The 3-in-1 Docking Station functions as a rinse and clean out tray, charging station and storage tray for the machine and brush roll
Clean Out Cycle:
  • Place machine on the docking station
    • Docking station needs to be plugged in for clean out cycle to work
  • Pour water into the Rinse Funnel up to the max fill line
  • Hold down the Clean Out button for 10 – 15 seconds
    • If clean out cycle does not immediately start when the button is pressed, let machine charge for 15 minutes before trying again
    • Allow machine to flush out & pick up all the water
    • Repeat as needed
    • Clean out cycle runs for a maximum of 1 minute, if button is held down longer machine will automatically stop
  • Remove brush roll window by grasping the front and pulling upward
  • Pull the tab on brush up to remove brush roll
    • The brush roll can be placed in the drying tray to air dry
                                 
  • Take machine off the docking station and wipe off any excess water on the docking station
  • Return machine to docking station for storage
  • The clean & dirty water tank should be emptied and cleaned before storing machine
Charging:
  • Plug the adaptor into wall outlet
  • With machine on docking station the LED lights will illuminate white while charging
  • If the lights are not on, remove machine and realign on the docking station
  • If one light is blinking red the battery is at less than 10%
  • For a full charge allow the machine to charge for 4 hours
    • 3 lights indicate a fully charged battery

 

References

Leave a comment

Your email address will not be published. Required fields are marked *