Materials
- M1: CuSn5ZnPb (Rg5)
- M2: EN-GJS-400-18-LT (GGG 40.3)
Torque Specifications
35 Nm
- SW 50
- SW 55
14 Nm
- SW 12
Service Kit Contents
| Quantity | Part Number | Type | Kit |
|---|---|---|---|
| 2 | PN 25 | AVA | M1 |
| 2 | PN 25 | AVA | M2 |
| 3 | PN 25 | AVDS | M1 |
| 4 | PN 25 | SAVA | M1 |
| 4 | PN 25 | SAVA | M2 |
| 5 | PN 25 | SAVD | M1 |
| 5 | PN 25 | SAVD | M2 |
Detailed Service Instructions
The following sections provide step-by-step instructions for installing the service kits for various valve types.
PN 25 AVA - M1 Service Kit
Step 1
Diagram shows the main valve body. Component 1, a small threaded part, is attached to the top. Component 2, a larger threaded assembly, is shown being fitted onto the main valve body.
Part references: 1, 2
Step 2
The valve assembly from Step 1 is shown. Component 1 is fully attached. Component 2 is shown being tightened onto the valve body using a wrench (indicated by a circular arrow and 'SW 50' text, implying 35 Nm torque).
Part references: 1, 2
Torque: 35 Nm (SW 50)
Step 3
The valve body is shown with a new component (indicated by 'NEW' and a cup-like symbol) being attached to the side via a small tube or connection.
Part references: 1, 2
[new part indicator]
Step 4
The assembled valve is shown. A wrench is indicated around a hexagonal nut on the side, with 'SW 12' text, implying 14 Nm torque.
Torque: 14 Nm (SW 12)
Step 5
The final assembled valve is shown, ready for installation.
PN 25 AVA - M2 Service Kit
Step 1
Diagram shows the main valve body. Component 1, a small threaded part, is attached to the top. Component 2, a larger threaded assembly, is shown being fitted onto the main valve body.
Part references: 1, 2
Step 2
The valve assembly from Step 1 is shown. Component 1 is fully attached. Component 2 is shown being tightened onto the valve body using a wrench (indicated by a circular arrow and 'SW 55' text, implying 35 Nm torque).
Part references: 1, 2
Torque: 35 Nm (SW 55)
Step 3
The valve body is shown with a new component (indicated by 'NEW' and a cup-like symbol) being attached to the side via a small tube or connection.
Part references: 1, 2
[new part indicator]
Step 4
The assembled valve is shown. A wrench is indicated around a hexagonal nut on the side, with 'SW 12' text, implying 14 Nm torque.
Torque: 14 Nm (SW 12)
Step 5
The final assembled valve is shown, ready for installation.
PN 25 AVDS - M1 Service Kit
Step 1
Diagram shows the valve body. Component 1 (a small threaded piece) is being screwed into the top of the valve body. Component 2 (a larger assembly) is shown ready to be attached. Component 3 (a ring or seal) is also shown.
Part references: 1, 2, 3
Step 2
Diagram shows the valve body with component 1 installed. Component 2 is being attached to the top. A new component, indicated by 'NEW' and a cup-like symbol, is shown ready to be fitted into the valve body.
Part references: 1, 2
[new part indicator]
Step 3
Diagram shows the valve body with component 1 installed. A new component, indicated by 'NEW' and a cup-like symbol, is shown being fitted into the valve body. Another new component, also indicated by 'NEW' and a cup-like symbol, is shown being fitted into the valve body.
Part references: 1
[new part indicator]
PN 25 SAVA - M1 Service Kit
Step 1
Diagram shows the main valve body. Component 1, a small threaded part, is attached to the top. Component 2, a larger threaded assembly, is shown being fitted onto the main valve body.
Part references: 1, 2
Step 2
The valve assembly from Step 1 is shown. Component 1 is fully attached. Component 2 is shown being tightened onto the valve body using a wrench (indicated by a circular arrow and 'SW 50' text, implying 35 Nm torque).
Part references: 1, 2
Torque: 35 Nm (SW 50)
Step 3
The valve body is shown with a new component (indicated by 'NEW' and a cup-like symbol) being attached to the side via a small tube or connection.
Part references: 1, 2
[new part indicator]
Step 4
The assembled valve is shown. A wrench is indicated around a hexagonal nut on the side, with 'SW 12' text, implying 14 Nm torque.
Torque: 14 Nm (SW 12)
Step 5
The final assembled valve is shown, ready for installation.
PN 25 SAVA - M2 Service Kit
Step 1
Diagram shows the main valve body. Component 1, a small threaded part, is attached to the top. Component 2, a larger threaded assembly, is shown being fitted onto the main valve body.
Part references: 1, 2
Step 2
The valve assembly from Step 1 is shown. Component 1 is fully attached. Component 2 is shown being tightened onto the valve body using a wrench (indicated by a circular arrow and 'SW 55' text, implying 35 Nm torque).
Part references: 1, 2
Torque: 35 Nm (SW 55)
Step 3
The valve body is shown with a new component (indicated by 'NEW' and a cup-like symbol) being attached to the side via a small tube or connection.
Part references: 1, 2
[new part indicator]
Step 4
The assembled valve is shown. A wrench is indicated around a hexagonal nut on the side, with 'SW 12' text, implying 14 Nm torque.
Torque: 14 Nm (SW 12)
Step 5
The final assembled valve is shown, ready for installation.
PN 25 SAVD - M1 Service Kit
Step 1
Diagram shows the main valve body. Component 1, a small threaded part, is attached to the top. Component 2, a larger threaded assembly, is shown being fitted onto the main valve body.
Part references: 1, 2
Step 2
The valve assembly from Step 1 is shown. Component 1 is fully attached. Component 2 is shown being tightened onto the valve body using a wrench (indicated by a circular arrow and 'SW 50' text, implying 35 Nm torque).
Part references: 1, 2
Torque: 35 Nm (SW 50)
Step 3
Diagram shows the valve body with a new component (indicated by 'NEW' and a cup-like symbol) being fitted into the valve body. A ring or seal is also shown.
Part references: 1, 2
[new part indicator]
Step 4
Diagram shows the valve body with a new component (indicated by 'NEW' and a cup-like symbol) being fitted into the valve body.
Part references: 1, 2
[new part indicator]
Step 5
Diagram shows the assembled valve. A wrench is indicated around a hexagonal nut on the side, with 'SW 12' text, implying 14 Nm torque.
Torque: 14 Nm (SW 12)
Step 6
The final assembled valve is shown, ready for installation.
PN 25 SAVD - M2 Service Kit
Step 1
Diagram shows the main valve body. Component 1, a small threaded part, is attached to the top. Component 2, a larger threaded assembly, is shown being fitted onto the main valve body.
Part references: 1, 2
Step 2
The valve assembly from Step 1 is shown. Component 1 is fully attached. Component 2 is shown being tightened onto the valve body using a wrench (indicated by a circular arrow and 'SW 55' text, implying 35 Nm torque).
Part references: 1, 2
Torque: 35 Nm (SW 55)
Step 3
Diagram shows the valve body with a new component (indicated by 'NEW' and a cup-like symbol) being fitted into the valve body. A ring or seal is also shown.
Part references: 1, 2
[new part indicator]
Step 4
Diagram shows the valve body with a new component (indicated by 'NEW' and a cup-like symbol) being fitted into the valve body.
Part references: 1, 2
[new part indicator]
Step 5
Diagram shows the assembled valve. A wrench is indicated around a hexagonal nut on the side, with 'SW 12' text, implying 14 Nm torque.
Torque: 14 Nm (SW 12)
Step 6
The final assembled valve is shown, ready for installation.








