Geberit Installation Manual
Product: Geberit Monolith Sanitary Modules
Document Version: 965.267.00.0(08)
General Installation Guidelines
This manual provides instructions for the installation of Geberit Monolith sanitary modules for both floor-standing and wall-hung toilets.
The following languages are included for your convenience:
- English (Instructions de montage)
- German (Montageanleitung)
- French (Instructions de montage)
- Italian (Istruzioni per il montaggio)
Important Note: Please refer to the specific instructions for your Geberit AquaClean model.
Installation Steps
The installation process is divided into several key stages, illustrated with detailed diagrams. Please follow each step carefully.
Step 1: Mounting the Support Frame
Diagram Description: Shows the wall with mounting points. A frame is attached to the wall using screws. Dimensions indicate a height of 80±12 cm and a distance of 30±3 cm from the wall.
Action: Securely attach the support frame to the wall according to the indicated dimensions.
Step 2: Attaching the Cistern and Flush Valve
Diagram Description: Illustrates the connection of the cistern and flush valve to the support frame. It shows a sequence of connecting parts, including a water inlet and outlet.
Action: Connect the cistern and flush valve assembly to the mounted frame. Ensure all connections are secure.
Step 3: Connecting the Water Supply
Diagram Description: Depicts the connection of the flexible water supply hose to the flush valve and the main water line. It shows a tightening action and a duration of 10 seconds for flushing.
Action: Connect the water supply hose. Flush the system for approximately 10 seconds to ensure proper function.
Step 4: Securing the Front Panel
Diagram Description: Shows the front panel being attached to the frame. It involves sliding the panel into place and securing it with locking mechanisms.
Action: Align and attach the front panel to the installed unit.
Step 5: Installing the Flush Plate
Diagram Description: Illustrates the installation of the flush plate onto the front panel. It shows the plate being clicked into place.
Action: Mount the flush plate onto the front panel.
Step 6: Connecting the Geberit AquaClean Unit
Diagram Description: Details the connection of the Geberit AquaClean unit to the water supply and the waste pipe. It shows various fittings and hoses being connected.
Action: Connect the Geberit AquaClean unit according to the provided diagrams, ensuring all water and waste connections are properly made.
Step 7: Final Checks and Testing
Diagram Description: Shows tools being used for final adjustments and checks. It also indicates a 19 mm measurement, likely for a specific component.
Action: Perform all necessary checks and tests to ensure the unit is functioning correctly and safely.
Step 8: Securing the Unit
Diagram Description: Illustrates the final securing of the entire unit to the wall, possibly with additional brackets or fasteners.
Action: Ensure the entire installation is securely fastened to the wall.
Contact Information
For further information or support, please contact:
Geberit International AG
Schachenstrasse 77, CH-8645 Jona
Email: documentation@geberit.com
Website: www.geberit.com