Quick Installation Manual - Growatt APX 5.0-30.0P-S1

Environment Requirements

Temperature: Minimum -10°C, Maximum +50°C

Relative Humidity: 5% to 95% RH

Dimensions

APX 98020-P1 (Power Module): Height 690mm, Width 295mm, Depth 185mm

APX 5.0P-B1 (Battery Module): Height 690mm, Width 295mm, Depth 185mm

Inspection Upon Delivery

APX 98020-P1 (Power Module) Packing List:

APX 5.0P-B1 (Battery Module) Packing List:

Accessories:

Additional Accessories:

Installation Configurations

The APX battery system supports expansion. A maximum of six battery modules can be connected to a single power module. Configurations vary based on capacity and mounting type.

Battery CapacityFloor-mounted Installation ComponentsWall-Mounted Installation Components
5kWhAPX 98020-P1 (Power Module) + APX 5.0P-B1 (Battery Module) + BaseAPX 98020-P1 (Power Module) + APX 5.0P-B1 (Battery Module) + Wall bracket
10kWhAPX 98020-P1 (Power Module) + 2x APX 5.0P-B1 (Battery Modules) + BaseAPX 98020-P1 (Power Module) + 2x APX 5.0P-B1 (Battery Modules) + Wall bracket
15kWhAPX 98020-P1 (Power Module) + 3x APX 5.0P-B1 (Battery Modules) + BaseAPX 98020-P1 (Power Module) + 3x APX 5.0P-B1 (Battery Modules) + Wall bracket
20kWhAPX 98020-P1 (Power Module) + 4x APX 5.0P-B1 (Battery Modules) + Wall bracketAPX 98020-P1 (Power Module) + 4x APX 5.0P-B1 (Battery Modules) + Wall bracket
25kWhAPX 98020-P1 (Power Module) + 5x APX 5.0P-B1 (Battery Modules) + 2x Base + Cascading cableAPX 98020-P1 (Power Module) + 5x APX 5.0P-B1 (Battery Modules) + 2x Wall bracket + Cascading cable
30kWhAPX 98020-P1 (Power Module) + 6x APX 5.0P-B1 (Battery Modules) + 2x Base + Cascading cableAPX 98020-P1 (Power Module) + 6x APX 5.0P-B1 (Battery Modules) + 2x Wall bracket + Cascading cable

Installation

Floor-mounted Installation

Installation Location Requirements:

Install on a level ground. A maximum of six battery modules can be stacked. For installations exceeding four modules, it is advised to arrange them in two columns.

Installation Procedure:

  1. Marking: Use the marking-off template to ensure accurate alignment for drilling.
  2. Drilling: Drill holes with an 8.0mm diameter and 45-50mm depth at the marked positions, ensuring a 90-degree angle.
  3. Fix Screws: Install M6 expansion screws into the wall/ground at the drilled holes.
  4. Install Connecting Pieces: Attach connecting pieces to the sides of the module and tighten the screws.
  5. Level Module: Use a level to ensure the battery module is perfectly horizontal.
  6. Install Anti-tipping Plates: Secure the anti-tipping plates to the sides of the module and tighten the screws.
  7. Secure Module: Fix the module to the wall/ground using the installed M6 expansion screws.
  8. Stacking Modules: For multiple modules, loosen the screws on the handles, move the handles up, and then tighten the screws to secure the modules together.

Wall-Mounted Installation

Installation Location Requirements:

Mount on a wall with sufficient load-bearing capacity (exceeding 280 kg). Ensure minimum clearances: 300mm on the sides, 100mm above and below. A maximum of five battery modules can be stacked vertically.

Installation Procedure:

  1. Install Wall Bracket: Securely mount the wall bracket to the wall.
  2. Marking: Use the marking-off template for precise hole placement on the wall.
  3. Drilling: Drill eight holes with an 8.0mm diameter and 45-50mm depth.
  4. Fix Screws: Install M6 expansion screws into the wall at the drilled holes.
  5. Install Anti-tipping Plates: Secure the anti-tipping plates to the sides of the module and tighten the screws.
  6. Fix Module to Bracket: Mount the battery module onto the installed wall bracket.
  7. Level Module: Use a level to ensure the battery module is horizontal.
  8. Secure Module: Fix the module to the wall using the installed M6 expansion screws.
  9. Stacking Modules: For multiple modules, loosen the screws on the handles, move the handles up, and then tighten the screws to secure the modules together.

Terminal Descriptions

APX 98020-P1 (Power Module) Terminal & Key Description:

APX 5.0P-B1 (Battery Module) Connection End Face Introduction:

Wiring and Connection

System Expansion: A maximum of six battery modules can be connected in parallel to a single power module.

Wiring Diagram: Connect DC input cables and signal cables between the Power Module (MOD 3-10KTL3-XH(BP)) and Battery Modules (APX 5.0P-B1). Ensure battery modules are paralleled correctly: B+ terminals connect to B+ terminals, and B- terminals connect to B- terminals.

Terminal Connection:

Note: It is not recommended to install a DC circuit breaker between the battery system and the PCS. If a DC circuit breaker is used, ensure its rated voltage is over 1000V and rated current is over 63A. Do not operate the DC circuit breaker while the system is powered on to avoid damage.

Key Operation

Power On:

  1. Turn on the DC Switch.
  2. Press the start key for more than 5 seconds.

Power Off:

  1. Turn off the DC Switch. Wait for over 90 seconds.

Safety Precautions:

Parallel Operation: When multiple battery systems are connected in parallel, pressing the start key of any one module will start the entire system.

Service and Contact

Company: Shenzhen Growatt New Energy Co., Ltd.

Address: 4-13/F, Building A, Sino-German (Europe) Industrial Park, Hangcheng Blvd, Bao'an District, Shenzhen, China.

Phone: +86 755 2747 1942

Email: service@ginverter.com

Website: www.ginverter.com

Manual Reference: GR-UM-358-A-01

Models: APX 5.0 30.0P-S1, APX HV Battery, APX Battery, HV Battery, Battery, APX 5.0-30.0P-S1 HV Battery, APX 5.0-30.0P-S1 Battery, APX 5.0-30.0P-S1

PDF preview unavailable. Download the PDF instead.

APX 5.0 30.0P S1 AU Quick Guide EN

Related Documents

Preview Growatt APX HV Battery: Flexible Energy Storage Solutions
Explore the Growatt APX HV Battery system, offering flexible 5kWh to 30kWh capacity, module-level energy optimization, and easy installation for reliable energy storage. Features 10-year warranty.
Preview Growatt APX HV Battery US: Technical Datasheet
Comprehensive technical specifications for the Growatt APX HV Battery US series, detailing system models from 5kWh to 30kWh, component specifications, features, and certifications.
Preview Growatt APX HV Battery System: Features and Technical Specifications
Comprehensive overview of the Growatt APX HV modular battery system, detailing its flexible capacity range (5kWh to 30kWh), module-level energy optimization, compatibility with existing and new modules, ease of installation, and long-term reliability. Includes detailed technical specifications for all APX HV models.
Preview Growatt APX 5.0~30.0P-S2 Quick Installation Manual
This guide details the installation of the Growatt APX 5.0~30.0P-S2 battery system, including power modules (APX 98034-P2) and battery modules (APX 5.0P-B1). It covers environmental requirements, component checks, floor and wall-mounted installation procedures, wiring, terminal connections, and system operation.
Preview Growatt APX 5.0-30.0P-S0 High Voltage Battery System User Manual
This user manual provides comprehensive information on the Growatt APX 5.0-30.0P-S0 High Voltage Battery System, covering installation, electrical connection, operation, maintenance, and troubleshooting. Learn about product features, functions, and safety precautions for optimal system performance.
Preview Growatt APX 5.0~30.0P-S0 Quick Installation Manual
Concise guide for installing the Growatt APX 5.0~30.0P-S0 battery storage system, covering environmental conditions, components, floor and wall-mounted installation procedures, system configuration, connections, and operation.
Preview Growatt APX 5.0-30.0P-S0 Quick Guide
Concise installation and setup guide for the Growatt APX 5.0-30.0P-S0 battery energy storage system. Covers environmental conditions, installation procedures for floor and wall mounting, system configurations, cable connections, and powering on/off procedures.
Preview Growatt APX Battery System Carbon Footprint Verification Statement
SGS verification statement for Shenzhen Growatt New Energy Co., Ltd.'s 1 kWh Battery system (APX-S1/S2), confirming its carbon footprint meets ISO 14067:2018 standards for cradle-to-gate assessment.