Growatt APX 5.0~30.0P-S2 Quick Installation Manual

Brand: Growatt

Manufacturer: Shenzhen Growatt New Energy Co.,Ltd.

Introduction and Environmental Requirements

This manual provides instructions for the quick installation of the Growatt APX 5.0~30.0P-S2 battery system. Ensure the following environmental conditions are met:

  • Maximum Temperature: +50°C
  • Minimum Temperature: -10°C
  • Relative Humidity: +5% to +95%

Recommended installation tools include M6 screws.

Component Checking

Before installation, verify all components are present and undamaged.

APX 98034-P2 (Power Module) Components:

  • Left trim-cover * 1
  • Right trim-cover * 1

APX 5.0P-B1 (Battery Module) Components:

Dimensions: 690 mm (height) x 185 mm (width).

Included Accessories:

  • Parallel cable * 1
  • Trim-cover * 2
  • Warranty card * 1
  • Anti-tipping plate * 2
  • M6 explosive screw * 2
  • M4x9 stainless steel screws * 3

System Configuration Accessories:

Depending on the system size and installation type, the following accessories are required:

  • APX 98034-P2 (Power Module)
  • APX 5.0P-B1 (Battery Module)
  • APX 5.0P-B1 Base (for floor installation)
  • Parallel extension cable
  • Cascading cable
  • Wall bracket
  • Operation Manual * 1
  • Quick installation manual * 1
  • Warranty Card * 1
  • Install-location card * 1
  • Protective rubber ring * 4
  • Anti-tipping plate * 2
  • M6 explosive screw * 2
  • M6x12 stainless steel screws * 1
  • M4x9 stainless steel screws * 3

System Size and Component Mapping:

Floor Installation (with Base):

Battery CapacityRequired Components (Floor)
5 kWhA + B + E
10 kWhA + B*2 + E
15 kWhA + B*3 + E
20 kWhA + B*4 + E
25 kWhA + B*5 + E*2 + D
30 kWhA + B*6 + E*2 + D
40 kWhA*2 + B*8 + E*2 + F
50 kWhA*2 + B*10 + E*4 + D*2 + F
60 kWhA*2 + B*12 + E*4 + D*2 + F

Wall-Mounted Installation:

Battery CapacityRequired Components (Wall-Mounted)
5 kWhA + B + C
10 kWhA + B*2 + C
15 kWhA + B*3 + C
20 kWhA + B*4 + C
25 kWhA + B*5 + C*2 + D
30 kWhA + B*6 + C*2 + D
40 kWhA*2 + B*8 + C*2 + F
50 kWhA*2 + B*10 + C*4 + D*2 + F
60 kWhA*2 + B*12 + C*4 + D*2 + F

(Note: 'A' represents APX 98034-P2 Power Module, 'B' represents APX 5.0P-B1 Battery Module, 'C' represents Wall Bracket, 'D' represents Parallel extension cable, 'E' represents Base, 'F' represents Cascading cable)

Installation Environment Notes

Build a sun and rain shade for modules to avoid direct exposure to sunlight and rain.

Floor Installation with Base

Installation Location Requirements:

  • Ensure a minimum clearance of 300mm around the installation area.
  • Vertical clearance requirement: 2300mm.
  • Horizontal clearance requirement: 500-600mm.

Note: For floor installation with a base, the maximum stack number of batteries is six. If the battery count exceeds four, it is recommended to stack them in two lines.

Installation Procedure:

Mounting Hole Dimensions (Unit: mm):

System SizeLeft Mounting Hole SpacingRight Mounting Hole Spacing
5 kWh245 mmN/A
10 kWh540 mmN/A
15 kWh835 mmN/A
20 kWh1130 mmN/A
30 kWh1425 mmN/A
  1. Install the connecting pieces on both sides of the base and tighten the two screws.
  2. Install the anti-tipping plate on both sides and tighten the two screws.
  3. Place the Battery Module onto the base, ensuring it is level.
  4. Secure the module by tightening the screws.

Module Stacking Procedure:

  1. Loosen two screws on the module handle, then move the handle up on both sides.
  2. Tighten the two screws to fix the battery modules together.
  3. Install connecting pieces on both sides and tighten the screws.
  4. Secure the stacked modules to the wall if necessary.

Wall-Mounted Installation

Installation Location Requirements:

  • Ensure a minimum clearance of 300mm around the installation area.
  • Vertical clearance requirement: 2300mm.
  • Horizontal clearance requirement: 500-600mm.

Note: The number of wall-mount installations should not exceed five. The wall's weight capacity must exceed 280kg.

Installation Procedure:

Mounting Hole Dimensions (Unit: mm):

System SizeLeft Mounting Hole SpacingRight Mounting Hole Spacing
5 kWh245 mmN/A
10 kWh540 mmN/A
15 kWh835 mmN/A
20 kWh1130 mmN/A
30 kWh1425 mmN/A
  1. Use an install-location card to mark alignment points on the wall.
  2. Drill mounting holes (Dia 8.0mm, Depth 45-50mm) on the wall.
  3. Install the M6 explosive screws into the drilled holes.
  4. Install the wall bracket onto the wall using the M6 explosive screws.
  5. Place the Battery Module onto the wall bracket, ensuring it is level.
  6. Install the anti-tipping plate on both sides and tighten the two screws.
  7. Install the connecting pieces on both sides and tighten the two screws.
  8. Secure the module to the wall bracket.

Module Fixing Procedure:

  1. Loosen two screws on the module handle, then move the handle up on both sides.
  2. Tighten the two screws to fix the battery and power modules.

Wiring and Connections

APX 98034-P2 (Power Module) Connection End Face Introduction:

The connection end face includes terminals for:

  • BAT-: Battery negative terminal to PCS
  • BAT N: Battery neutral terminal to PCS
  • BAT+: Battery positive terminal to PCS
  • INV: Inverter communication to PCS
  • COM: Communication port
  • RS485_B(B): RS485 communication B signal
  • RS485_A(A): RS485 communication A signal
  • BMU: Battery module communication to battery (Link-in) module
  • Module+: Battery module positive terminal to battery (B+) module
  • Module-: Battery module negative terminal to battery (B-) module
  • USB: USB terminal

APX 5.0P-B1 (Battery Module) Connection End Face Introduction:

The connection end face includes terminals for:

  • Link-in: Communication link-in to another battery (Link-out) or power module (BMU).
  • Link-out: Communication link-out to another battery (Link-in) module.
  • B+: Battery positive terminal to another battery (B+) module.
  • B-: Battery negative terminal to another battery (B-) module.
  • USB: USB terminal.

Battery Capacity Expansion:

The battery system supports power and capacity expansion. Two power control modules can be connected in parallel. One power control module supports a maximum of four battery expansion modules.

Example System Configurations:

  • 2.5KW / 5KWh
  • 5KW / 10KWh
  • 7.5KW / 15KWh
  • 10KW / 20KWh
  • 12.5KW / 25KWh
  • 15KW / 30KWh
  • 15KW / 30KWh (A)
  • 20KW / 40KWh (A+B)
  • 25KW / 50KWh (A+B)
  • 30KW / 60KWh (A+B)

Wiring Connection Diagram:

Connect the battery system to the PCS using the appropriate cables. The connection sequence involves ground cable, communication cable, and power cable.

Note: It is not recommended to install a DC circuit breaker between the battery system and the PCS. If a DC circuit breaker is installed, its rated working voltage must be greater than 1000V and its rated working current greater than 63A. Do not operate the DC circuit breaker with power on, as this may damage the equipment.

Routing Cables:

Route cables out of the designated cable holes on the APX 98034-P2 trim covers.

Communication Port Connection:

Details for communication port connections for MOD 3-10KTL3-XH and MID 11-30KTL3-XH are provided, specifying terminal serial numbers and definitions for signals like WAKE, BAT.EN, and RS485.

  • MOD 3-10KTL3-XH:
    • Terminal 1: WAKE-(W-)
    • Terminal 10: BAT.EN-
    • Terminal 9: BAT.EN+
    • Terminal 7: RS485_B(B)
    • Terminal 8: RS485_A(A)
  • MID 11-30KTL3-XH:
    • Terminal 10: BAT.EN-
    • Terminal 30: BAT.EN-
    • Terminal 9: BAT.EN+
    • Terminal 29: BAT.EN+
    • Terminal 8: RS485B2
    • Terminal 28: RS485B2
    • Terminal 7: RS485A2
    • Terminal 27: RS485A2

Terminal and Trim-cover Installation

Power Terminal Connection:

Connect the battery side wire harness to the corresponding terminals. Press the indicated position on the terminal before disconnecting to prevent damage.

Install Trim-cover:

Install the trim covers after all connections are made.

Key Operation

Power On:

  1. Turn on the DC Switch.
  2. Press the start key for more than 5 seconds.

System Off:

  1. Turn off the DC Switch.
  2. Wait for more than 90 seconds.

Note: When multiple battery systems are connected in parallel, pressing the start key on one module is sufficient to start the entire system.

Service and Contact Information

Company: Shenzhen Growatt New Energy Co., Ltd

Address: 4-13/F, Building A, Sino-German (Europe) Industrial Park, Hangcheng Ave, Bao'an District, Shenzhen, China

Phone: +86 755 2747 1942

Website: www.ginverter.com

Email: service@ginverter.com

Document Code: GR-UM-289-A-00

Models: APX 5.0 30.0P-S2, APX 98034-P2, APX 5.0P-B1, APX 5.0 30.0P-S2 Battery System, Battery System, System

File Info : application/pdf, 2 Pages, 13.06MB

PDF preview unavailable. Download the PDF instead.

growatt-apx-battery-handleiding

References

Related Documents

Preview Growatt APX HV Battery: Flexible Energy Storage Solutions
Explore the Growatt APX HV Battery system, offering flexible 5kWh to 30kWh capacity, module-level energy optimization, and easy installation for reliable energy storage. Features 10-year warranty.
Preview Growatt APX HV Battery US: Technical Datasheet
Comprehensive technical specifications for the Growatt APX HV Battery US series, detailing system models from 5kWh to 30kWh, component specifications, features, and certifications.
Preview Growatt APX HV Battery System: Features and Technical Specifications
Comprehensive overview of the Growatt APX HV modular battery system, detailing its flexible capacity range (5kWh to 30kWh), module-level energy optimization, compatibility with existing and new modules, ease of installation, and long-term reliability. Includes detailed technical specifications for all APX HV models.
Preview Growatt APX 5.0-30.0P-S0 Quick Guide
Concise installation and setup guide for the Growatt APX 5.0-30.0P-S0 battery energy storage system. Covers environmental conditions, installation procedures for floor and wall mounting, system configurations, cable connections, and powering on/off procedures.
Preview Growatt APX 5.0-30.0P-S1 Quick Installation Manual
Concise guide for installing the Growatt APX 5.0-30.0P-S1 series battery storage system, covering environment requirements, dimensions, inspection, configurations, floor and wall mounting procedures, terminal descriptions, wiring, and operation.
Preview Growatt APX 5.0-30.0P-S0 High Voltage Battery System User Manual
This user manual provides comprehensive information on the Growatt APX 5.0-30.0P-S0 High Voltage Battery System, covering installation, electrical connection, operation, maintenance, and troubleshooting. Learn about product features, functions, and safety precautions for optimal system performance.
Preview Growatt APX 5.0~30.0P-S0 Quick Installation Manual
Concise guide for installing the Growatt APX 5.0~30.0P-S0 battery storage system, covering environmental conditions, components, floor and wall-mounted installation procedures, system configuration, connections, and operation.
Preview Growatt APX Battery System Carbon Footprint Verification Statement
SGS verification statement for Shenzhen Growatt New Energy Co., Ltd.'s 1 kWh Battery system (APX-S1/S2), confirming its carbon footprint meets ISO 14067:2018 standards for cradle-to-gate assessment.