Altronix/Lenel-S2 (S2 Security Platform) Kits
Installation Guide
Models Include
T3SSK75F28: 28 Door Kit with Fused Outputs
Fully assembled kit includes:
- Trove3 enclosure with TSS3 Altronix/Lenel-S2 (S2 Security Platform) backplane
- One (1) eFlow104NB - Power Supply/Charger
- One (1) eFlow102NB - Power Supply/Charger
- Three (3) ACM8 - Fused Access Power Controllers
- One (1) ACM4 - Fused Access Power Controller
- Two (2) PD16W - Fused Power Distribution Module
- One (1) RSB2* - Rocker Switch Bracket with Two (2) Rocker Switches (Not evaluated by UL)
T3SSK75F28D: 28 Door Kit with PTC Outputs
Fully assembled kit includes:
- Trove3 enclosure with TSS3 Altronix/Lenel-S2 (S2 Security Platform) backplane
- One (1) eFlow104NB - Power Supply/Charger
- One (1) eFlow102NB - Power Supply/Charger
- Three (3) ACM8CB - PTC Access Power Controllers
- One (1) ACM4CB - PTC Access Power Controller
- Two (2) PD16WCB - PTC Power Distribution Module
- One (1) RSB2* - Rocker Switch Bracket with Two (2) Rocker Switches (Not evaluated by UL)
All components of this Trove kit are UL Listed sub-assemblies. Please refer to the included corresponding Sub-Assembly Installation Guides for further information.
Installation Guide
Wiring methods shall be in accordance with the National Electrical Code/NFPA 70/ANSI, and with all local codes and authorities having jurisdiction.
Product is intended for indoor use only.
- Remove backplane from enclosure. Do not discard hardware.
- Mark and predrill holes in the wall to line up with the top two/three keyholes in the enclosure. Install two/three upper fasteners and screws in the wall with the screw heads protruding. Place the enclosure's upper keyholes over the two/three upper screws; level and secure. Mark the position of the lower three holes. Remove the enclosure. Drill the lower holes and install the three fasteners. Place the enclosure's upper keyholes over the two/three upper screws. Install the three lower screws and make sure to tighten all screws.
- Mount included UL Listed tamper switches (Altronix Model TS112 or equivalent) in desired locations, opposite hinge. Slide the tamper switch bracket onto the edge of the enclosure approximately 2 inches from the right side. Connect tamper switch wiring to the Access Control Panel input or the appropriate UL Listed reporting device. To activate alarm signal, open the door of the enclosure.
- Mount S2-INST Installation Kit to backplane, refer to page 3.
- Refer to the eFlow Power Supply/Charger Installation Guide for eFlow102NB and eFlow104NB and corresponding Sub-Assembly Installation Guides for ACM4(CB), ACM8(CB) and PD16W(CB) for further installation instructions.
Hardware
Lock Nut: [lock-nut]
Figure 1 Description: Illustrates the mounting of a tamper switch on the edge of the enclosure, connected to an access control panel or reporting device.
Overview
Altronix T3SSK75F28 and T3SSK75F28D Trove S2 kits are pre-assembled and consist of Trove enclosures/backplanes with factory installed Altronix power supply/chargers and sub-assemblies. Both kits accommodate Lenel-S2 (S2 Security Platform) S2-INST Installation Kit for S2 Network Node for up to twenty-eight (28) (T2SSK7F8) doors in a single enclosure.
Configuration Chart
Altronix Model Number | Nominal DC Output Voltage | Power Supply 1 | Power Supply 2 | Max Supply Current for Main and Aux. Outputs on PS Board & ACM8(CB) | 120VAC 60Hz Input Current (A) | PS Board Input Fuse Rating | PS Board Battery Fuse Rating | Output Range (VDC) | Fail-Safe/Fail-Secure Outputs | Additional Fused Outputs | ACM8(CB) Input Fuse Rating | ACM8 Output Fuse Rating | ACM8CB Output PTC Rating | ACM4(CB) Input Fuse Rating | ACM4 Output Fuse Rating | ACM4CB Output PTC Rating | PD16W Output Fuse Rating | PD16WCB Output PTC Rating | |||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
[DC] | [Aux] | [DC] | [Aux] | Output 1 | Output 2 | Output 3 | Output 4 | ||||||||||||||||
T3SSK75F28 | 7.5 | eFlow104NB | eFlow102NB | 24VDC @ 9.4A 12VDC @ 10A | 6.3A/ 250V | 15A/ 32V | 20.17-20.28- 9.7- 10.0332V | 3.5A/ 250V | 3A/ 250V | 3.5A/ 250V | 10A/ 32V | 28 | 16 | 3.5A/ 250V | 10A/ 250V | 2.5A | |||||||
T3SSK75F28D | 7.5 | eFlow104NB | eFlow102NB | 24VDC @ 9.4A 12VDC @ 10A | 6.3A/ 250V | 5A/ 250V | 26.4 26.4 13.2 13.2 | 3.5A/ 250V | 3A/ 250V | 3.5A/ 250V | 10A/ 32V | 28 | 16 | 2.5A | 2.5A | 3.5A/ 250V | 10A/ 250V | 2.5A |
Access Controller Position Chart for the S2-INST Installation Kit
Figure 2 Description: A diagram showing the placement of various Altronix components (eFlow power supplies, ACM8(CB) and ACM4(CB) access power controllers, PD16W(CB) distribution modules, RSB2 bracket, and S2-INST installation kits) onto the TSS3 backplane within the Trove3 enclosure.
Figure 2a Description: Illustrates the attachment of the S2-INST bracket to the backplane using a lock nut and PEM fastener.
Installation Steps for S2-INST Kit:
- Align S2-INST mounting holes with pems on TSS3.
- Attach S2-INST to backplane with lock nuts (provided).
- Mount backplane to enclosure with hardware.
- Fasten TSS3 backplane to Trove3 enclosure utilizing hardware (provided).
Trove3 Enclosure Dimensions
The Trove3 enclosure has approximate dimensions of 36.12 inches (917.5mm) in height, 30.125 inches (768.1mm) in width, and 7.06 inches (179.3mm) in depth. The diagram shows specific measurements for mounting holes and component placement areas on the enclosure and backplane.
Key Dimensions:
- Height: 36.12" (917.5mm)
- Width: 30.125" (768.1mm)
- Depth: 7.06" (179.3mm)
- Various hole and mounting point dimensions are detailed in the original diagram.