Geberit Sigma40 Installation Manual
MONTAGEANLEITUNG | INSTRUCTIONS DE MONTAGE | ISTRUZIONI PER IL MONTAGGIO
Installation Steps
The following steps detail the installation process for the Geberit Sigma40 actuator plate.
Step 1: Preparation
Prepare the mounting surface as shown in the diagram. Ensure the frame is correctly positioned and secured.
[Diagram: Shows a frame being attached to a wall with arrows indicating placement and securing methods.]
Step 2: Mounting the Frame
Attach the mounting frame to the wall. Follow the numbered steps in the diagram for correct assembly.
[Diagram: Illustrates the mounting frame being assembled and attached, with numbered steps.]
Step 3: Securing the Frame
Ensure the frame is securely fastened to the wall, following the indicated steps.
[Diagram: Shows the frame being secured, possibly with screws or clips.]
Step 4: Water Connection
Connect the water supply. The diagram shows the connection point and the required duration for water flow (30 seconds).
[Diagram: Depicts the water inlet connection with a timer indicating 30 seconds.]
Step 5: Installing the Flush Valve
Install the flush valve mechanism into the mounting frame. Pay attention to the orientation and locking mechanism.
[Diagram: Shows the flush valve being inserted and locked into place.]
Step 6: Final Frame Assembly
Complete the assembly of the mounting frame, ensuring all parts are correctly fitted.
[Diagram: Illustrates the final assembly of the mounting frame.]
Step 7: Alignment
Ensure the frame is flush with the wall surface (0 mm offset).
[Diagram: Shows the frame positioned flush against the wall.]
Step 8: Attaching the Actuator Plate
Attach the actuator plate to the frame. Ensure it is level and at a 90-degree angle during attachment.
[Diagram: Illustrates the actuator plate being attached, showing a 90-degree angle and alignment.]
Step 9: Securing the Actuator Plate
Secure the actuator plate in place. The diagram shows the clips engaging to hold the plate.
[Diagram: Shows the mechanism for securing the actuator plate, likely clips.]
Step 10: Final Alignment and Attachment
Perform final alignment checks, ensuring a 0 mm offset from the wall and a 90-degree angle for the plate.
[Diagram: Depicts final alignment checks for the actuator plate.]
Step 11: Mounting the Cover Plate
Attach the cover plate to the actuator mechanism. Ensure correct positioning and engagement.
[Diagram: Shows the cover plate being fitted over the actuator.]
Step 12: Final Plate Installation
Install the final actuator plate onto the mounted assembly.
[Diagram: Shows the actuator plate being placed onto the installed mechanism.]
Step 13: Flush Plate Operation
The diagram illustrates the dual flush functionality, showing how to activate the full or reduced flush.
[Diagram: Shows two flush buttons and arrows indicating their function for different flush volumes.]
Contact Information
For further information or support, please contact:
Geberit International AG
Schachenstrasse 77, CH-8645 Jona
Email: documentation@geberit.com
Website: www.geberit.com