Natures Composites

Two-Board Ranch Rail Gate

Sustainable Outdoor Living

Installation Guide (07/25)

Compatible with Traditional & Modern Ranch Rail Designs

Visit our resources page for more information.

Before You Begin

A. Verify Underground Utilities: Before starting, contact local utility companies or use utility location services to ensure the installation area is clear of underground lines and potential hazards (call 811).

B. Locate Property Lines: Confirm the fence will be placed within your property boundaries to prevent encroachment and comply with any applicable legal requirements.

C. Review Local Building Codes: Check local building codes to ensure your installation complies with all requirements. Obtain any necessary permits prior to beginning the installation.

D. Use Appropriate Safety Gear: Wear protective equipment, including gloves, safety goggles, and work boots, to ensure a safe installation.

Tools Required

  • A. Rubber mallet (not included; used for securing angle brackets)
  • B. #4 Phillips screwdriver
  • C. Power drill (compatible with a #4 Phillips head screwdriver)
  • D. Torx T20 Bit (for fastening the top cap)
  • E. Two 2x4 (6 ft long) wood lumber pieces as support

Gate Installation Summary & Guidelines

This assembly requires an intermediate skill level. Prior experience with tools and assembly techniques is necessary.

For assembly, NC recommends positioning components on a sturdy work table.

NC Gates come in a fixed size of 45.5 inches wide by 26.68 inches tall and are not adjustable. Proper planning for the gate opening is essential to accommodate these exact dimensions.

This full-size gate weighs around 48 pounds and requires strong support. You must purchase NC's matching NC 5x5 Commercial Post to mount your gate; otherwise, it will not hold over time. Reinforce the composite post by inserting a 4x4 treated lumber post for extra strength.

Post Installation Accuracy: NC recommends taking the time to position the posts where the gate will be hung with precision before securing them into the ground.

FAQ: How should I space my posts if I'm adding a gate?

To add a gate, you must use two NC 5x5 Commercial Posts. Standard posts won't support the weight. The gate is 48" wide, and each post is 5" wide, so space them 58" apart (outside to outside) to ensure proper hinge and latch function. For added strength, insert a 4x4 treated wood post inside each composite post. For Full Size and Perimeter Gates with a 3.5" ground clearance, burial depth is 24". If you choose the 2" ground clearance option, burial depth increases to 25.5". For 2 or 3-board Ranch Rail Gates, burial depth is 16.5”.

Assembly Overview:

  1. Assemble the Metal Frame: Begin by assembling the metal frame according to the provided specifications.
  2. Position the Frame: Place the assembled metal frame inside the composite U-Posts.
  3. Install the Boards & Spacers: Insert the boards into the frame, ensuring they fit securely within the U-Posts.
  4. Secure the Gate: Fasten the structure by installing four 3-inch screws—one at each corner.
  5. Attach Top Caps: Slide the top caps onto each corner of the gate and secure them using the provided screws.

Once the gate is fully assembled, refer to the additional instructions for mounting the hardware and hanging the gate onto the posts.

Components List

A schematic of the two-board ranch rail gate shows the arrangement of components labeled A through L, illustrating the horizontal and vertical frame members, the two boards, spacers, and attachment points.

ITEM QTY DESCRIPTION NC PART
Complete Product 1 Three-Board Ranch Rail Gate 100323XX30400
A 2 Horizontal U-Post-40.5- Full 300722XX0405
B 2 Vertical U-Post-26.3 300722XX0263
C 2 Square Edge Board 1x6-42" 300341XX042
D 4 Modern Sliding Top Cap 200721BK00000
E 4 1 3/4 Torx Composite - Top Cap Screw TOP CAP SCREW
F 10 Rounded Head Thread-Cutting Screws for Metal AC90087A896
G 2 Metal Horizontal Upper/Lower Frame AC GATE UPPER FRAME
H 2 Metal Frame Extension (6.25") METAL_GATE_FRAME_EXT_2RR
I 1 Heavy Duty Hinge Set TCHDMA1S3BT
J 1 Small gate gravity latch 210001
K 2 Spacer 9.8" 200723XX015
L 8 Magnet Dots MAGNET DOTS

*Please note hardware kit is included in-between U-Posts in box.

Part A: Gate Assembly Instructions

1. Metal Frame Assembly

Begin by assembling the metal frame, which serves as the structural backbone of the gate.

1.1 Connect the Frame Components
  • Take 2 Horizontal Upper/Lower Frames (G) and connect them with 2 Frame Extensions (H).
  • Ensure the components are aligned properly for a seamless connection.

Tips for a Secure Fit:

  • The fit between the metal frame parts (G and H) is designed to be tight to ensure structural stability.
  • Use a rubber mallet to gently tap the components together, ensuring they are securely connected without damaging the frame.
  • Start with light taps and gradually increase force as needed until the parts are firmly joined.

Once the frame components are fully assembled, verify that all connections are tight and properly aligned before proceeding to the next step.

A diagram shows two horizontal frame pieces (G) being connected by two frame extensions (H).

2. Install the Square Edge Boards and Spacers

2.1 Prepare the Work Area

To facilitate the assembly process, place the assembled frame on two support structures, such as 2x4 wood pieces. This setup provides stability and elevates the frame just enough for easy access in the next step when the U-Posts are positioned.

A diagram depicts the assembled gate frame resting on two pieces of 2x4 lumber, elevating it for easier access.

FAQ: Can I paint my gate?

No! Painting is not advisable. Natures Composites products come pre-finished with durable, lasting color and a textured, non-reflective surface. They are designed to maintain their appearance without the need for painting, staining, or sealing—just occasional cleaning with soap and warm water.

2.2 Insert the First Square Edge Board (C) and 9" Spacers (K):
  1. Add First Board: Carefully position and insert the first Square Edge Board (C) into the metal gate frame.
  2. Apply Velcro Dots to first Spacer: Attach 4 Velcro dots (included) to the 9" spacer (L). Ensure the adhesive backing of each Velcro dot is applied to the spacer, with the Velcro side facing outward.

Tip: Place the four Velcro dots together (hook and loop connected) to simplify alignment. Ensure the adhesive backing on one side is firmly stuck to the spacer, while the other adhesive side is ready to stick to the Vertical U-Post (B) groove during installation.

2.3 Insert the Spacer (K):
  • Place the 9" spacer (K) on top of the installed Square Edge Board (C).
  • Ensure the spacer is properly positioned. It should rest fully on the Square Edge Board (C).
4.3 Repeat for the Next Boards:
  • Insert the next Square Edge Board (C) into the metal frame.
  • Position a 9" spacer (L) between each board, ensuring proper alignment and adhesion using the 4 Velcro dots per spacer.

Note: Double-check that each spacer and board are properly seated and aligned before proceeding to maintain structural stability and consistent spacing.

Two diagrams show the process of inserting the square edge boards (C) and spacers (K/L) into the frame, highlighting the use of Velcro dots for alignment.

3. Position the Horizontal and Vertical U-Posts

3.1 Insert the Vertical U-Posts
  1. Take the 2 Vertical U-Posts (B) and insert them into the metal frame and the Square Edge boards inside the frame.
  2. Align the channel of the Vertical U-Post (B) with the edge of the metal frame and the sides of the T&G boards. Slide the U-Post into place until it fits securely and is all the way in, ensuring that both the Square Edge boards and the metal frame are fully enclosed within the U-Post channel.
  3. Repeat this process for the opposite side, ensuring the Square Edge boards and the metal frame are enclosed and aligned on both vertical edges.

Note: The length of the Vertical U-Post (B) should be equal on both the top and bottom relative to the metal frame. Ensure that the gaps at the top and bottom of the U-Post are identical to maintain proper alignment and aesthetic balance.

3.2 Insert the Horizontal U-Posts
  1. Take the 2 Horizontal U-Posts (A) and prepare to insert them into the metal frame.
  2. Adjust the 2 support structures (e.g., 2x4s) to provide enough room for the first Horizontal U-Post (A) to fit into the frame.
  3. Slide the first Horizontal U-Post (A) into the frame, ensuring that its channel fits snugly over the edge of the metal frame and secures the Square Edge boards in place.
  4. Push the U-Post all the way in, ensuring that the Square Edge boards and the metal frame are fully enclosed within the U-Post channel.
  5. Once the first Horizontal U-Post (A) is fully inserted, carefully slide the 2 support structures to provide space for the second Horizontal U-Post (A). Make sure to do this carefully to ensure that the assembled pieces remain in place during this process.
  6. Insert the second Horizontal U-Post (A) in the same manner, ensuring that its channel also fits securely into the metal frame and encloses the Square Edge boards.

Key Notes: Double-check that all U-Posts (both Vertical and Horizontal) are properly seated and aligned, fully enclosing the Square Edge boards and the metal frame. At this stage, the assembly should be secure, with no visible gaps or misalignment.

Two sets of diagrams illustrate the insertion of vertical U-posts (B) on the sides and horizontal U-posts (A) at the top and bottom of the gate frame. Arrows indicate the direction of insertion.

4. Secure the Gate

Fasten the gate by securing cutting screws through the pre-drilled holes on the horizontal and vertical U-Posts (B) into the metal frame. This process requires 10 pre-drilled holes (pre-drilled at factory) and 10 screws (F) for a secure and stable assembly.

4.1 Verify Alignment

Check the alignment of the composite U-Posts (B) with the metal frame. Ensure that the factory pre-drilled holes on the U-Posts (B) remain perfectly aligned with the metal frame beneath.

4.2 Pre-Drill Holes into the Metal Frame

Using a power drill and a 17/64-inch drill bit, pre-drill 10 holes into the metal frame at each location, using the factory pre-drilled holes in the U-Posts as a guide. Drill carefully through the composite U-Posts and into the metal frame to maintain accurate alignment. Keep the drill perpendicular to the surface to avoid misaligned holes and ensure a precise fit for the screws.

Diagrams show the placement of screws (F) connecting the U-posts to the metal frame.

4.3 Insert Cutting Screws

Once pre-drilling is complete, insert the cutting screws (F) into each pre-drilled hole on the composite U-Posts (B). Use a power drill to drive the screws securely into the metal frame. DO NOT OVER-TIGHTEN.

4.4 Check Stability

After securing all 10 screws, verify the gate's stability. Ensure that all screws are tightened and that the U-Posts are firmly and uniformly attached to the metal frame.

Why should I not over-tighten my screws?

Our screws are self-tapping, and over-tightening can strip the screw (cut into the metal) and potentially lead to failure.

5. Top Cap Installation

  1. Slide the Modern Sliding Top Cap (D) into the Top Cap Routed space on the top of the Horizontal U-Channel Post (A).
  2. Fix into position using one 1 3/4 Torx composite screw (E) and a drill.
  3. Repeat for all Vertical U-Channel Posts (B).

A diagram illustrates the top cap (D) being attached with a screw (E) to the horizontal U-channel post (A).

Part B: Hanging the Modern Gate

Premium Hardware for Optimal Performance

NC gates are crafted for durability, with the gate weighing approximately 48 pounds. Proper installation is essential to ensure smooth functionality and longevity in your chosen location.

Hinge Installation Note

The NC Gate requires the hinges to be secured into the gate through the composite material and into the metal frame to properly support the gate's weight and ensure optimal functionality.

Hinges position should be installed 2.5 inches from the top and bottom of the U-Post.

Pre-Drill for the Gate Side:

Pre-drill holes using a 5/32" drill bit for the hinge screws. On the gate, the hinge screws must penetrate the composite U-Post and the metal frame. Ensure proper alignment so the screws securely fasten into the metal frame; 4 of the 6 screws on the gate side will anchor into the metal frame for stability.

Pre-Drill for the Post Side:

If using an NC 5x5 Commercial Post, pre-drill the holes using the same 5/32" drill bit. Insert a 4x4 post insert inside the 5x5 post for additional reinforcement. Ensure the hinge screws penetrate both the 5x5 post and the 4x4 post insert for a secure connection.

D&D Manuals

NC has partnered with D&D Technologies, the premier gate hardware manufacturer. Every NC gate kit includes a pair of D&D hinges and a latch, selected specifically to support the weight and design of our gates. This premium hardware is engineered to deliver optimal operation, ensuring that your gate functions smoothly and securely over time.

For further installation instructions, please refer to the provided link for the specific D&D hinge and latch model included in the gate kit (www.us.ddtech.com). Please note D&D recommends a different positioning; use NC recommendation (see image above).

Note: For the hinge screws, the pre-drilled hole needs to go through the composite material and penetrate through the internal metal frame.

STOP! Have you attached all screws to the hinges?

Your D&D kit package comes with 12 screws. Once you pre-drill your holes (see instructions left), you must attach all 12 screws, including inserting two screws into the leg side of each hinge to penetrate the internal steel frame. If you do not do this, your gate will sag.

Download Hinge, SKU# TCHDMA1S3BT: https://us.ddtech.com/products/truclose-multi-adjust-heavy-duty-series-3?variant=43821580943517

Download Latch, part # 210001, installation guide: https://us.ddtech.com/products/wood-hardware-regular-gravity-latch

A diagram shows the recommended hinge placement on the U-post, indicating a distance of 2.5 inches from the top and bottom.

Gate Opening Requirements & Support

Gate Opening Requirements

To properly accommodate the NC gate width and required hardware spacing, the opening between posts should measure 48 inches. This allows for the 45.5-inch-wide gate plus 1.25-inch clearance on each side, as needed for the D&D hinges. To add a gate, you must use two NC 5x5 Commercial Posts; standard posts will not support the weight. Since the gate is 48" wide, and each 5x5 post is 5.5" wide, space them 58" apart (outside to outside). This ensures proper hinge and latch function.

FAQ: Can I make a double gate with this model?

No! Our gates are too heavy to be made into double gates and must be supported by two 5x5 NC commercial grade posts with a 4x4 pressure treated lumber insert in order to hang the gate. For a custom solution, please call the provided number.

Proper Support for Your Gate

For optimal performance and durability, it's important to understand that our full-size NC gate weighs approximately 48 pounds. Due to this weight, it needs robust support to ensure smooth operation and prevent sagging over time.

NC offers a 5x5 Commercial Grade Composite Post that matches the gate's color and material, offering a cohesive, seamless look.

  • NC 5x5 Commercial post dimension: Outside dimensions 5x5 inches; Inside dimensions 3.87 inches (3 7/8").
  • The NC 5X5 NC post, when used as support for a full-size gate, should be reinforced by inserting a 4x4 treated wood post inside the composite post. This added reinforcement greatly increases the strength and durability of the post.
  • Commercial 4x4 treated wood post dimension is 3.5 X 3.5". This lumber post will fit inside our 5X5 NC Commercial post.

A diagram shows the post plumb and indicates post dimensions.

A diagram illustrates the gate opening requirements, showing the 48-inch gate width and the necessary post spacing. It also shows the dimensions of the 5x5 post and the 4x4 internal post.

Part C: Installing Gate with NC Modern Fence System

1. Screw the U-Channel Fence Post to the 5x5 Post

Attach the NC U-Channel fence post to the 5x5 heavy duty post—don't forget the 4x4 pressure treated post within for extra strength!

Diagrams depict the attachment of the U-channel fence post to the 5x5 post, including the 4x4 pressure treated post inside.

2. Bury the Posts Together into the Ground

Assembled posts should be buried together in the ground.

A diagram shows the assembled posts being buried.

Note: Make sure these are tightly screwed (white line shown to differentiate products).

Models: 100323XX30400, 300722XX0405, 300722XX0263, 300341XX042, 200721BK00000, AC90087A896, AC GATE UPPER FRAME, METAL_GATE_FRAME EXT_2RR, TCHDMA1S3BT, 210001, 200723XX015, 100323XX30400 Two Board Ranch Rail Gate, 100323XX30400, Two Board Ranch Rail Gate, Ranch Rail Gate, Rail Gate, Gate

File Info : application/pdf, 10 Pages, 6.87MB

PDF preview unavailable. Download the PDF instead.

Two Board RanchRail Gate

References

macOS Version 14.3 (Build 23D2057) Quartz PDFContext Pages

Related Documents

Preview Natures Composites Three-Board Ranch Rail Gate Installation Guide
A comprehensive installation guide for the Natures Composites Three-Board Ranch Rail Gate, detailing assembly steps, required tools, hardware, and post installation for traditional and modern ranch rail fence designs.
Preview Natures Composites Three-Board Ranch Rail Gate Installation Guide
Detailed installation guide for the Natures Composites Three-Board Ranch Rail Gate. Covers assembly, post installation, hardware, and important considerations for a secure and durable outdoor gate.
Preview Natures Composites Two Board Ranch Rail Gate Installation Guide
A comprehensive guide for installing the Natures Composites Two Board Ranch Rail Gate. This document details components, required tools, step-by-step assembly instructions, mounting options, and important considerations for a successful installation.
Preview Natures Composites Modern Semi-Privacy Horizontal Perimeter Gate Installation Guide
Comprehensive installation guide for the Natures Composites Modern Semi-Privacy Horizontal Perimeter Gate, covering component identification, assembly, hardware installation, post setup, and important considerations for a durable and functional outdoor gate.
Preview Natures Composites Modern Horizontal Privacy Full Size Gate Installation Guide
Comprehensive installation guide for the Natures Composites Modern Horizontal Privacy Full Size Gate, covering components, assembly steps, hardware, and post installation. Learn how to properly install your gate for optimal performance and longevity.
Preview Natures Composites Modern Horizontal Semi-Privacy Full Size Gate Installation Guide
A comprehensive installation guide for the Natures Composites Modern Horizontal Semi-Privacy Full Size Gate. This guide provides step-by-step instructions for assembly, hardware installation, and post setup, ensuring a durable and functional gate. Learn about required tools, pre-installation checks, and best practices for a successful installation.
Preview Natures Composites Modern Horizontal Privacy Perimeter Gate Installation Guide
Comprehensive installation guide for the Natures Composites Modern Horizontal Privacy Perimeter Gate, covering assembly, hardware, and post installation. Learn how to properly install your gate for optimal performance and durability.
Preview Natures Composites Modern Horizontal Privacy Full Size Gate Installation Guide
Comprehensive installation guide for the Natures Composites Modern Horizontal Privacy Full Size Gate, covering assembly, hardware, and post installation. Includes detailed steps, tips, and safety information.