Phocos Any-Grid™ Series: Setup Guide for Hubble Lithium Batteries

This guide outlines the recommended settings and communication setup for operating Phocos Any-Grid™ PSW-H hybrid inverter chargers with Hubble lithium battery models: AM-2, AM-4, X-100, and X-101.

Introduction

This guide details the setup and communication procedures for Phocos Any-Grid™ PSW-H hybrid inverter chargers when used with Hubble AM-2, X-100, and X-101 battery units. The PSW-H-3KW-230/24V and PSW-H-3KW-120/24V models are compatible with Hubble AM-4 battery units. All connected batteries must be of the same model. Charge/discharge settings are automatically negotiated with the battery. Installation must follow the Any-Grid PSW-H “User and Installation Manual” and the Hubble installation manual. Installation should be performed by a trained professional.

WARNING: Read and respect all warnings in the installation manuals for the Any-Grid, battery units, and any other connected equipment.

Requirements

To proceed with this guide, the following are required:

WARNING: Ensure the correct battery to Any-Grid cable is used. Incorrect wiring or cable orientation can cause damage not covered by warranty.

System Overview

The system comprises optional PV Panels, AC Loads, Public Grid (optional), Generator (optional), Hubble battery unit(s), and the Phocos Any-Grid™ Hybrid Inverter Charger with a Removable Display.

Diagram Description: A schematic shows PV panels connected to the Any-Grid inverter. The inverter also connects to AC loads and can receive input from a Public Grid or Generator. Hubble battery units are shown connected to the Any-Grid inverter.

Battery Sizing

To maintain the full battery warranty, each battery unit should not exceed 100 Adc continuous charge/discharge current and 125 Adc peak for up to 100 ms. It is recommended to use at least 1.5 battery units in parallel for a single PSW-H-5KW, and at least 2 battery units for a PSW-H-6.5KW-120/48V. For PSW-H-3KW units, use at least 1.8 AM-4 battery units. Using fewer batteries may void the Hubble battery warranty and cause the battery to disconnect from the Any-Grid.

Multiple Any-Grids must be connected to a single battery array, with a maximum of 15 battery units.

Battery Communication Cable Installation and Powering On

CAUTION: Before connecting battery units to the Any-Grid(s), ensure the battery, AC input source, AC output loads, and PV input remain disconnected.

  1. Ensure all battery units are turned off.
  2. Set the address DIP switches on the battery units according to the battery manual.
  3. Ensure battery units are off. Connect the Any-Grid(s) to the battery power terminals with correct polarity.
  4. CAUTION: Incorrect polarity can damage the Any-Grid and battery, which is not covered by warranty.

  5. Plug the RJ-12 end of the battery communication cable into the Cloudlink device's "S" port and the RJ-45 side into the Any-Grid display panel's "RS-232" port.
  6. Diagram Description: An illustration shows the connection between the Any-Grid display panel and the Cloudlink device via an RS-232 port and a red marked connection for systems with multiple Any-Grids.

  7. Using the provided RJ45 cable, connect the CAN Bus cable to the “CAN” port of the Hubble battery and the other end to the “CAN” port of the Cloudlink device.
  8. Ensure battery units are wired correctly as per the Hubble battery manual. Turn on each battery unit using the power button. Verify that the “RUN” LED blinks green and the “ALM” LED is off.
  9. Diagram Description: An image shows the rear of a battery unit with the power button circled in red and the RUN LED circled in green.

  10. Turn the "ON/OFF” load power button of the Any-Grid(s) to the ON position. Ensure no loads are connected.
  11. Diagram Description: An image shows the front panel of the Any-Grid inverter with the ON/OFF load power button highlighted.

  12. The Any-Grid(s) should now be running with the display(s) on.
  13. Refer to the Cloudlink setup guide on the Hubble website (www.hubblelithium.co.za) for Cloudlink device setup procedures.
  14. Once Cloudlink setup is complete and no errors are present on the Any-Grid(s) or battery unit(s), turn on the load breaker, followed by the PV, and finally the AC source breaker (if present).

The commissioning of the battery unit(s) and Any-Grid(s) is now complete.

Models: PSW-H-5kW-230, Pure Sine Wave Hybrid 5000W 48VDC Inverter Charger, Hybrid 5000W 48VDC Inverter Charger, 48VDC Inverter Charger, Inverter Charger, PSW-H-5kW-230, Charger

File Info : application/pdf, 5 Pages, 290.03KB

PDF preview unavailable. Download the PDF instead.

Any-Grid PSW-H Battery-settings-for-Hubble-Batteries 2021-09-16

References

GPL Ghostscript 9.52

Related Documents

Preview Phocos Any-Grid™ Series: Shoto SDA10-48100 Battery Integration Guide
This guide provides recommended settings and communication procedures for integrating Phocos Any-Grid™ hybrid inverter chargers with Shoto SDA10-48100 lithium battery modules. It covers system overview, battery sizing, and step-by-step installation and configuration for optimal performance and warranty preservation.
Preview Phocos Any-Grid PSW-H Series: Arco Invincible III Battery Settings Guide
This guide provides recommended settings and installation instructions for connecting Phocos Any-Grid PSW-H hybrid inverter chargers with Arco Invincible III lithium battery modules. Learn about system overview, battery sizing, and communication cable setup.
Preview Phocos Any-Grid PSW-H-6.5kW-120/48V Quick Start Guide
A concise guide to installing and commissioning the Phocos Any-Grid PSW-H-6.5kW-120/48V hybrid solar inverter, including wiring, mounting, and UI overview.
Preview Phocos Any-Grid PSW-H Hybrid Inverter Battery Settings Guide for Leoch Lithium Batteries
This guide provides recommended settings and communication setup for Phocos Any-Grid PSW-H hybrid inverter chargers with Leoch LFeLi lithium battery modules. It details installation, wiring, and configuration steps for optimal performance and warranty compliance.
Preview Phocos Product Selection Guide: Solar Inverters, Storage, and Charge Controllers
Discover Phocos' comprehensive product portfolio, including Any-Grid™ hybrid inverter chargers, Any-Cell™ LFP energy storage systems, and MPPT/PWM solar charge controllers. This guide helps select the optimal solution for solar power conversion, production, and storage needs.
Preview Phocos Any-Grid PSW-H Series: Recommended Battery Settings Guide for Revov R100/B100
This guide provides recommended settings and communication setup for Phocos Any-Grid PSW-H hybrid inverter chargers with Revov R100/B100 lithium battery modules, ensuring optimal performance and warranty compliance.
Preview Phocos PSW Series Pure Sine Wave Inverters User Manual
Comprehensive user manual for Phocos PSW Series Pure Sine Wave Inverters, covering installation, operation, safety precautions, troubleshooting, and technical specifications. Available in multiple languages.
Preview Phocos Any-Bridge AB-PLC-CAN Monitoring and Control Gateway Installation and User Manual
Comprehensive user and installation manual for the Phocos Any-Bridge AB-PLC-CAN, detailing setup, operation, troubleshooting, and warranty for connecting Any-Grid PSW-H inverters to the PhocosLink Cloud.