Edge-core AS4630-54NPE Ethernet Switch logo

Edge-core AS4630-54NPE Ethernet SwitchEdge-core AS4630-54NPE Ethernet Switch prod

Package ContentsEdge-core AS4630-54NPE Ethernet Switch fig1

  1. AS4630-54NPE or AS4630-54NPEM Ethernet Switch
  2. Rack mounting kit—2 brackets and 8 screws
  3. 2 x Power cord
  4. Console cable—RJ-45 to D-Sub
  5. Documentation—Quick Start Guide (this document) and Safety and Regulatory Information

OverviewEdge-core AS4630-54NPE Ethernet Switch fig2

  1. 1x USB port
  2. 1 x Management port
  3. 1 x Serial console port
  4. System buttons/LEDs
  5. 36 x RJ45 2.5G PoE ports
  6. 12 x RJ45 10G PoE Ports
  7. 4 x SFP28 25G ports
  8. 2 x QSFP28 40G/100G uplink or stacking ports
  9. 3 x Fan trays
  10. 2 x AC PSUs

System Buttons/LEDsEdge-core AS4630-54NPE Ethernet Switch fig3

  • STK M/S button
  • Reset button
  • System LED: Green (OK), Amber (fault)
  • PRI LED: Green (primary unit), Amber (secondary unit) PSU LEDs: Green (OK), Amber (fault)
  • STK LEDs: Green (stacking ports active)
  • FAN LED: Green (OK), Amber (fault)
  • PoE LED: Green (OK), Amber (High PoE load)

Port/FRU LEDsEdge-core AS4630-54NPE Ethernet Switch fig4

  • RJ-45 Port LEDs: Green (link), Amber (link with PoE), Blinking (activity)
  • SFP28 Port LEDs: White (25G), Green (10G), Blinking (activity)
  • QSFP28 Port LEDs: White (100G), Green (40G link), Blinking (activity)
  • PSU Status LED: Green (OK), Red (fault or fan failure)
  • Fan Tray Status LED: Green (OK), Red (fault)

FRU ReplacementEdge-core AS4630-54NPE Ethernet Switch fig5

PSU Replacement

  1. Remove the power cord.
  2. Press the release latch and remove the PSU.
  3. Install replacement PSU with matching airflow direction.

Fan Tray Replacement

  1. Loosen the fan tray screw.
  2. Remove fan tray from the chassis.
  3. Install replacement fan with matching airflow direction.

Mount the SwitchEdge-core AS4630-54NPE Ethernet Switch fig6

Attach the BracketsEdge-core AS4630-54NPE Ethernet Switch fig7Use the included screws to attach the front- and rear-post brackets.

Mount the SwitchEdge-core AS4630-54NPE Ethernet Switch fig11Mount the switch in the rack and secure it with rack screws.

Lock the Rear-Post Brackets
Use the included screws to lock the position of the rear-post brackets.
Optional Slide-Rail Installation
An optional slide-rail kit is available for rack installation. Follow the installation procedure provided with the kit.

Connect PowerEdge-core AS4630-54NPE Ethernet Switch fig8

AC Power
Install two AC PSUs and connect them to an AC power source.

Verify Switch Power

Check the PSU LEDs
The PSU1/PSU2 LEDs should be on green when operating normally.

Perform Initial System Boot

ONIE Installer Software
If the network operating system (NOS) installer is located on a network server, first connect the RJ-45 Management (Mgmt) port to the network using 100-ohm Category 5, 5e or better twisted-pair cable. (Not required if the NOS installer is located on attached storage.)
Boot the Switch
Wait for the ONIE software to locate and execute the NOS installer, and then wait for the installer to load the NOS software image. Subsequent switch boots will bypass ONIE and directly run the NOS software.

Note: For switches with ONIE software pre-loaded, refer to the network operating system (NOS) installer and NOS documentation for details on software options and set up for ONIE.

Make Network ConnectionsEdge-core AS4630-54NPE Ethernet Switch fig9

  1. RJ-45 2.5G ports
    Connect 100-ohm Category 5e, 6a or 7 twisted-pair cable. Ports can support PoE connections up to 90 W.
  2. RJ-45 10G ports
    Connect 100-ohm Category 6, 6a or 7 twisted-pair cable. Ports can support PoE connections up to 90 W.
  3. SFP+/SFP28 slots
    First install SFP+/SFP28 transceivers and then connect fiber optic cabling to the transceiver ports.

(Optional) Make Stack ConnectionsEdge-core AS4630-54NPE Ethernet Switch fig10

  1. Connect the top device
    Plug one end of a DAC cable in the bottom QSFP28 port of the top unit.
  2. Connect the next device
    Plug the other end of the DAC cable into the top QSFP28 port of the next unit.
  3. Repeat
    Repeat for each unit in the stack.
  4. (Optional) Connect the top and bottom devices
    Plug one end of a DAC cable into the bottom QSFP28 port on the bottom unit and the other end into the top QSFP28 port on the top unit.
  5. Reboot
    Reboot each switch in the stack to start the stack operations.

Note: Stacking support is dependent on the switch software. For stacking support information, refer to the NOS software documentation.

Hardware Specifications

Switch Chassis

  • Size (WxDxH)    438 x 474 x 44 mm
  • Weight  8.5 kg (18.74 lb), with two installed PSUs
  • Temperature  Operating: 0° C to 45° C (32° F to 113° F) Storage: -40° C to 70° C (-40° F to 158° F)
  • Humidity    Operating: 5% to 90% (non-condensing)

1 x 920 W Power Supply

  • AC Input  100–120 Vac, 50-60 Hz, 12 A (Not for China) 200–240 Vac, 50-60 Hz, 6 A
  • Power Consumption    920 W max.
  • PoE Power Budget    620 W

2 x 920 W Power Supplies

  • AC Input    100–120 Vac, 50-60 Hz, 12 A (Not for China) 200–240 Vac, 50-60 Hz, 6 A
  • Power Consumption    1840 W max.
  • PoE Power Budget      1540 W

1 x 1200 W Power Supply

  • AC Input    100–120 Vac, 50-60 Hz, 15 A (Not for China) 200–240 Vac, 50-60 Hz, 8 A
  • Power Consumption    1000 W max. (100–120 Vac PSU) 1200 W max. (200–240 Vac PSU)
  • PoE Power Budget      700 W (100–120 Vac PSU) 900 W (200–240 Vac PSU)

2 x 1200 W Power Supplies

  • AC Input    100–120 Vac, 50-60 Hz, 15 A (Not for China) 200–240 Vac, 50-60 Hz, 8 A
  • Power Consumption    2000 W max. (100–120 Vac PSUs) 2400 W max. (200–240 Vac PSUs)
  • PoE Power Budget    1700 W (100–120 Vac PSUs) 2100 W (200–240 Vac PSUs)

Regulatory Compliances

  • Emissions    EN 55032:2015+AC:2016, Class A EN 61000-3-2:2014, Class A EN 61000-3-3:2013 FCC Class A VCCI Class A CCC GB 9254-2008, Class A BSMI Class A, CNS 13438
  • Immunity  IEC 61000-4-2/3/4/5/6/8/11
  • Safety      UL (UL 62368-1 & CSA C22.2 No. 62368-1) CB (IEC/EN 60950-1, IEC/EN 62368-1) CCC GB4943.1-2011 BSMI, CNS 14336-1
  • Taiwan RoHS   CNS 15663

Warning: For a safe and reliable installation, use only the accessories and screws provided with the device. Use of other accessories and screws could result in damage to the unit. Any damages incurred by using unapproved accessories are not covered by the warranty.

Caution: The device includes plug-in power supply (PSU) and fan tray modules that are installed into its chassis. Make sure all installed modules have a matching airflow direction (front-to-back).

Note: The device has the Open Network Install Environment (ONIE) software installer preloaded on the switch, but no switch software image. Information about compatible switch software can be found at www.edge-core.com.

Documents / Resources

Edge-core AS4630-54NPE Ethernet Switch [pdf] User Guide
AS4630-54NPE, AS4630-54NPEM, Ethernet Switch

References

Leave a comment

Your email address will not be published. Required fields are marked *