Geberit Typ 333 Installation Manual
Montageanleitung | Instructions de montage | Istruzioni per il montaggio
Installation Steps
-
Step 1: Preparation
Ensure you have the necessary tools. The image shows a wrench symbol indicating tools are needed. The diagram illustrates the fill valve components and their placement within a cistern.
-
Step 2: Water Connection
Connect the water supply. The diagram shows two connection options: G 3/8" and G 1/2". The text "30 s" suggests a possible waiting or flushing time.
-
Step 3: Water Level Adjustment
Adjust the water level (WL) in the cistern. The diagram shows a process involving turning a screw (①) and ensuring the water level is at least 20 mm below the overflow (CL). The arrow indicates a direction for adjustment.
Product Information
Brand: Geberit
Model: Typ 333
Manufacturer: Geberit International AG
Contact: documentation@geberit.com | www.geberit.com
Address: Schachenstrasse 77, CH-8645 Jona