JBC CC2002 Cable Collector for NANO Stations

Instruction Manual

Reference: CC2002

Manufacturer: JBC Tools

Website: www.jbctools.com

Packing List

The following items are included with the CC2002 Cable Collector:

Tool Stand Assembly

The CC2002 Cable Collector attaches to the tool stand. The assembly process involves the following steps:

Step 1: Insert the base component of the tool stand into the designated slot on the NAE Control Unit's tool holder.

Step 2: Connect the arm of the cable collector to the assembled base.

Step 3: Secure the assembly by inserting and tightening a screw.

Tool Stand Replacement

To replace the tool stand for the CC2002 Cable Collector:

Step 1: Loosen the screw that secures the current tool stand.

Step 2: Withdraw the old tool stand from its mounting.

Step 3: Insert the new tool stand into the mounting position.

Step 4: Tighten the screw to securely fasten the new tool stand.

These operations are performed on the NAE Control Unit.

Specifications

Product: CC2002 Cable Collector for NANO Stations

Reference: CC2002

Complies with CE standards.

ESD safe.

Warranty and Disposal

Warranty: JBC provides a 2-year warranty covering manufacturing defects, including replacement of defective parts and labor. The warranty does not cover product wear or misuse. For warranty claims, the equipment must be returned postage paid to the dealer where it was purchased.

Disposal: This product must not be disposed of with general household waste. In accordance with European directive 2012/19/EU (WEEE), electronic equipment at the end of its life must be collected and returned to an authorized recycling facility.

Compliance Marks: CE, EAC

Models: CC2002 Cable Collector, CC2002, Cable Collector, Collector

File Info : application/pdf, 4 Pages, 1.66MB

PDF preview unavailable. Download the PDF instead.

manual-cc2002-cable-collector-0025685 ID-200045

References

Adobe PDF Library 17.0 Adobe InDesign 18.0 (Windows)

Related Documents

Preview JBC CC2002 Cable Collector: Instruction Manual for NAS & NAN Stations
Comprehensive instruction manual for the JBC CC2002 Cable Collector, detailing its features, packing list, assembly, replacement procedures, and technical specifications for NAS and NAN soldering stations.
Preview JBC NAN 2-Tool Nano Soldering Station Instruction Manual
Comprehensive instruction manual for the JBC NAN 2-Tool Nano Soldering Station, covering features, connections, operation, maintenance, and safety guidelines. Includes packing list and technical specifications.
Preview JBC DT60 Heat-Resistant Gripper Instruction Manual
Instruction manual for the JBC DT60 Heat-Resistant Gripper, detailing its features and usage for handling hot solder collectors.
Preview JBC DSS/DRS Stands for Desoldering Iron: Instruction Manual
Comprehensive instruction manual for JBC DSS and DRS stands designed for DS360 and DR560 desoldering irons. Covers features, packing list, assembly, tip cleaning, tip extraction, accessories, maintenance, and safety guidelines.
Preview JBC DR560 Desoldering Iron: Instruction Manual and Specifications
Comprehensive instruction manual for the JBC DR560 Desoldering Iron. Includes packing list, features, desoldering process, maintenance, safety guidelines, and specifications. Learn how to use and care for your JBC DR560.
Preview JBC NT115 Nano Handle User Manual
User manual for the JBC NT115 Nano Handle, providing instructions on its features, connections, grip replacement, tip replacement, compatible tips, and safety precautions.
Preview JBC TRA245/TRA470 Automatic Soldering Tool for Robot - Instruction Manual
Comprehensive instruction manual for the JBC TRA245 and TRA470 Automatic General/Heavy Duty Soldering Tools for Robots, covering assembly, connections, maintenance, safety, specifications, and spare parts.
Preview JBC T210 & T245 Soldering Handpieces - Reference Guide
Comprehensive reference guide for JBC T210 and T245 soldering handpieces, detailing features, compatible cartridges (C210, C245), station compatibility, maintenance, and warranty information.