HILTI SDT 9 Fastening System
Document ID: 2220669-2025.08.21
Components and Models
The HILTI SDT 9 fastening system includes various models and accessories:
- SDT 9-M: Main tool body.
- S-SY SDT: Accessory for the SDT 9 system.
- SDT 9-NP B: Another model or accessory.
- SDT 9-NP R: Another model or accessory.
- ST 2000-22 / ST 1800: Compatible power sources (likely cordless screwdrivers/drills).
Operational Guide
Step 1: Tool Handling
Hold the main tool body (SDT 9-M) with the handle. The diagram shows the correct grip and orientation for operation.
Step 2: Attaching S-SY SDT Accessory
Insert the S-SY SDT accessory into the designated port on the main tool body. Secure it by following the indicated steps (likely a push and lock mechanism).
Step 3: Connecting Power Source
Align the power source (e.g., ST 2000-22 or ST 1800) with the connection point on the SDT 9 tool. Insert and engage the locking mechanism, indicated by numbered steps 1, 2, 3.
Step 4a: Configuration Detail
Illustrates a specific attachment or adjustment, showing components labeled 1, 2, 3, and 4.
Step 4b: Alternative Configuration
Depicts an alternative setup or accessory connection, with components labeled 1 and 2.
Step 4c: Further Configuration
Shows another configuration detail, with components labeled 1 and 2.
Step 5: Connection Point
A close-up view of a connection point, showing components labeled 1 and 2, indicating proper engagement.
Step 6: Engagement Confirmation
Perform the action until a "click!" ? is heard, confirming secure engagement of components.
Step 7: Component Insertion
Insert component labeled 1 into the tool, followed by component labeled 2, as indicated.
Step 8: Double Engagement Confirmation
Perform the action until two "clicks!" ?? are heard, confirming secure engagement.
Fastener Installation
Step 9a: Fastener Insertion (Type 1)
The tool is shown driving a fastener into a material. The diagram illustrates the process with numbered steps and a checkmark ✔️ indicating successful insertion.
Step 9b: Fastener Insertion (Type 2)
Another fastener insertion scenario is depicted, showing a different material or fastener type, with a checkmark ✔️.
Step 9c: Fastener Insertion (Type 3)
Depicts fastener insertion into a material, with a checkmark ✔️.
Step 9d: Fastener Insertion (Type 4)
Illustrates fastener insertion, with a checkmark ✔️.
Step 10: Tool Adjustment/Setting
A sequence of actions is shown, involving adjustments or settings for the tool, indicated by numbered steps 1 through 6, and a "click!" ? confirmation.
Step 11: Final Operation Check
The diagram shows a final check of the tool's operation, possibly involving a fastener and a checkmark ✔️.
Step 12: Driving Fastener with Tool
The HILTI SDT 9 tool, powered by a compatible driver (ST 2000-22 / ST 1800), is shown driving a fastener into a surface. The process is broken down into steps 1, 2, 3, 4, 5, 6, with a "click!" ? confirmation.
Step 13: Tool Operation Sequence
A detailed sequence of operations is presented, involving multiple steps (1, 2, 3) and a "click!" ? confirmation, possibly for a specific function or maintenance task.