HOMCOM 801-077 Kitchen Trolley Assembly Instructions
Model: 801-077
Estimated Assembly Time: 30 min
People Required: 2 people ?
Parts List
Part No. | Description | Quantity |
---|---|---|
1 | Top Panel | 1 pc |
2 | Left Side Panel | 1 pc |
3 | Right Side Panel | 1 pc |
4 | Back Panel (Upper) | 1 pc |
5 | Back Panel (Lower) | 1 pc |
6 | Middle Shelf | 1 pc |
7 | Side Shelves | 2 pcs |
8 | Drawer Front Panel | 1 pc |
9 | Drawer Back Panel | 1 pc |
10 | Bottom Panel | 1 pc |
11 | Drawer Side Panels | 2 pcs |
12 | Drawer Back Panel | 1 pc |
13 | Drawer Bottom Panel | 1 pc |
14 | Drawer Side Panel (with runners) | 2 pcs |
15 | Drawer Runner | 2 pcs |
16 | Drawer Assembly Base | 1 pc |
Hardware List
Identifier | Description | Quantity |
---|---|---|
A | Screw $\phi 6 \times 35$mm | 38 pcs |
B | Screw $\phi 15 \times 11$mm | 38 pcs |
C | Screw $\phi 8 \times 30$mm | 18 pcs |
D | Screw $3.5 \times 12$mm | 48 pcs |
E | Screw $M4 \times 20$mm | 2 pcs |
F | Screw $M4 \times 35$mm | 2 pcs |
G | Drawer Slide/Support ($285 \times 26 \times 8$mm) | 2 pcs |
H | Drawer Slide/Support ($285 \times 18 \times 6$mm) | 2 pcs |
I | Screw $\phi 10 \times 36$mm | 4 pcs |
J | Screw $M4 \times 20$mm | 4 pcs |
K | Screw $M4 \times 35$mm | 4 pcs |
L | Hinges | 4 pcs |
Assembly Instructions
Step 1
Attach the Middle Shelf (Part 6) between the Left Side Panel (Part 2) and the Right Side Panel (Part 3). Secure using four screws of type A ($\phi 6 \times 35$mm), four screws of type B ($\phi 15 \times 11$mm), and four screws of type C ($\phi 8 \times 30$mm).
Diagram Description: Shows Part 2 and Part 3 standing vertically. Part 6 is positioned horizontally between them. Screws are inserted through pre-drilled holes to connect the parts.
Step 2
Attach the Lower Back Panel (Part 5) to the rear bottom of the structure. Attach the two Side Shelves (Part 7) vertically to the sides. Secure these parts using fourteen screws of type A ($\phi 6 \times 35$mm), fourteen screws of type B ($\phi 15 \times 11$mm), and six screws of type C ($\phi 8 \times 30$mm).
Diagram Description: The assembly from Step 1 is shown. Part 5 is fixed to the back. Parts 7 are mounted vertically on the inner sides, creating open compartments.
Step 3
Attach the Drawer Back Panel (Part 9) to the rear of the middle shelf area. Secure using two screws of type B ($\phi 15 \times 11$mm) and two screws of type C ($\phi 8 \times 30$mm).
Diagram Description: Shows the structure from Step 2. Part 9 is attached to the back edge of the middle shelf (Part 6).
Step 4
Attach the Bottom Panel (Part 10) to the base of the main cabinet structure. Secure using eight screws of type A ($\phi 6 \times 35$mm) and four screws of type C ($\phi 8 \times 30$mm).
Diagram Description: The main cabinet frame is shown. Part 10 is placed at the bottom and fastened with screws.
Step 5
Install the drawer runners. Attach two drawer slides/supports (Part G, $285 \times 26 \times 8$mm) to the inner side of the Left Side Panel (Part 2) and the Right Side Panel (Part 3). Attach two drawer slides/supports (Part H, $285 \times 18 \times 6$mm) to the sides of the Middle Shelf (Part 6). Secure all runners using sixteen screws of type D ($3.5 \times 12$mm), two screws of type E ($M4 \times 20$mm), and two screws of type F ($M4 \times 35$mm).
Diagram Description: The main cabinet structure is shown. Drawer runners (G and H) are positioned and screwed onto the interior surfaces of the side panels and the middle shelf.
Step 6
Assemble the drawer front. Attach the Drawer Front Panel (Part 8) to the drawer structure. Secure using four screws of type D ($3.5 \times 12$mm) and two drawer slide/supports (Part G, $285 \times 26 \times 8$mm) which attach to the sides of the drawer front.
Diagram Description: Shows the drawer components. Part 8 is attached to the front of the drawer assembly. Parts G are used to connect the drawer front to the drawer sides.
Step 7
Attach the Top Panel (Part 1) to the top of the main cabinet structure. Secure using eight screws of type A ($\phi 6 \times 35$mm), eight screws of type B ($\phi 15 \times 11$mm), four screws of type C ($\phi 8 \times 30$mm), two screws of type I ($\phi 10 \times 36$mm), and four screws of type J ($M4 \times 20$mm).
Diagram Description: The main cabinet assembly is shown. Part 1 is placed on top and fastened with screws.
Step 8
Assemble the drawer box. Attach the Drawer Back Panel (Part 12) and the Drawer Bottom Panel (Part 13) to the two Drawer Side Panels (Part 14). Secure using four screws of type A ($\phi 6 \times 35$mm), four screws of type B ($\phi 15 \times 11$mm), four screws of type D ($3.5 \times 12$mm), two drawer slide/supports (Part H, $285 \times 18 \times 6$mm), and four screws of type K ($M4 \times 35$mm).
Diagram Description: Shows the components of the drawer being put together. Part 12 and 13 connect to Part 14. Drawer runners (H) are also attached to the drawer sides.
Step 9
Insert the assembled drawer into the main cabinet by aligning the drawer runners.
Diagram Description: The completed main cabinet and the assembled drawer are shown. The drawer is being slid into the cabinet on its runners.
Step 10
Attach the cabinet doors. Mount the four hinges (Part L) to the doors and the cabinet frame. Secure the hinges using twenty-four screws of type D ($3.5 \times 12$mm) and four hinges (Part L).
Diagram Description: Shows the front of the cabinet with the doors open. Hinges are attached to the doors and the cabinet frame, then secured with screws.