Geberit Duofix Installation Manual
Product Overview
This document provides detailed installation instructions for the Geberit Duofix system. It includes multilingual guidance for mounting and assembly.
Languages included: German (Montageanleitung), English (Instructions de Montage), French (Instructions de Montage), Italian (Istruzioni per il Montaggio).
Key Features:
- Know How Installed: Indicates expertise and proper installation.
- Tools Required: Various tools are depicted in the diagrams, including wrenches and screwdrivers.
Dimensions and Specifications
The diagrams illustrate various dimensions crucial for installation. Key measurements include:
- Width: 50 cm
- Depth adjustment: 0-25 cm
- Height options: 82 cm and 98 cm
- Wall mounting depth: 135-20 mm
- Drilling diameter: 10 mm and 13 mm
- Minimum wall clearance: ≥ 10 mm, ≥ 18 mm
Refer to the diagrams for precise placement and measurement details.
Installation Steps
The installation process is broken down into numbered steps, often with sub-steps indicated by letters or additional numbers. Below is a summary of the key stages:
Step 1: Preparation and Initial Mounting
- 1 A: Mounting the Duofix frame to the wall. This involves securing the frame using appropriate fixings.
- 1 B: Securing the Duofix system.
- The diagrams show the use of specific components like the 111.815.00.1 fixing set.
- Ensure the frame is level and plumb before proceeding.
Step 2: Frame Assembly and Adjustment
- Step 2 (Page 4): Assembling the main frame structure. This involves connecting various parts using screws and bolts. The diagram shows a 13 mm drill bit being used for mounting.
- Step 3 (Page 4): Securing the frame to the wall. This step emphasizes the importance of correct alignment and fixing.
- Step 4 (Page 5): Further securing the frame, possibly to the floor and wall.
- Step 5 (Page 5): Adjusting the height and position of the frame components.
- Step 6 (Page 5): Finalizing the frame assembly.
Step 3: Connecting Plumbing and Final Checks
- Step 7 (Page 5): Connecting water supply lines.
- Step 8 (Page 5): Installing flushing mechanisms or other related components.
- Steps 2 & 3 (Page 7): Detailed views of component assembly and connection.
- Steps 5 & 6 (Page 9): Further adjustments and checks, including ensuring a 90° angle for certain connections.
- Step 7 (Page 9): Final mounting and securing of components.
- Step 8 (Page 9): Tightening fixings with a T40 driver.
- Step 9 (Page 9): Final checks and adjustments.
Step 4: Wall Cladding and Final Installation
- Step 2 (Page 10): Illustrates different measurement ranges (A, B, C, D, E) for wall cladding and component placement.
- Step 3 (Page 10): Shows the process of attaching wall panels or cladding to the installed frame, using 13 mm fixings.
- Step 4 (Page 10): Further steps in securing the cladding.
- Step 5 (Page 11): Final checks for correct installation and alignment.
- Step 3 (Page 11): Final tightening of fixings with a T25 driver.
- Step 4 (Page 12): Final mounting and securing of the system within the wall structure.
Important Notes and Safety
- Always ensure that the correct tools and fixings are used as specified in the diagrams.
- Pay close attention to the dimensions and clearances indicated to ensure proper functionality and safety.
- The installation requires precision; refer to the detailed diagrams for each step.
- For any questions or further information, consult the Geberit website: www.geberit.com or contact them via email at documentation@geberit.com.
Contact Information
Geberit International AG
Schachenstrasse 77, CH-8645 Jona
Email: documentation@geberit.com
Website: www.geberit.com