The 3-in-1 Docking Station functions as a rinse and clean out tray, charging station and storage tray for the machine and brush roll
Clean Out Cycle:
- Place machine on the docking station
- Docking station needs to be plugged in for clean out cycle to work
- Pour water into the Rinse Funnel up to the max fill line

- Hold down the Clean Out button for 10 – 15 seconds
- If clean out cycle does not immediately start when the button is pressed, let machine charge for 15 minutes before trying again
- Allow machine to flush out & pick up all the water
- Repeat as needed
- Clean out cycle runs for a maximum of 1 minute, if button is held down longer machine will automatically stop

- Remove brush roll window by grasping the front and pulling upward

- Pull the tab on brush up to remove brush roll
- The brush roll can be placed in the drying tray to air dry


- Take machine off the docking station and wipe off any excess water on the docking station

- Return machine to docking station for storage
- The clean & dirty water tank should be emptied and cleaned before storing machine
Charging:
- Plug the adaptor into wall outlet
- With machine on docking station the LED lights will illuminate white while charging
- If the lights are not on, remove machine and realign on the docking station
- If one light is blinking red the battery is at less than 10%
- For a full charge allow the machine to charge for 4 hours
- 3 lights indicate a fully charged battery