STAR & ART BLACK ECOLINE DOUCHECABINE

Installation instructions

SIZE: 90*90*200 cm

SIZE: 100*100*200 cm

Tools Required (Not Supplied)

When you're ready to start, make sure that you have the following tools to hand, plenty of space, and a clean dry area for assembly.

Two people are needed. Please note: Although these instructions are comprehensive, we always recommend that a technically competent installer should undertake installation.

Tools:

Parts List

PartDescriptionQuantity
A18PCS
B14x25mm8PCS
C14x20mm2PCS
D14x10mm4PCS
E14x8mm4PCS
F14PCS
G14PCS
H18PCS
I14PCS
J14PCS
K12PCS
L12PCS
M12PCS
N1Ø3mm1PCS

Assembly Steps

Step 1: Wall Mounting

Prepare the wall by drilling holes using a 5.5mm drill bit. Attach the vertical profiles (A) to the wall using screws (A1) and (B1). Ensure the profiles are level.

Diagram description: Shows a vertical profile (A) being attached to a corner wall with multiple screws (A1, B1). A close-up shows drilling with a 5.5mm bit and inserting screws.

Step 2: Frame Assembly

Attach horizontal profiles (F) and vertical supports (B) to the wall-mounted profiles. Use screws (G1) and (D1) for connections. Ensure proper alignment.

Diagram description: Shows the attachment of horizontal and vertical frame members using screws (G1, D1). Close-ups illustrate the connection points.

Step 3: Glass Panel Installation

Insert the glass panels into the frame. Secure them using fixings (L1) and (N1 - Ø3mm). Attach the bottom and top channels with screws (F1) and (E1 - st4x8mm).

Diagram description: Shows glass panels being slotted into the frame. Close-ups detail the use of fixings (L1, N1) and screws (F1, E1) to secure the glass.

Step 4: Door Installation

Attach the doors to the frame. Use the provided rollers and guides (J1) to ensure smooth operation. Secure the doors in place.

Diagram description: Shows doors being fitted into the frame, with close-ups illustrating the attachment mechanism using parts like J1.

Step 5: Final Securing and Adjustments

Install the handles (K1) using screws (M1) and (C1 - st4x20mm). Make any necessary adjustments to ensure the doors close properly and the cabin is stable. A note indicates '48' which might refer to a time or a specific setting.

Diagram description: Shows handles being attached to the doors. Close-ups detail the screw types (M1, C1) used for this. Another diagram shows final adjustments to the door alignment.

Models: STAR and ART BLACK ECOLINE DOUCHECABINE

File Info : application/pdf, 7 Pages, 1.31MB

PDF preview unavailable. Download the PDF instead.

original GPL Ghostscript 9.26

Related Documents

Preview Star & Art Black Ecoline Douchcabine Installation Instructions
Detailed installation instructions for the Star & Art Black Ecoline Douchcabine, a 2-door shower cabin available in sizes 90x90x200 cm and 100x100x200 cm. The guide includes a list of required tools, parts, and step-by-step assembly diagrams.
Preview STAR & ART BLACK ECOLINE DOUCHECABINE SLIDE DOOR Installation Instructions
Comprehensive installation guide for the STAR & ART BLACK ECOLINE DOUCHECABINE SLIDE DOOR, detailing required tools, parts, and step-by-step assembly for shower cabin installation.