Fronius Backup Switch 1P/3P-63A Quick Start Guide

Brand: Fronius

Introduction

This document provides a quick start guide for the Fronius Backup Switch 1P/3P-63A. It covers essential safety information, installation, wiring, and configuration.

For detailed information, please refer to the full operating instructions available at https://manuals.fronius.com/html/4204260536.

Important Safety Information

WARNING! Incorrect operation or poorly executed work can cause serious injury or damage. Installation and commissioning must be carried out by trained personnel in accordance with nationally applicable standards and guidelines. Before working with the device, ensure that you have read and understood all the documents provided. When PV modules are exposed to light, they supply voltage to the inverter. This document does not describe all possible system configurations.

Warning Signs Explanation

⚠️ General warning sign

Electricity hazard

Switching OFF

Diagram shows a rotary switch being turned from the 'ON' position to the 'OFF' position.

Mounting

Diagram illustrates the process of mounting the Fronius Backup Switch onto a DIN rail.

Positioning

Diagram depicts a typical photovoltaic (PV) system layout, showing the connection of PV modules, inverter, battery, and the backup switch within a hybrid system.

Power Wiring

Conductor per terminalTerminal 1Terminal 2
CU wire1 - 25 mm²≤10 mm²
CU wire (ferrule)4 - 16 mm²≤10 mm²
Ferrule2.5 - 16 mm²≤10 mm²
Torque3 Nm (2.2 ft-lb)

Diagram shows the connection points for power wiring, indicating terminal sizes and torque specifications.

Option: 1P Separation

Diagram illustrates the wiring configuration for single-phase (1P) separation.

Option: 3P Separation

Diagrams illustrate the wiring configurations for three-phase (3P) separation, showing connections for L1, L2, L3, and their respective terminals.

Data Wiring

Conductor per terminalTerminal 1Terminal 2
CU wire0.13 - 10 mm²0.13 - 2.5 mm²
CU wire (ferrule)0.5 - 6 mm²0.13 - 2.5 mm²
Ferrule0.5 - 6 mm²0.13 - 2.5 mm²
Torque0.8 - 1.7 Nm

Diagram shows the connection points for data wiring, indicating terminal sizes and torque specifications.

Option: Modbus RTU

Table lists Smart Meter models and their pin assignments for connection to the inverter via the backup switch.

Smart MeterPinInverter Connection
IPM-, GND, M+M+, WSD IN-, IN7, IN6, V+, WSD IN+, GND, M-
50kA-3B, C, AM+, WSD IN-, IN7, IN6, V+, WSD IN+, GND, M-
63A-134, 35, 33M+, WSD IN-, IN7, IN6, V+, WSD IN+, GND, M-
63A-3B, C, AM+, WSD IN-, IN7, IN6, V+, WSD IN+, GND, M-
TS 5kA-312, 13, 11M+, WSD IN-, IN7, IN6, V+, WSD IN+, GND, M-
TS 65A-39, 10, 8M+, WSD IN-, IN7, IN6, V+, WSD IN+, GND, M-
TS 100A-15, 6, 4M+, WSD IN-, IN7, IN6, V+, WSD IN+, GND, M-

Wiring diagram shows connections between the Smart Meter and the Inverter, routed through the backup switch, with specific terminal labels (23, 24, 13, 14) and conductor colors (green, blue, brown, dashed green).

Option: Modbus TCP/IP | MQTT

Wiring diagram illustrates connections for Modbus TCP/IP or MQTT communication, showing the Smart Meter IP, Grid, and Inverter connections.

Mounting the Protective Cover

Diagrams show the installation of a protective cover using screws, specifying screw size and torque values (e.g., 2.2 x 6.5 mm, 0.2 Nm).

Commissioning

Diagram shows the rotary switch being turned to the 'ON' position for commissioning.

User Interface Configuration

Configuration involves the following steps:

  1. Open the user interface of the inverter.
  2. Navigate to Device Configuration > Functions and I/Os.
  3. Activate Backup Power.
  4. Select Full Backup under Backup Power Mode.

Testing the Backup Power Function

Diagrams illustrate the switch positions for testing: 'Grid supply', 'OFF', and 'Backup power supply'.

Checklist - Backup Power

For a checklist and further resources, scan the QR code or visit:

https://www.fronius.com/en-us/usa/solar-energy/downloads

Search for: "42,0426,0365"

A QR code is provided, linking to Fronius downloads for solar energy products.

Contact and Resources

Fronius International GmbH

Froniusstraße 1
4643 Pettenbach
Austria

Email: contact@fronius.com

Website: www.fronius.com

For addresses of Fronius Sales & Service Partners and locations, visit www.fronius.com/contact.

Detailed, country-specific warranty terms are available on: www.fronius.com/solar/warranty

Information about monitoring and digital tools is available at: www.fronius.com/en/solar-energy/installers-partners/products-solutions/monitoring-digital-tools

Models: 42, 0410, 2974, 3P-63A Backup Switch, 3P-63A, Backup Switch, Switch

File Info : application/pdf, 8 Pages, 1.06MB

PDF preview unavailable. Download the PDF instead.

42,0410,2974

References

Adobe PDF Library 17.0 Adobe InDesign 20.5 (Windows)

Related Documents

Preview Fronius Backup Power Solution: GEN24 Plus, Components, and Energy Storage
Discover the Fronius Backup Power Solution, featuring the GEN24 and GEN24 Plus inverters, compatible batteries, and smart meters for reliable household energy security. Learn about system configurations, advantages, and digital tools for managing your PV system.
Preview Fronius Battery Storage Solution with GEN24 Plus and BYD Battery-Box
Information on the Fronius Battery Storage Solution, featuring the Fronius GEN24 Plus inverter and BYD Battery-Box Premium HVS/HVM. Details advantages, backup power options, and technical compatibilities.
Preview Fronius Backup Switch 1PN/3PN-63A Quick Start Guide
A quick start guide for the Fronius Backup Switch 1PN/3PN-63A, covering installation, mounting, data communication, user interface configuration, and testing the backup power function.
Preview Fronius Symo GEN24 Quick Start Guide
Quick start guide for the Fronius Symo GEN24 inverter, covering installation, connection, and commissioning. Includes technical specifications and safety warnings.
Preview Fronius Smart Meter TS 5kA-3 Quick Start Guide
A concise guide for installing and configuring the Fronius Smart Meter TS 5kA-3, detailing technical specifications, safety precautions, and step-by-step setup instructions for solar energy systems.
Preview Fronius Reserva: High-Voltage Battery Storage System Technical Specifications
Explore the technical details and specifications of the Fronius Reserva, an efficient DC-coupled high-voltage battery storage solution for residential solar energy systems. Learn about its capacity, performance, components, and compatibility with Fronius hybrid inverters.
Preview Fronius Smart Meter TS 100A-1 Quick Start Guide
A quick start guide for the Fronius Smart Meter TS 100A-1, providing essential information for installation and initial setup. Includes technical specifications and safety warnings in multiple languages.
Preview Fronius Primo GEN24 Plus Series Quick Start Guide: Installation & Setup
Comprehensive guide for installing and commissioning Fronius Primo GEN24 Plus series solar inverters. Covers technical specifications, mounting, electrical connections, and system setup with the Fronius Solar.start app.