LEFTON Installation Manual BF2204
Diagram and Parts List
The following components are included for installation:
- Faucet Body
- Rubber Gasket
- Metal Gasket
- Mounting Nut
- Screws *2
- Red Hose (hot water)
- Waterproof Rubber Ring
- Threaded Metal Pipe
- Blue Hose (cold water)
Installation Steps
STEP 1: Installing the faucet assembly.
Place the Waterproof Rubber Ring onto the Threaded Metal Pipe, then attach the Faucet Body to the pipe.
STEP 2: Connect the Hot, Cold water hoses, and tighten them clockwise.
Connect the Red Hose (hot water) and the Blue Hose (cold water) to the corresponding inlets and tighten securely.
STEP 3: Install the faucet to the countertop.
Insert the faucet assembly through the countertop. Ensure the countertop thickness is between 1.38"/35mm (min) and 1.5"/38mm (max).
STEP 4: Install gaskets, nut and fasten the screws.
From underneath the countertop, place the Rubber Gasket, then the Metal Gasket onto the threaded pipe. Secure the faucet with the Mounting Nut and fasten the Screws.
STEP 5: Fasten the screws with the screwdriver.
Use a screwdriver to firmly tighten the screws, securing the faucet in place.
STEP 6: Connect the Hot, Cold water supply.
Connect the Red Hose (hot water) to the hot water supply valve and the Blue Hose (cold water) to the cold water supply valve. Tighten connections clockwise.
STEP 7: Turn the faucet on and check for leaks.
Turn on the faucet to test its functionality and inspect all connections for any signs of leakage.