Hoymiles Hybrid Inverter

Quick Installation Guide

Open Energy for All

Models: HYS-3.0LV-EUG1, HYS-3.6LV-EUG1, HYS-4.6LV-EUG1, HYS-5.0LV-EUG1, HYS-6.0LV-EUG1

Region: Global REV1.1

Website: hoymiles.com

1 General Declaration

  • The information in this quick installation guide is subject to change due to product updates or other reasons.
  • This guide cannot replace the product labels or the safety precautions in the user manual unless otherwise specified. All descriptions here are for guidance only.
  • Before installations, read through the quick installation guide and the user manual to learn about the product and the precautions.
  • All installations should be performed by trained and knowledgeable technicians who are familiar with local standards and safety regulations.
  • Check the deliverables for correct model, complete contents, and intact appearance. Contact the manufacturer if any damage is found or any component is missing.
  • Use insulating tools and wear personal protective equipment when operating the equipment to ensure personal safety. Wear anti-static gloves, clothes, and wrist strip when touching electron devices to protect the inverter from damage. The manufacturer shall not be liable for any damage caused by static electricity.
  • Strictly follow the installation, operation, and configuration instructions in this guide and user manual. The manufacturer shall not be liable for equipment damage or personal injury if you do not follow the instructions.
  • All cables in this article are copper cables.

2 Packing List

Inverter Components:

  • Inverter*1
  • Bracket*1
  • Communication Box*1
  • PV Connector(+) *2
  • PV Connector(-) *2
  • Double row plug*1
  • Document*1
  • Battery Connector(+) *1
  • Battery Connector(-) *1
  • Grid Connector*1
  • Generator Connector*1
  • EPS Connector*1

Accessories:

  • M6 Expansion Screws*4
  • Sleeve*4
  • Ground terminal*1
  • M4 Setscrew*1
  • M3 Setscrew*6
  • Communication terminal*12
  • AC terminal*9
  • Smart Meter*1 CT*1
  • DTS*1 (Optional: Wi-Fi, Ethernet, 4G)
  • Battery Temperature Sensor*1

3 Mounting the Inverter

Diagrams illustrating mounting requirements with minimum clearances of 200mm on the sides, 300mm on the top and bottom, and 500mm in front. An angle of at least 15° is indicated. Installation steps show attaching a bracket to the inverter using screws.

Mounting Clearances:

  • Side Clearance: ≥200mm
  • Top/Bottom Clearance: ≥300mm
  • Front Clearance: ≥500mm

Mounting Angle: ≥15°

Installation Steps: Visual guides show attaching the mounting bracket to the inverter using screws and mounting the assembly to a surface.

4 Wiring Diagram

Wiring diagrams are provided for different regions, including Australia, New Zealand, and South Africa, and for other countries. It is essential to follow local wiring regulations.

A comprehensive wiring diagram illustrates the connections for the Hoymiles HYS-LV Series Hybrid Inverter. It shows connections from PV arrays, Battery, BMS, Meter, EPS, and Grid inputs. The output connections lead to a Distribution Box, RCD, Smart Meter, Utility Meter, Normal Loads, and Backup Loads. Key terminals like L (Line), N (Neutral), and PE (Protective Earth) are clearly indicated. A specific note advises against connecting a terminal when the neutral wire and PE wire are connected together.

Model Specifications

The following table details the recommended DC breaker, AC breaker, and RCD ratings for each inverter model.

Model① DC Breaker② AC Breaker③ AC Breaker⑤ Main Breaker⑥⑦ 30mA RCD
HYS-3.0LV-EUG1100A/60V DC Breaker20A/230V AC Breaker40A/230V AC BreakerDepends on LoadsMain Breaker30mA RCD
HYS-3.6LV-EUG1125A/60V DC Breaker20A/230V AC Breaker40A/230V AC Breaker
HYS-4.6LV-EUG1125A/60V DC Breaker25A/230V AC Breaker40A/230V AC Breaker
HYS-5.0LV-EUG1125A/60V DC Breaker32A/230V AC Breaker40A/230V AC Breaker
HYS-6.0LV-EUG1125A/60V DC Breaker40A/230V AC Breaker40A/230V AC Breaker

Notes:

  • If the battery has an integrated DC breaker, no additional ① DC breaker is required.
  • The use of ⑥⑦ 30mA RCD is recommended but not mandatory; please comply with local regulations for system installation.

5 Electrical Connection

Step 1 Grounding Protection Wire

Diagram shows connecting a grounding wire (S≥6mm²) to the inverter's ground terminal using an M4 screw (1.2 N·m). Wire stripping lengths are specified as 7-8mm and 20-25mm.

Connect the grounding wire (S≥6mm²) to the inverter's ground terminal using an M4 screw (1.2 N·m). Ensure proper wire stripping (7-8mm and 20-25mm).

Step 2 Grid Connection (Same wirings for GEN connector, leave it alone if not used)

Diagrams show connecting MC4 connectors to the inverter for Grid or Generator input. Wire stripping is specified as 13mm-18mm, and torque as M6, 2 N·m.

Connect the Grid or Generator connector using MC4 connectors. Ensure proper wire stripping (13mm-18mm) and torque (M6, 2 N·m).

Step 3 EPS Connection

Diagrams show connecting the EPS connector, similar to Grid connection, using appropriate terminals and torque.

Connect the EPS connector using appropriate terminals and torque.

Step 4 PV Connection

Diagrams show connecting PV+ and PV- MC4 connectors to the inverter. Wire specifications: diameter of 4-5mm, and cross-sectional area between 2.5mm² and 4mm².

Connect PV+ and PV- MC4 connectors to the inverter. Use wires with a diameter of 4-5mm and a cross-sectional area between 2.5mm² and 4mm².

Step 5 Battery Connection

Diagrams show connecting Battery+ and Battery- connectors to the inverter. Wire specification: cross-sectional area of 20-25mm².

Connect Battery+ and Battery- connectors to the inverter. Use wires with a cross-sectional area of 20-25mm².

6 Signal Communication

RJ45 Terminal Connection (METER, BMS)

Diagrams show connecting METER and BMS devices to the inverter using RJ45 cables, following the port assignments shown.

Connect METER and BMS devices to the inverter using RJ45 cables, following the port assignments shown in the diagrams.

Step 7 Data Transfer Stick (DTS)

Wi-Fi Connection:

Diagrams show mounting the DTS, connecting the antenna, and establishing a Wi-Fi connection.

Mount the DTS, connect the antenna, and establish a Wi-Fi connection.

Ethernet Connection:

Diagrams show connecting an Ethernet cable to the DTS for network communication.

Connect an Ethernet cable to the DTS for network communication.

Signal Communication Pinout

A table details the function of various terminals including Meter (RS485), BMS (CAN, RS485, NTC), DRM, DI (Dry-contact input), Parallel operation terminals, 120 Ohm termination resistor, and DO1/DO2 (Dry-contact output) for control functions like Earth Fault Alarm, Load Control, etc.

6 DTS Online Setting

Follow these steps to set up the DTS online using the Hoymiles Installer App:

  1. Search for “Hoymiles” in the App Store (iOS) or Play Store (Android), or scan the QR code to download the Hoymiles Installer App.
  2. Open the app and log in with your installer account and password. New installers should apply for an account from their distributor in advance.
  3. Use the App to connect to the DTS:
    (a) Open the Installer App on your smartphone/tablet and log in. Click on “O&M” at the bottom of the page, then click on “Network Configuration”.
Screenshots of the Hoymiles Installer App guide the user through connecting to the DTS, selecting the DTS Wi-Fi network, entering the password, configuring the router Wi-Fi, and sending the configuration to the DTS. The final step shows checking for a solid blue indicator light on the DTS for a successful connection.

4. Network configuration:
(a) Upon successful connection, click on “Network Configuration” again to access the Network Configuration page.
(b) Select your router’s Wi-Fi and enter the password.
(c) Click on “Send to DTU”.

5. Check the DTS indicator for a solid blue light, which signifies a successful connection. The network configuration takes about 1 minute; please be patient. If the network is not connected, please check the internet as instructed.

For the full user manual, please visit www.hoymiles.com/resources/download/.

Hoymiles Power Electronics Inc.
Add: No.18 Kangjing Road, Hangzhou 310015, P.R. China
Tel: +86 571 2805 6101
Email: service@hoymiles.com, support@hoymiles.com

Models: HYS-3.0LV-EUG1, HYS-3.6LV-EUG1, HYS-4.6LV-EUG1, HYS-5.0LV-EUG1, HYS-6.0LV-EUG1, HYS-3.0LV-EUG1 Hybrid Inverter, Hybrid Inverter, Inverter

File Info : application/pdf, 16 Pages, 55.35MB

PDF preview unavailable. Download the PDF instead.

HYS-LV-EUG1-Series Quick-Installation-Guide Global EN V1.1

References

Adobe PDF library 15.00 Adobe Illustrator CC 22.0 (Windows)

Related Documents

Preview Hoymiles HAS-LV-EUG1 Series AC-coupled Inverter Quick Installation Guide
Quick installation guide for Hoymiles HAS-LV-EUG1 Series AC-coupled Inverters, covering mounting, wiring, electrical connections, and system commissioning. Includes safety precautions and component lists.
Preview Hoymiles and Pytes Lithium Battery V5 Series Installation and Configuration Manual
Installation and configuration guide for Pytes Lithium Battery V5 series with Hoymiles Inverters HYS-(3-6)LV-EUG1 and HAS-(3-5)LV-EUG1. Covers Bill of Materials (BOM), power and communication cable connections, DIP switch settings, system startup, battery configuration via S-MILES Cloud, and system monitoring. Includes detailed diagrams and instructions.
Preview Hoymiles Hybrid/AC-coupled Inverter User Manual - HYS/HAS-3.8-11.5LV-USG1 Series
Comprehensive user manual for Hoymiles HYS/HAS-3.8LV-USG1 to HYS/HAS-11.5LV-USG1 series hybrid/AC-coupled inverters. Covers safety, product overview, installation, operation, and troubleshooting.
Preview Hoymiles Product Brochure for North America
A comprehensive product brochure from Hoymiles detailing their range of microinverters, energy storage systems, data transfer units, and accessories for the North American market. It highlights product features, technical specifications, and project success stories.
Preview Hoymiles Data Transfer Stick User Manual: DTS-WiFi-G3, DTS-4G-G3, DTS-WL-G3
Comprehensive user manual for Hoymiles Data Transfer Stick (DTS) series, including DTS-WiFi-G3, DTS-4G-G3, and DTS-WL-G3. Covers installation, operation, features, safety, network configuration, and product compliance for connecting Hoymiles inverters to the S-Miles Cloud.
Preview Hoymiles DTS-G1 Series Data Transfer Stick: Quick Installation Guide
A comprehensive quick installation guide for the Hoymiles DTS-G1 Series Data Transfer Sticks (DTS-WIFI-G1, DTS-Ethernet-G1, DTS-4G-G1), covering packing lists, installation procedures, indicator status, and online setup via the Hoymiles Installer App.
Preview Hoymiles DTU-Pro(4G) Quick Installation Guide
Concise guide for installing and setting up the Hoymiles DTU-Pro(4G) data transfer unit for solar monitoring systems, covering interface layout, preparation, installation steps, and online setup.
Preview Hoymiles HMS-2000DW-4T Series Quick Installation Guide | Solar Microinverter Setup
Comprehensive quick installation guide for Hoymiles HMS-2000DW-4T Series solar microinverters. Learn about accessory parts, step-by-step installation, AC trunk cable connection, PV module integration, and system monitoring setup.