Verizon
6929 N. Lakewood Avenue
Tulsa, OK 74117
SHORT TERM PUBLIC NOTICE UNDER RULE 51.333(a)
June 27, 2025
Carrier: Verizon Virginia LLC, 22001 Loudoun County Parkway, Ashburn, VA 20147
Contact: For additional information on these planned network changes, please contact:
Lisa M Thompson
Global Engineering and System Performance
Verizon Wireline Network Operations
13100 Columbia Pike
Silver Spring, MD 20904
(410) 375-9777
Michael Childs
Associate Director
Verizon Network Engineering
5055 North Point Pkwy.
Alpharetta, GA 30022
(469) 497-4466
Implementation Date: On or after October 25, 2025
Planned Network Change(s) Will Occur at the Following Virginia Location(s):
Verizon Central Office | Address | CLLI |
---|---|---|
Fairfax VA CS2k Switch | 10431 Fairfax Boulevard Fairfax, VA 22030 |
FRFXVAFFPS0 |
Fairfax VA C20 Switch | 10431 Fairfax Boulevard Fairfax, VA 22030 |
FRFXVAFFPS1 |
This notice may also be viewed at: http://www.verizon.com/about/terms-conditions/network-disclosures
PLEASE NOTE:
- All references to the Fairfax VA CS2K switch are associated with CLLI code FRFXVAFFPS0 and will not be repeated throughout the notice.
- All references to the Fairfax VA C20 switch are associated with CLLI code FRFXVAFFPS1 and will not be repeated throughout the notice.
Description of the Planned Network Change(s):
The Verizon Fairfax VA CS2K switch, located at 10431 Fairfax Boulevard, Fairfax, VA 22030, will be retired and removed from the Verizon network after all traffic served by this switch is migrated to the Verizon Fairfax VA C20 switch, located at 10431 Fairfax Boulevard, Fairfax, VA 22030. All traffic to be migrated to the Fairfax VA C20 switch includes, but is not limited to, Inter-LATA (ACCESS/FG-B-D/CLEC IXC), wireless and paging traffic.
Description of Reasonably Foreseeable Impact(s) of the Planned Change(s):
All carriers, including competitive local exchange carriers (CLECs), Interexchange carriers (IXCs, IECs), wireless carriers, and paging carriers, will need to provision new trunk groups to support direct end office trunking to the Fairfax VA C20 switch or have existing trunk groups to that switch augmented.
All ASRs for the Fairfax VA C20 switch must be received no later than September 1, 2025, to provide sufficient time to migrate the traffic described above. Local Exchange Routing Guide (LERG) change effective dates will be posted prior to decommissioning of the Fairfax VA CS2K switch (on or after October 25, 2025). This will serve to guide interconnect re-routes of traffic for the Number Plan Area (NPA) codes currently served by the Fairfax VA CS2K switch to reflect the Fairfax VA C20 switch as the new home switch. All trunks to the Fairfax VA C20 switch must be in place prior to the decommissioning of the Fairfax VA CS2K switch.
Related Documents
![]() |
Verizon Network Change Notice: Fairfax VA Switch Migration Public notice regarding Verizon's planned network changes in Fairfax, Virginia, involving the retirement of the CS2k switch and migration of traffic to the C20 switch. Includes details on affected locations, contacts, and implementation dates. |
![]() |
Verizon Network Change Notice: Turtle Creek PA VTOA Gateway Switch Retirement Public notice regarding Verizon's planned short-term network changes, including the retirement of the Turtle Creek PA VTOA Gateway switch and migration of traffic to the Pittsburgh PA Downtown 71T DMS 200 Tandem switch. |
![]() |
Verizon Public Notice: Copper Loop Retirement in Kirklyn and Market Street, PA Verizon Pennsylvania LLC issues a public notice dated September 2, 2015, announcing the retirement of copper loop facilities in Kirklyn and Market Street, PA, effective September 10, 2016. Services will transition to fiber, with copper maintenance ceasing. Affected carriers will be offered 64 Kbps fiber channels where required. |
![]() |
Verizon Pennsylvania LLC Network Change Notice - Turtle Creek and Pittsburgh Verizon Pennsylvania LLC is announcing planned network changes affecting the Turtle Creek PA VTOA Gateway switch and the Pittsburgh PA Downtown 71T DMS 200 Tandem switch. This notice details the retirement of the Turtle Creek switch and the migration of traffic to the Pittsburgh switch, including necessary actions for other carriers. |
![]() |
Verizon Fios Quantum Gateway G1100 User Guide: Setup and Configuration Explore the Verizon Fios Quantum Gateway (Model Fios-G1100) with this comprehensive user guide. Learn about setup, wireless configuration, network management, security features, and troubleshooting for your home internet. |
![]() |
Set Up Your Incident Ticketing System B2B Interface with Verizon A guide to configuring Verizon's Incident Ticketing System B2B Interface, leveraging Service Management eBonding for automated data exchange and streamlined business processes including Incident, Inventory, and Change Management. |
![]() |
Verizon Secure Hybrid Network: Service Overview, Features, and Terms Explore Verizon's Secure Hybrid Network service, covering its definition, standard features, LTE and 5G Business Internet options, supplemental terms, service level agreement, financial terms, and definitions. Includes details on CPE, taxes, and access service. |
![]() |
Verizon Managed WAN Service: Comprehensive Network Solutions Explore Verizon's Managed WAN service, offering advanced network design, management, monitoring, and security features for businesses. Learn about service levels, optional features, and customer responsibilities. |