Stäubli MC4-Evo 2 In-line Fuse MA707

Installation and Operation Manual

Safety Instructions

Importance of the Assembly Instructions

Failure to follow assembly and safety instructions can lead to life-threatening injuries from electric shock, electric arcs, fire, or system failure.

Intended Use

The In-line Fuses interrupt DC circuits in case of fault currents or over-currents.

Requirements for Personnel

Assembly, installation, and commissioning must only be performed by an electrician or an electrically instructed person.

Prerequisites for Installation and Assembly

Mating and Disconnecting

Do Not Modify or Repair Component

Technical Data

Product Specifications
ParameterValue
Product DesignationMC4-Evo 2 In-line Fuse MA707 (cn) / MA707 (en)
Product NamePV-K/1500ILF3
Rated Current (gPV)4 A, 5 A, 6 A, 10 A, 15 A, 20 A, 25 A, 30 A
Length59 cm (0059)
Voltage RatingDC 1500 V
Test Voltage8 kV
Safety ClassII
Overvoltage Category / Pollution DegreeCATIII / 3
Upper Limiting Temperature (ULT)115 °C
Ambient Temperature Range-40 °C to +50 °C
Degree of Protection (IP)IP65 / IP68 (1 m, 1 h)
Insulation MaterialPolyamide / EVA / XLPE
Mating ConnectorsOnly genuine Stäubli connectors: PV-KST4/..., PV-KBT4/... ("MC4"); PV-KBT4-EVO 2..., PV-KST4-EVO 2... ("MC4-Evo 2")
Transportation/Storage Temperature Range-40 °C to +50 °C
CertificationsTUV Rheinland certified acc. to 2PfG 2380/10.21; Fuse link gPV certified acc. to IEC60269-6:2010+Amd1

Attention: Rated data depends on mating connectors used. Observe connector assembly instructions.

Tools and Assembly Materials Required

For integration into a PV cable harness system:

Assembly and Unlocking Tool:

For MC4-Evo 2 connectors: PV-MS-PLS, Order No. 32.6058.

Refer to operating instructions MA270 at www.staubli.com/electrical.

Installation Procedure

⚠️ Important Electric Shock Hazard: Do not disconnect the In-line Fuse under load nor connect it in an electrical circuit that is under load.

Using the appropriate disconnect tool, separate the mated connector pair where the In-line Fuse will be located.

[Diagram Description: Illustration shows using a disconnect tool to separate a connector pair.]

Notes on Installation

General Notes on Installation

Cable Routing

Cable management must allow a minimum of 20 mm of cable that exits directly from the cable seal without bending or stress. Refer to cable manufacturers' specifications for minimum bending radius.

When installing in bundles (n > 1), consider the product's temperature ratings and relevant standards/regulations.

[Diagram Description: Illustration shows a cable exiting a connector seal with a label indicating "Min. 20 mm" for the straight section before bending.]

Contaminated/Damaged Connectors

Mechanical Stress

Notes

[This section contains no specific information in the provided pages.]

Models: MC4-Evo, MC4-Evo 2 In Line Fuse, 2 In Line Fuse, Line Fuse

File Info : application/pdf, 8 Pages, 727.50KB

PDF preview unavailable. Download the PDF instead.

v1

References

Adobe PDF Library 17.0

Related Documents

Preview Stäubli MA707 MC4-Evo 2 In-line Fuse PV-K/1500ILF3 Installation and Operation Manual
Comprehensive installation and operation guide for the Stäubli MA707 MC4-Evo 2 In-line Fuse (PV-K/1500ILF3), covering safety instructions, technical data, assembly procedures, and important notes for photovoltaic systems.
Preview Stäubli MC4 In-line Fuse MA701 Installation and Operation Manual
Comprehensive installation and operation manual for the Stäubli MC4 In-line Fuse MA701, covering safety instructions, technical specifications, and assembly procedures for PV-K/ILF and PV-K/1500ILF models. Includes detailed guidance on proper handling, mating, disconnecting, and component identification.
Preview Stäubli In-line Fuse 2: High-Performance Solar PV Component
Discover the Stäubli In-line Fuse 2 (PV-K/ILF2) for solar photovoltaic systems. Offering robust housing, IP68 protection, and MC4-Evo 2 connectivity, it ensures reliable, long-lasting performance with minimal energy loss. Available in various ratings up to 1500V.
Preview Stäubli MC4-Evo Ready Connector MA293 Assembly Instructions
Comprehensive assembly instructions for the Stäubli MC4-Evo Ready MA293 connector. This guide covers essential safety precautions, required tools, detailed cable preparation steps, connector assembly, fastening, mating, and disconnecting procedures, along with technical specifications for photovoltaic applications.
Preview Stäubli MC4-Evo 2 Connectors: In-line Fuse & Y-Splitter Technical Specifications
Detailed technical specifications, features, and configuration options for Stäubli's MC4-Evo 2 series of in-line fuses, Y-splitters, and combined units for solar photovoltaic DC systems. Includes product data, certifications, and customization information.
Preview Stäubli MC4-Evo 2 Y-Splitter MA706 Installation and Operation Manual
Installation and operation manual for the Stäubli MC4-Evo 2 Y-Splitter MA706, covering safety instructions, technical data, assembly, and installation notes for PV systems.
Preview Stäubli MC4-Evo Stor MA702 Panel Receptacle Assembly Instructions and Technical Data
Comprehensive guide for the Stäubli MC4-Evo Stor MA702 panel receptacle, covering safety, tools, lead preparation, crimping, installation, mating, disconnecting, and technical specifications for photovoltaic applications.
Preview Stäubli MC4-Evo Ready Connector MA293 Assembly Instructions
Comprehensive assembly instructions for Stäubli MC4-Evo Ready connectors (MA293), covering safety, tools, cable preparation, assembly, mating, disconnecting, and technical data for PV-KST4-EVO READY and PV-KBT4-EVO READY.