Stäubli MC4-Evo Stor MA702 Panel Receptacle

Model: MA702

Product Type: Panel Receptacle

Valid for: PV-ADB4-EVO ST / PV-ADS4-EVO ST

Safety Instructions

Importance of Assembly Instructions

⚠️ NON-COMPLIANCE with assembly and safety instructions can result in life-threatening injuries due to electric shock, electric arcs, fire, or system failure.

Intended Use

The connector electrically connects components within the DC circuits of a PV array. It can be used for purposes other than PV systems, e.g., as a low-voltage DC component. If used for other purposes, requirements and specifications may differ.

For more information, contact Stäubli: www.staubli.com/electrical

Requirements for Personnel

Assembly, installation, and commissioning must only be performed by an electrician or an electrically instructed person.

Prerequisites for Installation and Assembly

Safe Assembly and Mounting

Live parts can remain energized after isolation or disconnection.

Mating and Disconnecting

Do NOT Modify or Repair Component

Tools Required

Illustration/ItemDescriptionType / ModelOrder No.
(ill. 1)Stripping pliers PV-AZM... with integrated stripping blades and 2.5 mm Allen key.PV-AZM-156 / PV-AZM-41032.6027-156 / 32.6027-410
(ill. 2)Crimping pliers PV-CZM... with locator.PV-CZM-61100 / PV-CZM-60100 (Crimping Pliers)
PV-LOC-MC4-EVO 2 (Locator)
32.6020-61100 / 32.6020-60100
32.6084 / 32.6083
(ill. 3)Assembly and unlocking tool PV-MS-PLS.PV-MS-PLS32.6058
(ill. 4)Torque set / 17 mm torque wrench.PV-WZ-Torque-Set32.0065
(ill. 5)Test plug.PV-EVO-PST32.6073
(ill. 6)Cable cutter.PV-WZ-KS32.6080

Refer to specific operating instructions (MA267, MA704, MA270, MA705) for detailed usage of these tools. Available at www.staubli.com/re-downloads.html.

Lead Preparation

Cables with strand class 5 and 6 according to IEC 60228 must be used. Use tinned copper cables only.

⚠️ Do not use oxidized or bare conductors. Stäubli solar cables use high-grade tinned conductors. Stäubli prohibits the use of PVC cables and non-tinned cables of type H07RN-F for safety reasons.

Step 1: Check dimension 'b' (stripping length) as per illustration and Table 1.

Table 1: Stripping Dimension (b) vs. Conductor Cross-Section
b: Control Dimension (mm)Conductor Cross-Section (mm²)AWGType
~ 32.514PV-ADB4-EVO ST/2.5
PV-ADS4-EVO ST/2.5
~ 54-612/10PV-ADB4-EVO ST/6
PV-ADS4-EVO ST/6
6.5108PV-ADB4-EVO ST/10
PV-ADS4-EVO ST/10

Step 2: Strip the cable to a length of 6.0 mm to 7.5 mm.

⚠️ Do not cut individual strands when stripping!

Crimping

Step 1: Open the clamp (K) and hold it. Insert the contact into the appropriate cross-section range.

Step 2: Turn the crimping flaps (C) upwards.

Step 3: Release the clamp (K). The contact is now locked.

Ensure the contact is correctly placed in the housing and held by the clamp.

Step 4: Verify that the crimping flaps are correctly aligned.

Step 5: Press the pliers gently together until the crimping flaps are properly located within the crimping die.

Step 6: Insert the stripped lead end until the lead strands come up against the locator.

Step 7: Completely close the crimping pliers.

Step 8: Open the crimping pliers.

Step 9: Remove the crimped cable assembly.

Step 10: Visually check the crimp according to IEC 60352-2 criteria:

Installation of Receptacles

Drilling the Housing Plate

For horizontal or vertical mounting, a spacing (X) of at least 25 mm is recommended.

Note: Ensure housing wall thickness is 2-4 mm for metal housings and 2-6 mm for plastic housings. If wall thickness is outside these values, validation must be done by the installer.

⚠️ Before mounting plastic insulations through the bore, place the flat gasket on the insulation.

Danger: Lacking a flat gasket or incorrect mounting will compromise IP65 and IP68 ingress protection.

Mounting and Securing

Position the plastic parts (E) for easy mating and disconnecting. Screw on the nuts (M) and tighten with a torque wrench.

Typical torque values are 1.7 N m. The appropriate torque must be verified based on the specific housing in the end-use application.

1) We recommend precisely following the calibration procedure defined for each specific torque wrench used!

In mounting position, the flat gasket must lie evenly on the outer side of the mounting surface. During visual check after assembly, ensure there are no cracks, foldings, or other disturbances.

Assembly Check

Step 1: Insert the crimped contact into the insulator of the male or female coupler until engaged. A "click" sound typically indicates full insertion.

Step 2: Gently pull the cable to check that the metal part is correctly engaged.

Step 3: Insert the appropriate end of the test pin into the male or female coupler as far as it will go. If the contact is correctly located, the white mark on the test pin must still be visible.

Step 4: Polarity marking for the PV string in its end-use must be indicated, for example, on the enclosure where the receptacles are mounted.

The following polarity markings are deemed sufficient: "+" and "-", "POS" and "NEG", "POSITIVE" and "NEGATIVE".

Mating and Disconnecting

Mating

Mate the connectors until a "click" is heard. Check correct engagement by lightly pulling the connector (maximum pulling force: 20 N).

⚠️ Assembly of not fully engaged connectors is not permitted, as it could lead to permanent deflection of clips and potential loss of locking function. Assembly must always be verified.

Unmated connectors must be protected from contamination using Stäubli sealing caps.

Disconnecting

Use the PV-MS-PLS/2 tool to disconnect.

Notes on Installation

General Notes

Cable Routing

Cable management must allow a minimum of 20 mm of cable exiting directly from the cable seal without bending or stress. Refer to cable manufacturer specifications for minimum bending radius.

[Diagram: Cable routing showing a straight exit of 20mm from the cable seal]

Contaminated/Damaged Connectors

Mechanical Stress

Technical Data

ParameterSpecification
Type DesignationPV-ADB4-EVO ST/x, PV-ADS4-EVO ST/x
Connector SystemØ 4 mm
Rated VoltageDC 1500 V (IEC 62852:2014+Amd.1:2020)
DC 1500 V (UL 6703)
Rated Current (IEC)32 A (2.5 mm²)
42 A (4.0 mm²)
47 A (6.0 mm²)
62 A (10 mm²)
Rated Current (UL)30 A (14 AWG)
35 A (12 AWG)
50 A (10 AWG)
70 A (8 AWG)
Rated Impulse Voltage16 kV
Ambient Temperature Range-40 °C...+85 °C (IEC)
-40 °C...+90 °C (UL)
Transportation/Storage Temperature Range-30 °C/+60 °C
Transportation/Storage Relative Humidity< 70%
Upper Limiting Temperature115 °C
Degree of Protection, MatedIP65/IP68 (1 m, 1 h)
Degree of Protection, UnmatedIP2x
Overvoltage CategoryIII
Contact SystemMULTILAM
Type of TerminationCrimping
Contact MaterialCopper, tin plated
Insulation MaterialPA
Twist LockD-Form (see ill. 13)
Flame ClassUL94-V0
Compatible with Connector typeMC4-Evo stor (PV-KST4-EVO ST/...; PV-KBT4-EVO ST/...)
TÜV Rheinland Certified according to IEC 62852:2014+Amd.1:2020R 60163467
UL Certified according to UL 6703E343181
Models: MA702, PV-ADB4-EVO ST, PV-ADS4-EVO ST, PV-ADB4-EVO ST MC4-Evo Stor Connector, PV-ADB4-EVO ST, MC4-Evo Stor Connector, Stor Connector, Connector

File Info : application/pdf, 12 Pages, 1.80MB

PDF preview unavailable. Download the PDF instead.

v1 Adobe PDF Library 17.0

Related Documents

Preview Herramientas y Accesorios Stäubli para Energía Solar Fotovoltaica
Catálogo completo de herramientas y accesorios Stäubli diseñados para instalaciones solares fotovoltaicas. Incluye crimpadoras, pelacables, llaves de apriete, cortadores de cable, maletines, cinturones portaherramientas y accesorios esenciales para el montaje y mantenimiento de sistemas fotovoltaicos.
Preview Stäubli MC4-Evo 2 Panel Receptacle MA299 Assembly Instructions
Comprehensive assembly instructions for the Stäubli MC4-Evo 2 panel receptacle (MA299), covering safety, tools, preparation, installation, mating, and technical data for photovoltaic systems.
Preview Stäubli MC4 & MC4-Evo 2 Tools and Accessories for Solar PV
Explore the comprehensive range of Stäubli tools and accessories designed for MC4 and MC4-Evo 2 connectors, essential for solar photovoltaic installations. Find crimping tools, stripping pliers, cable cutters, and more.
Preview Stäubli MC4 Connector MA231 Assembly Instructions and Technical Data
Comprehensive assembly instructions, safety guidelines, and technical specifications for the Stäubli MC4 connector MA231, designed for photovoltaic applications. Covers preparation, crimping, assembly checks, and technical data.
Preview Stäubli MC4-Evo Ready Connector MA293 Assembly Instructions
Comprehensive assembly instructions for the Stäubli MC4-Evo Ready MA293 connector. This guide covers essential safety precautions, required tools, detailed cable preparation steps, connector assembly, fastening, mating, and disconnecting procedures, along with technical specifications for photovoltaic applications.
Preview Stäubli MC4-Evo Ready Connector MA293 Assembly Instructions
Comprehensive assembly instructions for Stäubli MC4-Evo Ready connectors (MA293), covering safety, tools, cable preparation, assembly, mating, disconnecting, and technical data for PV-KST4-EVO READY and PV-KBT4-EVO READY.
Preview Stäubli MC4-Evo stor Connectors for Solar Energy Storage
Discover the Stäubli MC4-Evo stor connectors, designed for secure and reliable connections in solar energy storage systems. Featuring advanced safety features, high performance, and TÜV/UL certification for DC 1500V.
Preview Stäubli MC4-Evo 2 Branch Connector MA292: Assembly and Technical Data
Comprehensive assembly instructions and technical specifications for the Stäubli MC4-Evo 2 MA292 branch connector, including safety guidelines, installation notes, and product data for PV systems.