Star & Art Black Ecoline Douchcabine Installation Instructions

Product Description

This document provides installation instructions for the Star & Art Black Ecoline Douchcabine. The shower cabin is available in two sizes: 90x90x200 cm and 100x100x200 cm.

Tools Required (Not Supplied)

Ensure you have the following tools before starting assembly. It is recommended that two people undertake the installation. While these instructions are comprehensive, a technically competent installer is advised.

Parts List

The following parts are included in the package:

Part A1: 8PCS
Part B1: 8PCS (4x25mm)
Part C1: 4PCS (4x20mm)
Part D1: 4PCS (4x10mm)
Part E1: 4PCS (4x8mm)
Part F1: 4PCS
Part G1: 4PCS
Part H1: 8PCS
Part I1: 4PCS
Part J1: 4PCS
Part K1: 2PCS
Part L1: 2PCS
Part M1: 2PCS
Part N1: 1PCS (Ø3mm)

Assembly Steps

Follow these steps carefully for proper installation:

  1. Step 1: Wall Mounting

    Attach part A to the wall using appropriate fixings. Ensure it is level.

    Diagram Description: Shows part A being attached vertically to a corner wall, with multiple screws being inserted.

  2. Step 2: Attaching Side Panels

    Connect side panels (B) to the wall-mounted part A using screws (B1). Ensure a secure fit.

    Diagram Description: Shows side panels B being attached to the main frame A using screws B1. Close-ups show the connection points.

  3. Step 3: Installing Top and Bottom Profiles

    Attach top and bottom profiles (C, D, E, F) to the side panels using screws (G1, H1, I1, J1).

    Diagram Description: Illustrates the attachment of horizontal profiles to the vertical panels using various screws.

  4. Step 4: Securing Corner Posts

    Install corner posts (K1) and secure them using screws (L1, M1).

    Diagram Description: Shows the corner posts being fitted and secured with screws.

  5. Step 5: Installing Doors

    Attach the doors using the provided hinges and fixings (N1, E1, F1). Ensure smooth operation.

    Diagram Description: Depicts the installation of the shower doors, showing how they attach to the frame and roll on tracks.

  6. Step 6: Final Adjustments

    Make any necessary adjustments to ensure the doors are aligned and the cabin is stable. Apply silicone sealant around the base and edges for waterproofing.

    Diagram Description: Shows the completed shower cabin with arrows indicating final adjustments and sealant application.

Models: STAR and ART Black ECOLINE Douchecabine, STAR ECOLINE Douchecabine, ART Black ECOLINE Douchecabine, ECOLINE Douchecabine, Douchecabine

PDF preview unavailable. Download the PDF instead.

original GPL Ghostscript 9.26

Related Documents

Preview STAR & ART BLACK ECOLINE Shower Cabin Installation Instructions
Detailed installation guide for the STAR & ART BLACK ECOLINE shower cabin, including required tools, parts list, and step-by-step assembly instructions.
Preview STAR & ART BLACK ECOLINE DOUCHECABINE SLIDE DOOR Installation Instructions
Comprehensive installation guide for the STAR & ART BLACK ECOLINE DOUCHECABINE SLIDE DOOR, detailing required tools, parts, and step-by-step assembly for shower cabin installation.