Fronius Smart Meter TS 100A-1 Quick Start Guide
This guide provides essential information for the installation and initial setup of the Fronius Smart Meter TS 100A-1.
Important Safety Information
WARNING! Incorrect operation and incorrectly performed work can cause serious personal injury or material damage. The Fronius Smart Meter may only be installed and commissioned by trained personnel and only within the scope of the technical regulations. Before working with the device, read and understand all enclosed, printed and online documents! This document does not describe all of the possible system configurations.
This warning is also available in German (DE), French (FR), Italian (IT), Spanish (ES), Danish (DA), and Portuguese (PT).
Technical Specifications
Fronius Datamanager 2.0 | ≥ 3.16.1 version |
Fronius Symo Hybrid | ≥ 1.16.1 version |
Nominal voltage (1-phase) range | 230 V (-30% to +20%) |
Self-consumption - voltage path (max. voltage) | ≤ 8 VA |
Nominal frequency | 50-60 Hz |
Tolerance | 45-65 Hz |
Nominal current, I | 5 A |
Maximum current, Imax | 100 A |
Starting current | 40 mA |
Short-time overload | 301 / 0.001 s max |
Self-consumption - current path (max. current) | ≤ 1 W |
Power factor | cosφ 0.5 ind - 0.8 cap |
Operating range (EN IEC 62053-21, EN IEC 62053-23) | In accordance with EN 62053-21 |
Current distortion factor | In accordance with EN IEC 62052-11, EN 50470-3 |
RS485 communication (Electrically isolated from measuring input) | RS485-3 conductors |
Standard | 1-255 |
Addresses | 9600, 19200 bit/s |
Baud rate | ≤ 200 ms |
Response time | III |
Installation category | 2 |
Degree of pollution | 4000 VAC RMS (1 min) |
Insulation voltage | In accordance with EN IEC 62052-11, EN 50470-3 |
Emission test | In accordance with EN IEC 62052-11, EN 50470-3 |
Immunity test | In accordance with EN IEC 62052-11, EN 50470-3 |
Reference temperature | 25 °C (± 5 °C) |
Operating range | -25 to +65 °C |
Temperature limit for storage and transport | -30 to +80 °C |
Mechanical environment | M2 |
Electromechanical environment | E2 |
Housing | 2 modules according to DIN 43880 |
Sealable housing/terminal cover | Screw connection |
Connection | Can be snapped onto 35 mm DIN rail |
Mounting | Noryl, self-extinguishing |
Housing material | IP51 housing, IP20 connections |
Degree of protection (EN 60529) | 160 grams |
Weight | max. 25 mm² |
Wire | max. 25 mm² |
Recommended torque | max. 2.8 Nm |
Wire | min 0.05 mm² |
Recommended torque | max. 0.4 Nm |
Installation Steps
- Switch off the circuit breaker [AC-OFF].
- Mount the Smart Meter.
- Connect the wiring for 1 phase, 2 wires (refer to diagrams 3a and 3b).
- Mount the protective cover.
- Connect the data cables (e.g., to an inverter or other devices).
- Set up the terminating resistor (Steps 6-7).
- Mount the connector covers.
- Switch on the circuit breaker [AC-ON].
- Navigate in the settings: Use page up/down for value selection and adjust/confirm with a 2-second press.
- Enter the settings.
- Set up the password (default: 2633).
- Set up the address (default Modbus Address: 001).
- Cut the settings (exit settings).
- Start up the Smart Meter. Download the Fronius Solar.start app from the App Store or Google Play for installation assistance.
Further Information
For detailed, country-specific warranty terms, visit: www.fronius.com/solar/warranty
More information and documentation can be found at: manuals.fronius.com/html/4204260350
File Info : application/pdf, 2 Pages, 832.09KB
DocumentDocumentReferences
PDFium PDFiumRelated Documents
![]() |
Fronius Smart Meter TS 5kA-3 Quick Start Guide A concise guide for installing and configuring the Fronius Smart Meter TS 5kA-3, detailing technical specifications, safety precautions, and step-by-step setup instructions for solar energy systems. |
![]() |
Fronius Smart Meter TS 65A-3 Quick Start Guide - Installation and Specifications Concise guide for installing and configuring the Fronius Smart Meter TS 65A-3. Includes technical specifications, step-by-step installation instructions, and safety warnings. |
![]() |
Fronius Smart Meter TS 65A-3 Operating Instructions Comprehensive guide for the Fronius Smart Meter TS 65A-3, covering installation, configuration, and operation for optimizing solar energy self-consumption and monitoring household energy usage. |
![]() |
Fronius Smart Meter WR Operating Instructions This document provides comprehensive operating instructions for the Fronius Smart Meter WR, covering safety guidelines, installation procedures, configuration steps, operational details, and technical specifications. |
![]() |
Fronius Symo GEN24 Quick Start Guide Quick start guide for the Fronius Symo GEN24 inverter, covering installation, connection, and commissioning. Includes technical specifications and safety warnings. |
![]() |
Fronius Backup Switch 1P/3P-63A Quick Start Guide Concise guide for installing and operating the Fronius Backup Switch 1P/3P-63A. Includes safety warnings, wiring instructions, and configuration steps. |
![]() |
Fronius Ohmpilot Operating Instructions Comprehensive operating instructions for the Fronius Ohmpilot, detailing its features, installation, and usage for efficient energy management and hot water preparation using solar power. |
![]() |
Fronius Backup Power Solution: GEN24 Plus, Components, and Energy Storage Discover the Fronius Backup Power Solution, featuring the GEN24 and GEN24 Plus inverters, compatible batteries, and smart meters for reliable household energy security. Learn about system configurations, advantages, and digital tools for managing your PV system. |