The 3-in-1 Docking Station functions as a clean out tray, charging station, and storage tray for machine, brush rolls, and filter

  • Before placing machine on 3-in-1 Docking Station make sure Brush Roll Drying Tray is installed correctly, once it is securely installed it will click and sit flush on the floor

Clean Out Cycle:

  • Place machine on docking station
  • Make sure docking station is plugged in
  • Fill clean water tank with warm tap water to the clean out cycle icon on the tank
    • Put clean water tank back on machine

  • Press clean out cycle button and let machine go through full 40 second cycle
    • If machine stops in middle of cycle and orange dirt tank indicator starts blinking on digital display, remove and empty dirty water tank
      • Clean out cycle button will be inactive until dirty water tank is emptied
      • Place empty dirty water tank back on machine and the clean out cycle with resume
  • If machine does not start the clean out cycle when the button is pushed, re-seat the machine onto the dock and allow it to charge for 10 minutes before trying again
  • Repeat as needed
  • When cycle is complete, remove brush roll window by grasping front and pulling upward

  • Pull tab on brush up to remove brush roll
    • Place brush roll in drying tray to air dry

                                

  • Take machine off docking station
    • Wipe off any excess water on docking station

  • Return machine to docking station
  • Empty and clean both tanks before storing machine

Charging:

  • Plug adaptor into wall outlet
  • With machine on docking station, battery LED lights will illuminate white while charging
  • If lights are not on, remove machine and realign on docking station
  • If one light is blinking white battery is at less than 10%
  • For a full charge allow machine to charge for 4 hours
    • 3 white lights indicate a fully charged battery

 

Was this answer helpful?


References

Leave a comment

Your email address will not be published. Required fields are marked *