VEVOR Fitting Room
Models: SYJ-03 / SYJ-04
This document contains the original instructions for your VEVOR Fitting Room. Please read all instructions carefully before assembly and operation. VEVOR reserves the right to interpret its user manual. The appearance of the product is subject to the item received. VEVOR will not provide further notification for technology or software updates.
Safety Instructions
WARNING: Read this material before using this product. Failure to do so may result in serious injury.
Assembly Precautions
- Assemble only according to these instructions. Improper assembly may create hazards.
- Wear ANSI-approved safety goggles and heavy-duty work gloves during assembly.
- Keep the assembly area clean and well-lit.
- Keep bystanders out of the area during assembly.
- Do not assemble if tired or when under the influence of alcohol, drugs, or medication.
- The product capabilities apply to properly and completely assembled products only.
- Assemble on a flat, level, hard, and smooth surface capable of safely supporting the Fitting Room.
- If possible, use power tools to make assembly easier.
- For additional information regarding parts, refer to the Assembly Diagram. Unwrap and separate all parts in a clean work area.
Use Precautions
- Do not exceed specified weight capacities.
- Use only on a flat, level, hard, and smooth surface that can safely support a fully loaded Fitting Room.
- Use as intended only.
- Inspect before every use; do not use if parts are loose or damaged.
SAVE THIS MANUAL
Parts List
Identify all parts before assembly. Refer to the diagram for visual identification.
Part Label | Description | Quantity |
---|---|---|
A | Pipe, long | x2 |
B | Connector, pipe | x4 |
C | Pipe, vertical | x4 |
D | Allen wrench | x1 |
E | Pipe, medium | x4 |
F | Pipe, long | x2 |
G | Pipe, long with holes | x1 |
H | Hanging rod with hooks | x1 |
I | Screw, M5*20 | x2 |
J | Pipe, curved base | x2 |
K | Pipe, curved top | x2 |
L | Connector, corner | x4 |
M | Pipe, short | x2 |
N | Hook | x23+2 |
O | Fabric curtain | x1 |
P | Velcro strip | x1 |
Warm reminder:
- Assembly requires two people to do it, which will make the process smoother.
- Accessory O is a piece of fabric. During transportation, it may develop wrinkles. It would be more beautiful if it is ironed before use.
Assembly Steps
Follow these steps carefully for proper assembly. It is recommended to have two people for assembly.
Step 1
Combine two curved base pipes (J) with two curved top pipes (K) to form two semi-circular frames. Assemble two sets.
Step 2
Attach one vertical pipe (C) to each end of the two semi-circular frames created in Step 1. This results in two U-shaped structures with vertical supports.
Step 3
Connect accessories A (long pipes) and B (connectors) together. Then, attach these assembled A+B units to the vertical C pipes from Step 2. Tighten the screws to 60% of the full torque. Perform this for two sets.
Step 4
Connect medium pipes (E) and long pipes (F) together. Assemble two sets.
Step 5
Assemble the components from Step 4 (E and F pipes) with connectors (B). Use the Allen wrench (D) for connections. The diagram shows how these parts connect to form the main frame structure. Pay attention to orientation markers (e.g., 'marbles facing downwards/upwards' indicating specific connector alignment). As shown in the figure, after installation, tighten all the screws.
Step 6
Connect medium pipes (E) with short pipes (M). Note that the M tube is shorter than the F tube. Please pay attention to this distinction. Assemble two sets.
Step 7
First, attach accessory L (corner connectors) to the positions marked on the C tubes. Do not tighten the screws yet. Then, connect the assembled components from Step 6 (E and M pipes) into accessory L. Tighten the screws at this time.
Step 8
Take accessory G (long pipe with holes). Loosen the screws on the fixing piece at both ends and remove half of it as shown in the figure.
Step 9
Loosen the accessory screws at both ends of the component prepared in Step 8. Install this component onto the F pipe and tighten the screws.
Step 10
Install the hooks (N) onto the designated points on the frame as recommended. Hang the fabric curtain (O) onto these hooks. The installation is now complete. Accessory P consists of Velcro strips, which can be attached to suitable positions as needed.
Product Parameters
Model | SYJ-03 | SYJ-04 |
---|---|---|
Fabric Color | Greyish White | Black |
Frame Color | Black | |
Product Size (D×W×H) | 1000*950*2000mm | |
Net Weight | 6.85kg |
* Products such as specifications, appearance, and design are subject to modification without prior notice.
Manufacturer and Importer Information
Manufacturer: Shanghaimuxinmuyeyouxiangongsi
Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREET EASTWOOD NSW 2122 Australia
Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
European Representative: E-CrossStu GmbH, Mainzer Landstr.69, 60329 Frankfurt am Main.
UK Representative: YH CONSULTING LIMITED. C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX