Friedrich VRP Variable Refrigerant Packaged Heat Pump

Innovative | Intelligent | Inverter

VRP36K

For Commercial and Residential Applications

One or more of the following patents may apply: 10408504, 10436457, 10488083, 10731899. Additional patents pending.

PRECISION INVERTER FreshAire™

Warnings

WARNING: Please read this manual thoroughly prior to equipment installation or operation. It is the installer's responsibility to properly apply and install the equipment. Installation must be in conformance with the NFPA 70-2008 National Electric Code or current edition, International Mechanic code 2009 or current edition and any other applicable local or national codes.

WARNING: Refrigeration system under high pressure. Do not puncture, heat, expose to flame or incinerate. Only certified refrigeration technicians should service this equipment. R32 systems operate at higher pressures than R22 equipment. Appropriate safe service and handling practices must be used. Only use gauge sets designed for use with R32. Do not use R22 gauge sets. Failure to do so can result in property damage, personal injury, or death.

WARNING: This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety. Children should be supervised to ensure that they do not play with the appliance.

WARNING: The maximum altitude for this appliance is 2,000m (6,562 ft). Do not use above an altitude of 2,000m (6,562 ft).

WARNING: Electric Shock Hazard. TURN OFF ELECTRIC POWER BEFORE SERVICE OR INSTALLATION.

Unit must be properly grounded. Other methods of grounding are permitted if performed in accordance with the "National Electric Code" (NEC)/"American National Standards Institute" (ANSI)\National Fire Protection Association (NFPA) 70 and Local/State Codes. In Canada, Electrical Grounding is to be in accordance with the Canadian Electrical Code CSA C22.1.

Unit must have correct Fuse or Circuit Breaker Protection. Unit's supply circuit must have the correct wire conductor size. All electrical connections and wiring must be installed by a qualified electrician and conform to the National Electrical Code and all Local Codes which have jurisdiction. Failure to do so can result in property damage, personal injury and/or death.

Your safety and the safety of others are very important. We have provided many important safety messages in this manual and on your appliance. Always read and obey all safety messages.

Safety Alert Symbol: ⚠️ This symbol alerts you to potential hazards that can kill or hurt you and others. All safety messages will follow the safety alert symbol with the word "WARNING" or "CAUTION".

WARNING: Indicates a hazard which, if not avoided, can result in severe personal injury or death and damage to product or other property.

CAUTION: Indicates a hazard which, if not avoided, can result in personal injury and damage to product or other property. All safety messages will tell you how to reduce the chance of injury, and tell you what will happen if the instructions are not followed.

NOTICE: Indicates property damage can occur if instructions are not followed.

⚠️ This symbol indicates that this appliance uses flammable refrigerant. If the refrigerant is leaked and exposed to an external ignition source, there is a risk of fire.

ℹ️ This symbol indicates that the Operation Manual should be read carefully.

ℹ️ This symbol indicates that a service personnel should be handling this equipment with reference Installation Manual.

ℹ️ This symbol indicates that information is available such as a operationing/Installation manual.

Multilingual Warning: WARNING/AVERTISSEMENT/ADVERTENCIA: Do not remove, disable or bypass this unit's safety devices. Doing so may cause fire, injuries or death. / Ne pas supprimer, désactiver ou contourner cette l'unité des dispositifs de sécurité. Faire vous risqueriez de provoquer, le feu, les blessures ou la mort. / No eliminar, desactivar o pasar por alto los dispositivos de seguridad de la unidad. Si lo hace podría producirse fuego, lesiones o muerte.

Important Safety and General Information

CAUTION: Risk of fire flammable materials

Important Note: Read this manual carefully before installing or operating your new air conditioning unit. Make sure to save this manual for future reference.

Do not use means to accelerate the defrosting process or to clean, other than those recommended by the manufacturer.

The appliance shall be stored in a room without continuously operating ignition sources like open flames, operating gas appliance or an operating electric heater.

Do not pierce or burn.

Be aware that refrigerants may not contain an odour.

Importance of Quality Installation

Optimal system performance and longevity depend upon a quality and proper installation. Failure to properly install this unit could result in undesirable operation and subsequent faults and potential failures.

Carefully follow all guidelines listed in the manual and industry best practices. Conform to all local code requirements. Contact your local technical representative with any questions or concerns.

Upon receiving the unit, inspect it for any damage from shipment. Claims for damage, either shipping or concealed, should be filed immediately with the shipping company. IMPORTANT: Check the unit model number, Cooling size, electrical characteristics, and accessories to determine if they are correct.

WARNING: If the unit appears damaged, or if a refrigerant leak is suspected, do not install. Contact a licensed repair person to perform a leak check on the unit.

Scan QR code to be linked to the Friedrich professional support page where you can locate the Service Manual. ℹ️

Unventilated areas

WARNING: APPLIANCE shall be stored in a room without continuously operating open flames (for example an operating gas appliance) or other POTENTIAL IGNITION SOURCES (for example an operating electric heater, hot surfaces).

WARNING: "Auxiliary devices which may be a POTENTIAL IGNITION SOURCE shall not be installed in the duct work. Examples of such POTENTIAL IGNITION SOURCES are hot surfaces with a temperature exceeding 700 F and electric switching devices".

WARNING: Do not use or install unapproved devices in the ductwork. Only use auxiliary devices approved by Friedrich or declared suitable with R-32. If in doubt, Friedrich should be consulted.

WARNING: Do not drill on panels. Before any progress, Friedrich should be consulted.

WARNING: The appliance shall be stored so as to prevent mechanical damage from occurring.

Important Safety and General Information

Qualification of Workers

WARNING: Any person who is involved with working on or breaking into a refrigerant circuit should be documented by a current valid certificate from a national training organization or manufacturers that are accredited to teach the relevant national competency standards that may be set in legislation to handle refrigerants safely in accordance with an industry recognized assessment specification.

Every working procedure that affects safety shall only be carried out by a competent person.

Examples for such working procedures are:

Cabling

WARNING: Check that cabling will not be subject to wear, corrosion, excessive pressure, vibration, sharp edges or any other adverse environmental effects. The check shall also take into account the effects of aging or continual vibration from sources such as compressors or fans.

Detection of Flammable Refrigerant

WARNING: Under no circumstances shall potential sources of ignition be used in the searching for or detection of refrigerant leaks. A halide torch (or any other detector using a naked flame) shall not be used.

The following leak detection methods are deemed acceptable for all refrigerant systems. Electronic leak detectors may be used to detect refrigerant leaks but, in the case of FLAMMABLE REFRIGERANTS, the sensitivity may not be adequate or may need re-calibration. (Detection equipment shall be calibrated in a refrigerant-free area.) Ensure that the detector is not a potential source of ignition and is suitable for the refrigerant used. Leak detection equipment shall be set at a percentage of the LFL of the refrigerant and shall be calibrated to the refrigerant employed, and the appropriate percentage of gas (25% maximum) is confirmed.

Leak detection fluids are also suitable for use with most refrigerants but the use of detergents containing chlorine shall be avoided as the chlorine may react with the refrigerant and corrode the copper pipe-work.

Examples of leak detection fluids are:

If a leak is suspected, all naked flames shall be removed/extinguished.

If a leakage of refrigerant is found which requires brazing, all of the refrigerant shall be recovered from the system, or isolated (by means of shut off valves) in a part of the system remote from the leak. Removal of refrigerant shall be according to national training organization or manufacturers.

Charging Procedures

The following requirements shall be followed:

Prior to recharging the system, it shall be pressure-tested with the appropriate purging gas. The system shall be leak-tested on completion of charging but prior to commissioning. A follow up leak test shall be carried out prior to leaving the site.

Important Safety and General Information

Recovery

WARNING: When removing refrigerant from a system, either for servicing or decommissioning, it is recommended good practice that all refrigerants are removed safely. When transferring refrigerant into cylinders, ensure that only appropriate refrigerant recovery cylinders are employed. Ensure that the correct number of cylinders for holding the total system charge is available. All cylinders to be used are designated for the recovered refrigerant and labelled for that refrigerant (i.e. special cylinders for the recovery of refrigerant). Cylinders shall be complete with pressure-relief valve and associated shut-off valves in good working order. Empty recovery cylinders are evacuated and, if possible, cooled before recovery occurs.

The recovery equipment shall be in good working order with a set of instructions concerning the equipment that is at hand and shall be suitable for the recovery of all appropriate refrigerants including, when applicable, FLAMMABLE REFRIGERANTS. In addition, a set of calibrated weighing scales shall be available and in good working order. Hoses shall be complete with leak-free disconnect couplings and in good condition. Before using the recovery machine, check that it is in satisfactory working order, has been properly maintained and that any associated electrical components are sealed to prevent ignition in the event of a refrigerant release. Consult manufacturer if in doubt.

The recovered refrigerant shall be returned to the refrigerant supplier in the correct recovery cylinder, and the relevant waste transfer note arranged. Do not mix refrigerants in recovery units and especially not in cylinders.

If compressors or compressor oils are to be removed, ensure that they have been evacuated to an acceptable level to make certain that FLAMMABLE REFRIGERANT does not remain within the lubricant. The evacuation process shall be carried out prior to returning the compressor to the suppliers. Only electric heating to the compressor body shall be employed to accelerate this process. When oil is drained from a system, it shall be carried out safely.

The recovery equipment shall be in good working order with a set of instructions concerning the equipment that is at hand and shall be suitable for the recovery of the flammable refrigerant. If in doubt, the manufacturer should be consulted. In addition, a set of calibrated weighing scales shall be available and in good working order. Hoses shall be complete with leak-free disconnect couplings and in good condition.

The recovered refrigerant shall be processed according to local legislation in the correct recovery cylinder, and the relevant waste transfer note arranged. Do not mix refrigerants in recovery units and especially not in cylinders.

If compressors or compressor oils are to be removed, ensure that they have been evacuated to an acceptable level to make certain that flammable refrigerant does not remain within the lubricant. The compressor body shall not be heated by an open flame or other ignition sources to accelerate this process. When oil is drained from a system, it shall be carried out safely.

General work area

Warning: All maintenance staff and others working in the local area shall be instructed on the nature of work being carried out. Work in confined spaces shall be avoided.

Presence of fire extinguisher

Warning: If any hot work is to be conducted on the refrigerating equipment or any associated parts, appropriate fire extinguishing equipment shall be available to hand. Have a dry powder or CO2 fire extinguisher adjacent to the charging area.

Checks to the refrigerating equipment

Warning: Where electrical components are being changed, they shall be fit for the purpose and to the correct specification. At all times Friedrich AC maintenance and service guidelines shall be followed If in doubt, consult Friedrich AC technical department for assistance.

The following checks shall be applied to installations using FLAMMABLE REFRIGERANTS:

Important Safety and General Information

Checks to electrical devices

Warning: Repair and maintenance to electrical components shall include initial safety checks and component inspection procedures. If a fault exists that could compromise safety, then no electrical supply shall be connected to the circuit until it is satisfactorily dealt with. If the fault cannot be corrected immediately but it is necessary to continue operation, an adequate temporary solution shall be used. This shall be reported to the owner of the equipment so all parties are advised.

Initial safety checks shall include:

Repairs to sealed components

Warning: Do not repair. Sealed components must be replaced.

Repair to intrinsically safe components

Warning: Do not repair. Intrinsically safe components must be replaced.

Decommissioning

Warning: Before carrying out this procedure, it is essential that the technician is completely familiar with the equipment and all its detail. It is recommended good practice that all refrigerants are recovered safely. Prior to the task being carried out, an oil and refrigerant sample shall be taken in case analysis is required prior to re-use of recovered refrigerant. It is essential that electrical power is available before the task is commenced.

  1. Become familiar with the equipment and its operation.
  2. Isolate system electrically.
  3. Before attempting the procedure, ensure that:
    • Mechanical handling equipment is available, if required, for handling refrigerant cylinders;
    • All personal protective equipment is available and being used correctly;
    • The recovery process is supervised at all times by a competent person;
    • Recovery equipment and cylinders conform to the appropriate standards.
  4. Pump down refrigerant system, if possible.
  5. If a vacuum is not possible, make a manifold so that refrigerant can be removed from various parts of the system.
  6. Make sure that cylinder is situated on the scales before recovery takes place.
  7. Start the recovery machine and operate in accordance with instructions.
  8. Do not overfill cylinders (no more than 80% volume liquid charge).
  9. Do not exceed the maximum working pressure of the cylinder, even temporarily.
  10. When the cylinders have been filled correctly and the process completed, make sure that the cylinders and the equipment are removed from site promptly and all isolation valves on the equipment are closed off.
  11. Recovered refrigerant shall not be charged into another REFRIGERATING SYSTEM unless it has been cleaned and checked.

Labelling

Warning: Equipment shall be labelled stating that it has been de-commissioned and emptied of refrigerant. The label shall be dated and signed. For appliances containing FLAMMABLE REFRIGERANTS, ensure that there are labels on the equipment stating the equipment contains FLAMMABLE REFRIGERANT.

General Specifications

Nomenclature

V R P 3 6 K 0 0 S S C S -A00
Series
VRP Heat Pump
Nominal Capacity (Btu/Hr.)
36 = 21,400 - 38,400
Voltage
K = 230/208 V
Heater watts
00 = 0.0 kW
10 = 10.0 kW
15 = 15.0 KW
Marketing Revision Engineering Revision
S - Standard
L = Low Ambient Heat
Plenum and louver configuration
C= Only for VRP36 units
Outdoor Air/ Ventilation** S= Standard unit. No FreshAire™
F= Single OA Fan Powered FreshAire System 80 CFM
D= Dual OA Fans Powered FreshAire System 130 CFM
S= Standard
R = Reheat

Cooling Performance Data (Cooling Standards: 95°F DB/75°F WB outdoor, 80°F DB/67°F WB indoor)

Model VRP36K
Voltage 230/208
Cooling Btu (Rated) 35,600
Cooling Btu (Min. - Max)* 21,400 - 38,400
Outdoor Operating Range (°F) 55 - 115
Power (W) 3,390
SEER2 17.0
EER2 10.5
Sensible Heat Ratio 0.72
Cooling Amps 14.8

Heat Pump Performance Data

Model VRP36K
Voltage 230/208
Heating Btu (Rated @ 47° F) 33,000
Heating Btu (@ 17° F) 20,800
Heating Btu (Min. - Max.) 19,000 - 33,000
Heat Pump Outdoor Operating Range (°F)* 0 - 70
HSPF2 7.8
Heating Power (W) 2,930
Heating Amps 12.8

Due to continuing research in new energy-saving technology, specifications are subject to change without notice. Units must be appropriately sized based on accurate building load and the rated capacity of the equipment.

Dimensions

A diagram illustrates the unit's dimensions and key measurement points. It shows a front and side view with labels for:

Model VRP36K
Dimensions (W x D x H) 31 3/4" x 29 7/8" x 77 1/4"
Shipping Dimensions (W x D x H) 34" x 35" x 81"
Net Weight (lbs.) 342
Shipping Weight (lbs.) 369
R32 Charge (oz.) 60

Electrical Data

A table details the electrical specifications for different VRP models:

VRP Model Voltage Electric Heater Watts Electric Heating Btu Electric Heater Amps MCA MOP / MOCP
VRP36K00 230 0 0 0 22.0 30
208 0 0 0
VRP36K10 230 8820 30095 39.4 49.9 50
208 7210 24602 35.9
VRP36K15 230 8820/4410 45143 39.4/19.2 49.9/24.0 50 / 25
208 7210/3610 36919 35.9/17.4

Key: MCA = Minimum Circuit Ampacity, MOP/MOCP = Maximum Over-current Protection / Breaker Size.

Minimum Circuit Amps (MCA) and MOCP values are calculated in accordance with The NEC Article 440.

NOTE: 15 kW electric heat models require dual service (50A + 25A).

Note to Specifying Engineers:

Please ensure that your electric heat kit selection is sufficient for your area/application and takes into account the utilization voltage. Please refer to the electrical data section above for electric heat capacities versus utilization voltage. Friedrich recommends ASHRAE 99.6 when sizing electrical heaters. VRP does not have simultaneous heat pump/heater kit operation. During single digit temperatures, heat pump operation will likely not satisfy the heating demand unless the specifying engineer has designed the BTU output for heat. At times when the load is within 5% of the calculated output, it is recommended that the heater kit be upsized.

Electrical Requirements

Wire Size Fuse/Circuit Breaker Grounding Wire Sizing
Use ONLY wire size recommended for single outlet branch circuit. Use ONLY type and size fuse or HACR circuit breaker indicated on unit's rating guide. Proper over current protection to the units is the responsibility of the owner. Unit MUST be grounded from branch circuit to unit, or through separate ground wire provided on permanently connected units. Ensure that branch circuit or general purpose outlet is grounded. Use recommended wire size given in tables and install a single branch circuit. All wiring must comply with local and national codes. NOTE: Use copper conductors only.

Electrical Rating Table

NOTE: Use copper conductors ONLY. Wire sizes are per NEC.

Recommended Branch Circuit Sizes* AWG Wiring Size**
Nameplate Maximum Circuit Breaker Size
25A 10
30A 10
50A 6
60A 6

AWG - American Wire Gauge

* Single circuit from main box.

** Based on 100' or less of copper, single insulated conductor at 60° C

NOTE: All field wiring must comply with NEC and local codes. It is the installer's responsibility to ensure that the electrical codes are met.

Air Flow Data

Indoor CFM & External Static Pressure

Air Flow Data is presented in a table showing CFM values for different speed settings and static pressures (in. WC):

Model Speed Select Airflow Setting Static Pressure (in. WC)
0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50
VRP36* 1 High 1140 1100 1060 1000 950 890 820 750 670
Low 1040 980 920 850 780 710 630
2 High 1190 1150 1110 1070 1020 960 900 830 760 680
Low 1040 980 920 850 780 710 630
3 High 1300 1260 1220 1180 1130 1080 1020 960 900 830 760
Low 1040 980 920 850 780 710 630
4 High 1400 1360 1320 1270 1220 1170 1120 1060 1010 950 890
Low 1040 980 920 850 780 710 630
5 High 1470 1440 1400 1360 1310 1270 1220 1170 1120 1060 1000
Low 1040 980 920 850 780 710 630

* Rated to 0.5" ESP High and includes factory provided filter.

VRP Configurator

All units are shipped with Speed Select 1 High as the default airflow. In higher static applications, it is necessary to increase the airflow to a higher Speed Select setting. Using the VRP Configurator tool and associated instructions, the speed settings can be changed on units with a firmware 3.7.0.0 or later.

Condenser CFM & External Static Pressure

VRP is designed to install through an exterior wall with a plenum (VRPXWP*-8, VRPXWP*-14) and a Friedrich external louver.

VRP Model Design CFM ESP ("WC) Maximum ESP ("WC)
VRP36K 2030 0.03 0.20

If the Friedrich designed plenum and louver combinations are not used, the selections and design must be evaluated by Friedrich to ensure the total pressure drop does not exceed the maximum allowable limits.

VRP® Required Minimum Clearances

Building Exterior Unit Opening Requirements

VRP units must be installed on an outside wall. Confined spaces and/or covered areas should be avoided. Units must be installed no closer than 12" apart when two units are side by side. If three or more units are to operate next to one another, maintain a minimum of 60" between units or pairs of units (Figure B). If more than two units are sharing a floor with adjacent, outset units, a minimum distance of 64" must be kept between units (Figure C). Also, a vertical clearance of 60" must be maintained (Figure A) between units. Units installed on the bottom floor must be mounted at least 6" off of the ground. If two units are facing each other, a minimum distance of 108" must be kept between units (Figure D).

Diagrams illustrate clearance requirements:

Grill Clearance Requirements

Where obstructions are present use the following guidelines for proper spacing from the VRP exterior louvered grill. Friedrich recommends that ALL obstructions are a minimum of 72" from the exhaust.

A diagram illustrates these clearance requirements around the unit and obstructions.

Installation Orientation

A diagram shows the unit installed through an exterior wall, indicating minimum clearances required inside and outside the wall. It specifies:

NOTE: The VRP 3-ton unit comes equipped with bi-directional casters for ease of movement. The casters only allow for movement forward and backward. The VRP 3-ton should be installed with the access door positioned in front of the unit.

Exterior Wall Opening Dimensions

A table and diagram provide rough opening dimensions for exterior walls:

Exterior Wall Rough Opening Dimensions Width Height
Unit
VRPXWPC-* 32 1/4" 52 1/2"

NOTE: The distance between the rough opening and the finished floor/platform must be 2 7/8".

A diagram shows an isometric view of the wall opening with these dimensions.

Interior (Closet) Wall Opening Dimensions

Return Air Access Door Wall Cut-Out

A table and diagram provide rough opening dimensions for interior walls:

Interior Wall Rough Opening Dimensions Width Height
Unit
VRP36 36" 84"

NOTE: Dimensions based on standard 36" door frame.

A diagram shows an isometric view of the interior wall opening with these dimensions.

Wall Plenum Installation

Parts included in Plenum kit:

Diagrams illustrate these parts.

Field Supplied Parts:

Sealant, attachment screws, and flashing are field supplied. Silicone sealant is recommended.

Diagrams show Sealant, Flashing, Shim, and Screws.

Step 1 - Outside Wall Plenum Half

Note: The wall plenum is not designed to carry any structural load. A load bearing header must be built above the rough opening.

  1. Prepare the rough opening. The rough opening should be lined with metal or wood. The plenum will warp if sealed against concrete or brick.
  2. Dry fit the outside plenum half into the rough opening and check the fit and level.
  3. Remove the outside plenum half, flash the rough opening to ensure proper fit and level.
  4. Pre-installing the exterior louver as shown above is optional (See Page 17).
  5. Apply sealant to the outside plenum half and insert into the rough opening to ensure a water-tight seal. Ensure that the outside plenum half is securely attached to the framed opening.

A diagram illustrates this step, showing proper header, flashing, and sealant application.

Step 2 - Inside Wall Plenum Half

  1. Apply sealant to all 4 flange corners and unused holes. See Detail A.
  2. Flash the inside of the rough opening to ensure the proper fit and level.
  3. Insert inside plenum half (Part B) into Outside Plenum Half (Part A). Ensure that Part A does not back out of the rough opening.
  4. Remove the inside plenum half.
  5. Apply sealant to the inside plenum half and insert into the rough opening to ensure a water-tight seal.

A diagram illustrates this step, with Detail A showing sealant application.

Step 3 - Inside Wall Plenum (cont.)

Note: Do not place any screws, fasteners, or penetrating holes through the top or bottom of the plenum assembly.

  1. Drill pilot holes on the interior of the inside plenum half (Part B) as shown in Detail A. Pilot holes should be located approximately 4" from the top and bottom of the inside plenum half, on both the left and right sides.
  2. Install fasteners through each pilot hole. Fastener must pass through both Part A and Part B. If the inside and outside plenum halves do not overlap at fastening point, be certain to drill extra holes where needed to secure both Part A and Part B to the rough opening.

A diagram illustrates this step, with Detail A showing pilot hole locations.

Louver Installation

Installation of the louver PRIOR to Wall Plenum Installation

Hold the louver up to the Outside Wall Plenum Part A and line up the louver top with the very top edge of the 3/4" flange. Line up the Wall Plenum holes with the threaded holes in the louver, install and tighten the 8 screws.

A diagram shows the louver being attached to the wall plenum with 8 screws provided. It notes "Louvers & Drip Ledge orientation is down" and shows an "Optional Pre-assembled Outside Element (Grill and Plenum)".

Installation of the louver AFTER the installation of wall plenum on elevated floors

From the interior of the utility closet:

  1. Tie a rope or tether to the architectural louver and the divider in the wall plenum to prevent it from falling if dropped.
  2. Turn the louver sideways and push the louver out below the divider in the wall plenum.
  3. Pull the louver back against the wall plenum and align the holes.
  4. Insert and tighten all eight provided fasteners. When the louver is secured, remove the safety tether.

Final Wall Plenum and Architectural Louver Installation

Diagrams show the "Plenum Divider Extension Plate (Baffle)" and the "Plenum Divider Extension Plate Installed into Full Plenum Assembly".

Ensure that the weather strip is undamaged and provides a continuous seal around the inner perimeter of the plenum. Apply silicone grease or other non-petroleum-based lubricants to the weather strip to enhance the sealing capability of the weather strip and ease installation of the air conditioner chassis.

  1. Install the plenum adjuster plate. Ensure the exterior edge is seated against the inside of the architectural louver.
  2. Secure the plenum divider extension plate to the architectural louver using the two provided screws.
  3. Use tape and sealant to seal any gaps.

Unit Installation

Unit Placement Prior to Installation (Front-Install Configuration)

A diagram shows the VRP unit being placed in front of the installed wall opening (louver and plenum). All louver, plenum, rough plumbing, and rough wiring steps must be complete prior to final installation of the air conditioning chassis.

Final Unit Installation Overview

Unit Final Placement - Front Install

A diagram shows the unit fully installed in the opening, with the front panel removed.

  1. Ensure that power is off at the junction box feeding power to the air conditioner until all process steps are completed.
  2. Move the unit from the shipping base and onto the installation site.
  3. Insert the unit's rear extension into the wall plenum, it should butt up against the compression gasket.
  4. Remove the front panel to access the chassis clamps. Attach the hooks into the plenum braces and close.
  5. Reattach the front panel.
  6. Identify the appropriate drain port to use and complete plumbing (See Page 22).
  7. Attach the ductwork to the unit at the supply-air outlet and ensure the seal is air tight (See Page 23).
  8. Wire and connect the wall controller (See Pages 24-27).
  9. Connect the main power (See Page 25).

Unit Final Placement - Plenum Attachment

A diagram shows the unit being attached to the wall plenum. Detail A shows a close-up of the panel mounted fasteners.

  1. Ensure that power is off at the junction box feeding power to the air conditioner until all process steps are completed.
  2. Ensure that the unit is pushed flush against the start of the wall plenum.
  3. Remove the front panel from the unit.
  4. Reach under and behind the electrical box and locate the panel mounted fasteners (Detail A). There is one on each of the left and right interior panel.
  5. Align the hook of each fastener with the brackets mounted on the interior portion on the wall plenum.
  6. Pull back on the fastener handles until locked.

NOTE: Once the unit is fastened there should be a gap of at least 1" between the unit and finished wall.

Final Drain Installation

Unit Drain Installation

NOTE: Failure to follow the following procedures may result in serious property damage. A field supplied secondary condensate pan may be required. Check with local codes. In case of drainage system blockage, the unit base will allow excess water to flow out of the unit through the plenum and the architectural louver. It is critical to ensure that the drainage path is not blocked or obstructed in any way during installation.

  1. The supplied drain kit must be connected to one of the two (left or right) 3/4" FPT connections on the unit base-pan.
  2. Insert the provided 3/4” nipple into the determined connection using field-supplied Teflon tape or pipe joint compound.
  3. With the slip end of a 3/4" union, connect to the nipple with Teflon tape or pipe joint compound.
  4. Hand-tighten all fittings to prevent damage to unit or fittings.
  5. Install a field-supplied drain system to the slip end of the union. A trap is required and drain connections should be connected to building DWV system. Pitch the drain line of a 1/4” downward slope for every foot (1') of lateral horizontal run to the DWV.
  6. Plug the unused connection port with the provided 3/4" pipe plug and field-supplied Teflon tape or pipe joint compound. High tighten to prevent damage to the unit or fittings. Do not thread metal or copper pipe fittings directly into unit.
  7. Check the system for leaks.

A diagram illustrates the drain connection points and components.

Ductwork Installation & Base Pan Heat Option

A diagram shows the supply air duct connection area with dimensions (8 1/16"D x 26 1/16"W).

Supply air duct connection is the responsibility of the installer and should be installed per industry best practices.

Sheet metal or duct board may be used for the transition from the discharge to 10" or larger diameter flexible ducting.

Avoid sharp transitions in the ductwork to ensure optimal indoor blower performance.

Allow at least 18" from the discharge of the unit to the final reduced-size transition to support optimal efficiency of the blower system.

Basepan Heat Thermostat

VRP model numbers that end with the 'L' character will come equipped with a basepan heater. The basepan heat engages and disengages automatically based on outdoor ambient and base-pan temperatures.

Wall Controller Installation

Please check the Instructions Manual for VRPX*4 Controller for detailed installation. All units are equipped with a RJ-45 connection in front to be able to connect to wired or wireless wall controller.

NOTE: VRP R32 units are only compatible with Friedrich VRPX*4 controllers.

Diagrams show an RJ-45 receptacle on the VRP unit and an RJ-45 plug and receptacle.

Electrical Installation

Diagrams illustrate the electrical installation process:

Note: The 0kW and 10kW models will require the use of only one of the terminal blocks (Block 'A'). The 15kW models will connect the extra 5kW electric heat to the remaining terminal block (Block 'B') and separate 30A service.

Return Air & Door Installation

An image shows a louvered door.

  1. A 36" door louvered door is recommended for all VRP36 installations.
  2. The louvered portion of the door should have a minimum of 325 sq. in. of free area.
  3. Alternatively, a solid door may be used in tandem with a transfer register on an adjacent wall to the closet. The transfer register should have a minimum free area of 325 sq. in.

FreshAire™ System Set-Up and Operation

If equipped with the FreshAire™ System, the unit will come with a FreshAire filter and blank-off plate.

Diagrams show the unit with an arrow pointing to the filter area (Detail A) and the FreshAire™ ON/OFF switch.

Remove the blank-off plate prior to turning the unit on. To remove the blank off plate, pull the attached tab shown in Detail A. The blank-off plate can be discarded or retained for future use.

To engage the FreshAire™ System, flip the switch into the ON position. The fresh air switch is located behind the return air filter.

Final Installation Checklist

NOTE: Maintaining a log for recording the dates of maintenance and/or service is recommended, and should be suggested to the owner or operator of the equipment.

Present the owner or operator of the equipment with the Installation & Operation Manual, all accessory installation instructions, and the name, address and telephone number of the Authorized Friedrich Warranty Service Company in the area for future reference if necessary.

Chassis Operation

Cooling Operation

The set point must be at least 3°F below room temperature to ensure compressor operation. In the cooling mode, when demand is present, the indoor blower and outdoor fan will operate. The compressor will vary operating speed to maintain desired set point.

Heat Pump Operation

The set point must be greater than 0.3°F but not greater than 6°F above room temperature to ensure compressor operation. In the heating mode, when demand is present, the indoor blower and outdoor fan will operate. The compressor will vary operating speed to maintain desired set point.

Electric Heat Operation

If the set-point is greater than 5°F - 15°F (depending on outdoor conditions) above room temperature, the heat pump operation will be terminated and the electric heater will be energized to satisfy the heating demand. If heat pump operation is not available due to defrost or error, the electric heater will be used to satisfy heating demand. In 10kW and 15kW models, 5kW of electric heat will be allowed to run concurrently with the compressor.

FreshAire™

The FreshAire™ System (optional) delivers outside air to the indoor space. The system has a fan that draws outdoor air into the system. The outdoor air leaves the system through a filter and enters the indoor space in front of the indoor conditioning coil. The outdoor air mixes with the return air and is drawn through the indoor conditioning coil. The optional system can be configured to have either a single (F option) outdoor air fan and filter, or dual (D option) outdoor air fans and filters.

The FreshAire™ System uses two (2) 6 x 6 x 1 filters. The filters are accessed through the front of the unit just below the main unit filter. Slide the filter straight out to remove and straight in to replace.

Service & Warranty

Servicing / Chassis Quick Change Outs

The chassis is designed for quick disconnect and change out. For minor electrical service, the Electrical Access Panel is easily removable once the screws are removed. For major electrical, refrigeration and fan service the chassis may be removed from utility closet.

WARNING: Electrical Shock Hazard. Pull out electrical disconnect on front of the chassis and turn off all power to unit before servicing. Failure to do so can result in property damage, personal injury and/or death.

Routine Maintenance Performing Routine Maintenance

With proper maintenance and care, your system will operate economically and dependably. Maintenance can be accomplished easily by referring to the following directions. However, before performing any maintenance, see above stated WARNING.

CAUTION: Cut/Sever Hazard. Some edges may be sharp, use gloves or other hand protection when handling unit. Failure to do so can result in minor to moderate personal injury.

Replace Air Filter

A dirty air filter reduces the efficiency of your VRP unit and allows lint and dirt to accumulate on the indoor-air coil. Lint and dirt on the indoor- air coil can damage your unit.

The air filter should be replaced as it becomes dirty. To replace the chassis mounted return air filter:

  1. Slide the holders away from the filter.
  2. Remove the filter.
  3. Install a new disposable filter.
  4. The unit filter size is 20" x 30" x 1"

NOTE: DO NOT OPERATE YOUR SYSTEM WITHOUT A FILTER IN PLACE OR BLOCK THE FRONT OF THE UNIT RETURN AIR OPENING.

To Remove the Chassis from the Closet:

  1. Switch the wall controller off.
  2. Disconnect the power coming into the unit from the main breaker panel or the closet mounted disconnect.
  3. Disconnect the electrical connection.
  4. Disconnect the duct work.
  5. Slide the chassis out of the wall plenum.
  6. Roll the chassis out of the utility closet.

Inspect and Clean Indoor Air Coil

Eventually, minor amounts of lint and dirt may pass through the filter and collect on the indoor-air coil. These minor accumulations can be carefully vacuumed away with a brush attachment on a vacuum cleaner. Care must be taken to avoid bending the aluminum fins on the coil. Bent fins should be straightened using a special fin tool available from most HVAC supply depots.

Inspect Outdoor Air (OA) Intake and Exhaust

The unit's outdoor-air intake and outdoor-air exhaust paths must remain clear. Keep it free of all debris, snow, or ice. The OA intake should also be kept free of obstructions. Blocking the OA exhaust or OA intake opening will reduce the efficiency of your unit and could damage it.

Inspect and Clean Condensate Drain

The condensate drain must be routed to a suitable drainage area. Check the unit condensate drain periodically. Keep it free of anything that may block or impede the flow of condensate water. If there is any accumulation of foreign matter in the drain pipe, it should be removed and cleaned. The entire drain line must be protected from freezing.

Warranty

All warranty service work must be done by an authorized servicer. See Product Warranty, and consult your dealer or contractor for details.

Electronic Control Error Code Diagnostics and Test Mode

Error Code Diagnostics

The VRP electronic control continuously monitors the unit operation and will store error codes if certain conditions are witnessed. In some cases the unit may take action and shut the unit off until conditions are corrected.

To enter the error code menu, do a long press (3 seconds) of the Fan Mode and Fan Speed keys. When the menu opens an E will be displayed on the screen. Navigate through the diagnostics with the Up and Down keys. The displayed number denotes the number of the active diagnostic test. To exit, press the Enter key.

Accessories

ITEM DESCRIPTION CHECK LIST
VRPXWPC-8 Wall Plenum for VRP36 with VRPXALC for 4" to 8" thick wall Require One of these Wall Plenums per unit
VRPXWPC-14 Wall Plenum for VRP36 with VRPXALC for 8" to 14" thick wall
VRPXALC Architectural louver (VRP36 only) (30° Blade angle) Require One of these Louvers per unit
VRPXSCC Architectural louver (VRP36 only) Custom Color - Special Order (30° Blade angle)
VRPXAP1 Return Air Access Panel Require One per unit
TYPE ITEM DESCRIPTION CHECK LIST
WALL CONTROLLER VRPXWCT4 Wall Controller without occupancy detection. Require One of the Controllers per unit
VRPXEMRTA/B4 VRP Energy Management Wired Wall Controller with Occupancy Sensor
VRPXEMWRTA/B4 VRP Energy Management Wireless Wall Controller with Occupancy Sensor
EMOCT4 Online Connection Kit – Optional with VRPXEMRT2/VRPXEMWRT2 Optional
EMRAF4 Remote Access Fee – Optional with VRPXEMRT2/VRPXEMWRT2 Optional
Models: VRP36K VRP Single Package HVAC, VRP36K, VRP Single Package HVAC, Single Package HVAC, Package HVAC

File Info : application/pdf, 36 Pages, 4.96MB

PDF preview unavailable. Download the PDF instead.

2025 VRP36 May v1

References

Adobe PDF Library 17.0 Adobe InDesign 20.5 (Windows)

Related Documents

Preview Friedrich VRP Variable Refrigerant Packaged Heat Pump Installation & Operation Manual
This manual provides comprehensive installation and operation guidelines for the Friedrich VRP Variable Refrigerant Packaged Heat Pump, model VRP36K. It covers safety precautions, general specifications, installation procedures, electrical data, air flow data, clearances, and warranty information.
Preview Friedrich VRP07K/R Variable Refrigerant Packaged Heat Pump Installation and Operation Manual
Comprehensive guide for the installation and operation of the Friedrich VRP07K/R Variable Refrigerant Packaged Heat Pump, covering safety warnings, general specifications, detailed installation procedures, and warranty information.
Preview Friedrich VRP: Variable Refrigerant Packaged Heat Pumps for Lodging & Multifamily
Explore the Friedrich VRP series, offering VRF performance with single-package simplicity. Discover advanced features like Precision Inverter technology, low-ambient heating, superior humidity control, and IAQ solutions for lodging and multifamily applications.
Preview Friedrich VRP Variable Refrigerant Packaged Heat Pump Product Profile
Discover the Friedrich VRP, an innovative and intelligent Variable Refrigerant Packaged Heat Pump system. It provides superior cooling, efficient heating, advanced humidity control, and optional fresh air integration, ensuring optimal comfort and energy savings with its Precision Inverter technology.
Preview Friedrich VRP Variable Refrigerant Packaged Heat Pump Technical Specifications and Submittal
Comprehensive technical specifications, unit features, dimensional data, and performance metrics for the Friedrich VRP series of Variable Refrigerant Packaged Heat Pumps, emphasizing Precision Inverter Technology and unitary package design.
Preview Friedrich Breeze Universal Heat Pump: Installation and Wiring Diagrams
Comprehensive guide to the Friedrich Breeze Universal Heat Pump, covering installation, wiring diagrams for various configurations, and operational parameters. Learn about its features, energy savings, and low-temperature performance.
Preview Friedrich Breeze Series Inverter Heat Pumps for Efficient Home Comfort
Discover the Friedrich Breeze Series inverter-driven universal ducted heat pumps, offering precise temperature control, significant energy savings, and quiet operation for year-round home comfort. Learn about Premier and Select models, universal compatibility, and advanced features.
Preview Friedrich Breeze Select 2025 R-454B Heat Pump Quick Start Guide
A quick start guide for Friedrich Breeze Select 2025 R-454B Universal Heat Pump models, covering installation, operation, and troubleshooting.