Control]

Step A17

Diagram Description: The toilet unit is shown being slid into its final installed position.

[Toilet Unit] slid into final [Installed Position]

Step A18

Diagram Description: Connections are being made to the toilet unit.

[Connections] made to [Toilet Unit]

Step A19

Diagram Description: The toilet seat and lid are shown being attached to the unit.

[Toilet Seat] and [Lid] attached to [Unit]

Step A20

Diagram Description: Clips or fasteners are being applied to secure various parts of the toilet.

[Clips/Fasteners] applied to secure [Parts]

Step A21

Diagram Description: A screwdriver is used to attach the toilet lid.

[Screwdriver] attaching [Toilet Lid]

Step A22

Diagram Description: Final water and power connections are shown being made to the installed toilet.

[Final Water] and [Power Connections] made

Step A23

Diagram Description: The shower toilet unit is shown fully installed and connected.

[Shower Toilet Unit] fully [Installed] and [Connected]

Step A24

Diagram Description: A hand is shown holding a filter cartridge, indicating a step related to filter maintenance or replacement.

[Hand] holding [Filter Cartridge] for [Maintenance/Replacement]

Installation Model B

Prior to installation, ensure that a water valve and electrical outlet are installed directly next to the WC.

Step B1

Diagram Description: A mounting plate is shown on a tiled wall with measurements (100, 200, 400). Labels indicate "inlet hose" and "power cable".

[Mounting Plate] on [Wall] with measurements [100, 200, 400]. Labels: [inlet hose], [power cable].

Step B2

Diagram Description: The mounting plate is shown with connections, and inlet hoses and power cables are being attached. A timer icon (10 seconds) is present.

[Mounting Plate] with [Connections], [Inlet Hoses] & [Power Cables] attached. ⏱️ 10 Sec

Step B3

Diagram Description: The mounting plate and its attached components are being secured.

[Mounting Plate] and [Components] being secured.

Step B4

Diagram Description: The shower toilet unit is shown being prepared for connection to the wall mounting system.

[Shower Toilet Unit] prepared for connection to [Wall Mounting System]

Step B5

Diagram Description: The shower toilet unit is being attached to the wall bracket.

[Shower Toilet Unit] attached to [Wall Bracket]

Step B6

Diagram Description: The shower toilet unit is shown in its wall-mounted position.

[Shower Toilet Unit] in [Wall-Mounted Position]

Step B7

Diagram Description: Similar to A6, shows pipe connectors (L1, L2) and their extensions (L1+6mm, L2+3mm).

Pipe Connectors: [L1] ➡️ [L1+6mm], [L2] ➡️ [L2+3mm]

Step B8

Diagram Description: Similar to A7, shows tools being used for adjustment or securing components.

[Tools: Screwdrivers, etc.] used for [Adjustment/Securing].

Step B9

Diagram Description: A view of the rear of the shower toilet unit, showing connections.

[Rear View of Toilet Unit] showing [Connections]

Step B10

Diagram Description: Wall measurements are indicated: 180mm and 48mm.

Wall Measurements: 180mm, 48mm

Step B11

Diagram Description: The mounting plate is being attached to the wall.

[Mounting Plate] attached to [Wall]

Step B12

Diagram Description: A Philips screwdriver is used to attach a component to the toilet unit.

[Philips Screwdriver] attaching [Component] to [Toilet Unit]

Step B13

Diagram Description: A screwdriver is used to secure a part of the toilet unit.

[Screwdriver] securing [Part of Toilet Unit]

Step B14

Diagram Description: The toilet seat is shown being lowered onto the main toilet body.

[Toilet Seat] lowered onto [Main Toilet Body]

Step B15

Diagram Description: The toilet unit is shown mounted on the wall bracket.

[Toilet Unit] mounted on [Wall Bracket]

Step B16

Diagram Description: Water and waste connections are being made to the toilet unit.

[Water] and [Waste Connections] made to [Toilet Unit]

Step B17

Diagram Description: The toilet unit is shown in its final wall-mounted position.

[Toilet Unit] in final [Wall-Mounted Position]

Step B18

Diagram Description: A valve is operated, and hose connections are being made.

[Valve] operated, [Hose Connections] made

Step B19

Diagram Description: The toilet unit is shown being slid into its final position.

[Toilet Unit] slid into final [Position]

Step B20

Diagram Description: A view of the rear of the toilet unit showing connections.

[Rear View of Toilet Unit] showing [Connections]

Step B21

Diagram Description: The toilet seat and lid are shown being attached, with an arrow indicating downward movement.

[Toilet Seat] and [Lid] attached, [Downward Movement] indicated.

Step B22

Diagram Description: Final connections are being made, and a screwdriver is used to secure a part.

[Final Connections] made, [Screwdriver] used for securing.

Step B23

Diagram Description: The toilet unit with lid attached, and connections being made. (Repeated diagram)

[Toilet Unit with Lid] and [Connections] being made.

Step B24

Diagram Description: Close-up of connections and a hand holding a tool. (Repeated diagram)

[Close-up of Connections] and [Hand] holding [Tool].

Step B25

Diagram Description: Clips or fasteners are shown being applied to the toilet unit.

[Clips/Fasteners] applied to [Toilet Unit]

Step B26

Diagram Description: The toilet seat and lid are shown being attached using screws.

[Toilet Seat] and [Lid] attached using [Screws]

Models: SHOWER TOILET BERNSTEIN Basic

File Info : application/pdf, 14 Pages, 925.19KB

PDF preview unavailable. Download the PDF instead.

XXXXX Dusch WC basic DE BS II 2018 Adobe InDesign CC 2017 (Windows) Adobe PDF Library 15.0

Related Documents

Preview BERNSTEIN Dusch Pro+ Shower Toilet Operator's Manual
Comprehensive operator's manual for the BERNSTEIN Dusch Pro+ Shower Toilet. This guide provides detailed information on installation, operation, features like rear wash and lady wash, remote control functions, safety precautions, technical specifications, and troubleshooting tips for the BERNSTEIN Dusch Pro+ smart toilet.
Preview Dusch Pro+ BERNSTEIN Shower Toilet Installation Manual
Comprehensive installation manual for the Dusch Pro+ BERNSTEIN Shower Toilet, detailing product components, required tools, and step-by-step installation procedures for both Model A and Model B.
Preview Bernstein BS6002 Wall-Mounted Washbasin Installation Guide
Comprehensive instructions for the safe and correct installation of the Bernstein BS6002 wall-mounted washbasin. Includes required tools, parts list, and step-by-step mounting procedures.
Preview Bernstein NT36 Washbasin Assembly Instructions
Comprehensive assembly instructions for the Bernstein NT36 washbasin, detailing dimensions, required tools, and step-by-step installation procedures. This guide is presented in English for clarity.
Preview BERNSTEIN BS Rimless Wall Niche Installation Guide
Step-by-step assembly instructions and installation guide for the BERNSTEIN BS rimless wall niche. Learn about dimensions, mounting, tiling, and product features.
Preview Bernstein ARCTIC Vanity Unit Installation and Mounting Guide
Comprehensive instructions for the mounting and use of Bernstein ARCTIC vanity units in sizes 1200, 1400, 1600, and 1800. Includes required tools, dimensions, and step-by-step assembly guidance.
Preview Bernstein ARCTIC Vanity Unit Installation and Use Guide
Comprehensive instructions for the installation and use of Bernstein ARCTIC vanity units in sizes 1200, 1400, 1600, and 1800. Includes required tools, dimensions, and step-by-step assembly guidance.
Preview Bernstein LAVOA Thermostatic Mixer Installation and User Manual
Comprehensive guide for the installation and use of the Bernstein LAVOA thermostatic mixer, including technical specifications, safety information, and multilingual instructions.