SIIG High Premium Aluminum Gas Spring Wall Mount Dual Monitor
Installation Guide
Important Information & Safety Precautions
Before You Start
- Read the entire instruction manual before you start installation and assembly. If you have any question regarding any of the instructions or warnings, please contact SIIG.
Unpacking
- Carefully remove the contents and lay them out on cardboard or other protective surface.
- Check package contents against the parts list to ensure that all components are received undamaged. Do not use damaged or defective parts.
- Ensure that you have received all parts according to the component checklist prior to installation. If any parts are missing or faulty, please contact SIIG.
CAUTION:
- ⚠️ Use with products heavier than the rated weights indicate may result in instability causing possible injury.
- ⚠️ Mount must be attached as specified in assembly instructions. Improper installation may result in damage or serious personal injury.
- ⚠️ Safety gear and proper tools must be used. This product should only be installed by professionals.
- ⚠️ This product is designed to be installed on wood stud walls, solid concrete walls or brick walls.
- ⚠️ Make sure that the supporting surface will safely support the combined weight of the equipment and all attached hardware and components.
- ⚠️ Use the mounting screws provided and DO NOT OVER TIGHTEN mounting screws.
- ⚠️ This product contains small items that could be a choking hazard if swallowed. Keep these items away from children.
- ⚠️ This product is intended for indoor use only. Using this product outdoors could lead to product failure and personal injury.
MAINTENANCE
- Check that the bracket is secure and safe to use at regular intervals (at least every three months).
Product Specifications
Feature | Specification |
---|---|
Manufacturer | SIIG |
Model Name | High Premium Aluminum Gas Spring Wall Mount Dual Monitor |
Part Number (P/N) | CE-MT2M12-S1 |
Internal Code | 04-1134B |
Warranty | TWO YEAR Manufacturer Warranty |
VESA Mounting Patterns | 75x75mm / 100x100mm |
Maximum Monitor Size | 32 inches |
Weight Capacity per Monitor | 1~9kg (2.2~19.8lbs) |
Arm Extension | Up to 280mm (approx. 11 inches) |
Articulation | Swivel: ±180°, Tilt: ±90°, Vertical Tilt: +35°/-35° |
Intended Use | Indoor |
Parts List
Item | Description | Quantity |
---|---|---|
A | Monitor Arm Assembly | x1 |
B | VESA Mounting Plate | x2 |
C | Central Pole Assembly | x1 |
D | Spacers | x3 |
E | 6mm Tool | x1 |
M-A | M4x12mm Screw | x4 |
M-B | M4x16mm Screw | x4 |
M-C | M5x12mm Screw | x4 |
M-D | M5x16mm Screw | x4 |
M-E | D5 (5mm) Screw/Washer | x4 |
M-F | Tension Adjustment Screw | x4 |
W-A | Wood Stud Wall Screw | x3 |
W-B | Concrete/Brick Wall Anchor | x3 |
W-C | Wall Plate Mounting Screw | x3 |
Installation Steps
Step 1: Assemble Mount Base
Attach the monitor arm assemblies (A) to the central pole assembly (C).
Diagram Description: Shows two monitor arm assemblies (A) being connected to the central pole assembly (C).
Step 1b: Attach Wall Plate
Connect the assembled central pole to the wall plate.
Diagram Description: Depicts the central pole assembly being attached to the wall plate, indicating how it will connect to the wall.
Step 2: Attach VESA Plates to Monitors
Secure the VESA mounting plates (B) to the back of each monitor using the appropriate screws (M-A, M-B, M-C, M-D, M-E) and spacers (D) if needed. Ensure screws are snug but not overtightened.
Diagram Description: Illustrates attaching the VESA plates (B) to the rear of monitors using various screws (M-A, M-B, M-C, M-D, M-E) and spacers (D). It shows different screw lengths and hole patterns for compatibility.
Step 3a: Mount Wall Plate to Wood Stud Wall
Locate wall studs. Position the wall plate and secure it to the stud using the wood stud screws (W-A) and wall plate mounting screws (W-C). Ensure the mount is firmly attached.
Diagram Description: Shows the wall plate being mounted to a wood stud wall. It includes icons indicating the need to find studs, use appropriate screws (W-A, W-C), and checks for correct installation (✔️) versus incorrect (❌).
Step 3b: Mount Wall Plate to Concrete/Brick Wall
For solid concrete or brick walls, drill holes and insert wall anchors (W-B). Position the wall plate and secure it using the wall plate mounting screws (W-C).
Diagram Description: Illustrates mounting the wall plate to a solid concrete or brick wall. It shows the use of wall anchors (W-B) and wall plate mounting screws (W-C), with checks for correct (✔️) and incorrect (❌) installation.
Step 4: Attach Monitors to Mount
Carefully lift each monitor and attach it to the corresponding arm assembly on the wall mount. Ensure the VESA plates click securely into place.
Diagram Description: Shows the process of attaching the monitors (already fitted with VESA plates) onto the wall mount arm assemblies. It implies a secure locking mechanism.
Step 5-8: Adjustments and Final Touches
Adjust the gas spring tension using the provided tool (E) and screws (M-F) to balance the weight of the monitors. Fine-tune the tilt, swivel, and rotation angles to achieve the desired viewing position. The mount allows for ±180° swivel, ±90° tilt, and +35°/-35° vertical tilt, with an arm extension up to 280mm.
Diagram Description: These steps detail the fine-tuning and adjustment process. Step 7 specifically shows how to adjust the gas spring tension using screw M-F. Step 8 illustrates the final articulation ranges (swivel ±180°, tilt ±90°, vertical tilt +35°/-35°) and arm extension (max 280mm).
Support
For more information or technical support, please visit: http://www.siig.com/support