VEVOR is committed to providing tools at competitive prices. Phrases like "Save Half" or "Half Price" represent an estimated saving compared to major top brands and may not apply to all product categories. Customers are advised to verify savings carefully when placing an order.
Product Overview
A detailed textual description of the VEVOR SYTCSS03 Utility Cart. The cart features a multi-level design with a main platform and an upper tray, designed for efficient storage and transport of various items. It includes a handle for steering and is equipped with four castor wheels for mobility. The frame is constructed from durable materials, and the design prioritizes stability and ease of use.
Need Help? Contact Us!
For product questions or technical support, please contact VEVOR:
Technical Support and E-Warranty Certificate
www.vevor.com/support
This document contains the original instructions. Please read all manual instructions carefully before operating. VEVOR reserves the right to interpret the user manual. The appearance of the product is subject to the item received. VEVOR will not provide further notification for technology or software updates.
Product Parameters
Parameter | Value |
---|---|
Load Capacity | 250kg |
Upper Platform Size | 940*645*100mm |
Castor Size | 125mm |
Dimensions (L x W x H) | 1180mm x 650mm x 865mm |
Warnings
⚠️ WARNING: Please read this manual carefully before using the product. Failure to do so may result in serious injury.
Assembly Precautions
- Assembly must follow these instructions. Improper assembly can cause personal injury and/or property damage.
- Do not assemble when tired or under the influence of alcohol, drugs, or medication.
- Weight capacity and other product capabilities apply only to a wholly and correctly assembled product.
- Do not overload the cart. Refer to specifications for load capacity (Distributed evenly).
- Keep the assembly area clean and well-lit.
- Keep bystanders out of the assembly area.
- The weight of the components can be significant; pay attention during installation to avoid injury. If necessary, seek assistance for installation.
Use Precautions
⚠️ WARNING: TO PREVENT SERIOUS INJURY AND DEATH FROM TIPPING:
- This product is not a toy. Do not allow children to play with or approach this item.
- Use as intended only. Do not sit or stand on the product.
- Inspect before every use. Do not use if parts are loose or damaged.
- Use on flat, level, and hard surfaces only.
- Do not exceed the listed weight capacity. Tighten all knobs securely before applying load. Be aware of dynamic loading! Sudden load movement can create an excess load, causing product failure.
- When moving a heavy load for an extended period, periodically check if screws are loose to prevent the cart body from shaking.
Assembly Steps
Tools required: Cross-point screwdriver and rubber or wood mallet.
Use the mallet to gently tap parts into place to ensure they are seated properly before fastening with screws.
- Turn the upper platform upright (#2) and install the handle (#1).
- Turn the upper platform assembly upside down and install the legs (two left, #4 and two right, #5).
- Install the lower platform (#3) and the castors (#6, #7). Tighten all screws and hex nuts (#8, #9, #10).
Diagram Descriptions:
- Diagram 1: Illustrates the upper platform (#2) and the handle (#1) being prepared for attachment.
- Diagram 2: Shows the upper platform assembly inverted, with the legs (#4, #5) and associated hardware being attached.
- Diagram 3: Depicts the lower platform (#3) and the castors (#6, #7) being installed onto the cart frame, along with the hardware (#8, #9, #10) used for fastening.
Manufacturer and Distributor Information
Manufacturer: Shanghaimuxinmuyeyouxiangongsi
Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN.
Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia
Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
EU Representative: E-CrossStu GmbH, Mainzer Landstr.69, 60329 Frankfurt am Main.
UK Representative: YH CONSULTING LIMITED. C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX