Lefton BF2204 Installation Manual
Diagram and Parts List
The following components are included for installation:
- Faucet Body
- Rubber Gasket
- Metal Gasket
- Mounting Nut
- Screws (x2)
- Red Hose (hot water)
- Waterproof Rubber Ring
- Threaded Metal Pipe
- Blue Hose (cold water)
Installation Steps
-
STEP 1: Installing the faucet assembly.
Place the Waterproof Rubber Ring onto the Threaded Metal Pipe, then attach the Faucet Body.
-
STEP 2: Connect the Hot, Cold water hoses, and tighten them clockwise.
Attach the Red Hose (hot water) and Blue Hose (cold water) to their respective connections on the faucet assembly and tighten clockwise.
-
STEP 3: Install the faucet to the countertop.
Insert the faucet assembly through the countertop. The countertop thickness should be between 1.38"/35mm (min) and 1.5"/38mm (max).
-
STEP 4: Install gaskets, nut and fasten the screws.
Place the Rubber Gasket, followed by the Metal Gasket, onto the threaded pipe from below the countertop. Secure the faucet by screwing on the Mounting Nut and then fastening the Screws.
-
STEP 5: Fasten the screws with the screwdriver.
Use a screwdriver to securely tighten the screws.
-
STEP 6: Connect the Hot, Cold water supply.
Connect the Red Hose (hot water) to the hot water supply valve and the Blue Hose (cold water) to the cold water supply valve. Ensure connections are secure.
-
STEP 7: Turn the faucet on and check for leaks.
Turn on the water supply and operate the faucet to check for any leaks at all connection points.