The 3-in-1 Docking Station functions as a clean out tray, charging station, and storage tray for machine, brush rolls, and filter

Clean Out Cycle:

  • Plug in the docking station
  • Place machine on docking station
  • Fill clean water tank with warm tap water and formula to the clean out cycle icon on the tank
    • Put clean water tank back on machine

  • Press clean out cycle button and let machine go through full 40 second cycle
    • If machine stops in middle of cycle and orange dirt tank indicator starts blinking on digital display, remove and empty dirty water tank
      • Clean out cycle button will be inactive until dirty water tank is emptied
      • Place empty dirty water tank back on machine, click clean out cycle button and the clean out cycle will resume
 
  • If machine does not start the clean out cycle when the button is pushed, re-seat the machine onto the dock and allow it to charge for 30 minutes before trying again
  • When cycle is complete, remove brush roll window by pressing the button on the top of the foot and resting the brush roll window on the 3-in-1 docking station

  • Pull up on brush tab to remove brush roll
    • Place brush roll in drying tray to air dry

                                

  • Allow filter to dry for 24 hours after cleaning
    • Place filter in drying tray to air dry
  • Take machine off docking station
    • Wipe off any excess water on docking station
    • Wipe off the charging prongs

                 

Charging:

  • Plug adaptor into wall outlet
  • Put machine on docking station
    • Battery LED lights will illuminate white while charging
  • If lights are not on, remove machine and realign on docking station
  • If one light is blinking white, battery is at less than 10%
  • For a full charge allow machine to charge for 4 hours
    • 3 white lights indicate a fully charged battery when machine is docked & turned on

 

Was this answer helpful?


References

Leave a comment

Your email address will not be published. Required fields are marked *