Purpose
All financed installations require photos to be uploaded to their respective Account in the Dealer Portal. Below is a list of the photos required to close out an installation. To upload photos to the Dealer Portal, refer to "Uploading Invoice Compliance Documents" and "Understanding the Required Job Close-Out Photos" in SunPower University.
Instructions
- Every photo listed is required. If a photo cannot be provided, include a detailed explanation; forgetting to take a particular photo is not a sufficient reason. For example, a valid reason photo #7 might not be provided could be because there was no conduit penetration because the conduit wraps around the gable end. (State that, if so.)
- To expedite the review, please upload the photos in the order listed below.
- Save the document as a PDF, using the following naming convention: *Client LAST NAME* - *DATE OF INSTALLATION* - SunPower JCO. Example: O'LEARY – 04072019 – SunPower JCO
- Verify the file size (all photos combined) is 10MB or less.
Photos Required for Equinox PV Projects
# | Description |
---|---|
1 | Physical address (number) with home in the background |
2 | All installed modules in the entire system (multiple photos may be required) |
3 | Rooftop J-Box, lid removed, showing completed wiring |
4 | Wire management under the arrays |
5 | Bonding of all rows of modules (bare copper or row-to-row ground clips) |
6 | Conduit penetration on site, showing flashing; must be on roof while taking this photo |
7 | Wide-angle shot of ALL electrical equipment; capture indoor equipment if applicable |
8 | Solar subpanel: Cover removed, showing wiring and breaker sizes (if applicable) |
9 | AC Disconnect: Door open, showing completed wiring and clear fuse sizes (if applicable) |
10 | Interconnection: (e.g., main panel, meter enclosure) wide angle of enclosure with cover removed |
11 | Interconnection: Close-up of solar breaker OR 2 photos showing piercing taps and fuses |
12 | Array layout diagram with microinverter serial numbers (stickers) |
13 | PVS wiring (cover removed), including PVS serial number (serial number is bare minimum requirement) |
Additional Photos for SunPower New Home Communities
- Lot name and community name
Additional Photos for OneRoof™ (if applicable)
- Underlayment in place and bibbed, with bottom OneRoof panel and flashing
- Top flashing installed, bibbed, and sealed
Additional Photos for Wallbox EV Charger (if applicable)
- Wide-angle and close-up wiring shot
SunVault™ Storage Checklist on next page
Additional Photos for Projects Featuring SunPower® SunVault Storage
# | Description |
---|---|
1 | Filled-out system check form on inside of Hub+ door |
2 | Wide angle of outside of SunVault-related electrical equipment; must include the utility meter or meter/main panel |
3 | Wide angle of inside electrical relating to SunVault (if applicable) |
4 | Main service panel w/ cover removed showing wiring |
5 | Hub+, door open, w/ cover on showing all Hub+ circuits |
6 | Hub+, door open, w/ cover removed showing top half of Hub+ |
7 | Hub+, door open, w/ cover removed showing bottom half of Hub+ |
8 | Field-installed backup and non-backup load centers, cover removed (if applicable) |
9 | Hub+ MIDC wiring, confirming connection of all data cables in J10, J13, J14, J15, J16 ports |
10 | All factory- and field-installed Consumption CTs and any Consumption CT wire splices |
11 | All factory- and field-installed Production CTs and any Production CT wire splices |
12 | ESS Gateway communication wiring, close-ups (2 photos required) |
13 | ESS photo of inverter wiring terminations |
14 | Expansion photos for 26 kWh systems: all AC and DC wiring termination in ESS (torque marks visible) |
Notes