Uline Pure Flow 1000® Eyewash Station
Models: H-1297, S-11507
Contact: 1-800-295-5510 | uline.com
General Information
The H-1297 shipping carton should contain:
- Eye Wash Station
- Emergency Sign
- Hanging Bracket
Before installing S-11507 Pure Flow 1000® Saline Cartridges, inspect the product for damage.
NOTE: S-11507 Pure Flow 1000® Saline Cartridges are sold separately.
Cartridge Installation
NOTE: This eyewash station requires two saline cartridges to be installed at the same time.
- Close the drain spigot by turning the handle to the rear. (See Figure 1)
- Remove the cover by lifting it up. (See Figure 2A) Open the activating door. (See Figure 2B)
- Raise the reservoir to the "Up" position, latch onto the housing by pressing back on the latching tabs. (See Figure 3)
- Place two S-11507 Pure Flow 1000® Saline Cartridges on the shelf. Nozzle assembly must be in front. (See Figure 4)
- Pull green latch tabs forward to drop down the reservoir, ensuring that plates are seated on bags and are not resting on the cartridge boxes. (See Figure 5)
- Replace the cover. (See Figure 6)
- Remove rubber bands from the activating strap and nozzle. Extend activating straps to the side. Do not pull on the straps. (See Figure 7)
- Snap the right-hand nozzle into place on the white nozzle plate. An audible 'click' will be heard to confirm that the nozzle is engaged. (See Figure 8)
- Snap the left-hand nozzle into place on the white nozzle plate. An audible 'click' will be heard to confirm that the nozzle is engaged. (See Figure 9)
- Position the two black straps over the top of the activation door with the expiration date and batch number visible. Do not twist or cross straps. Close the activation door. (See Figure 10)
- Position the activating straps over the door and down the raised area on either side of the door handle so the straps cover the labels on the activation door. (See Figure 11)
- Push the plastic fastener into the hole in the door until the flange is seated against the door. (See Figure 11)
- Push the center pin of the fastener until it snaps into place flush with the fastener head. (See Figure 11)
- Position the tamper seal on the middle right-hand side of the door. Half the seal must be on the door and the other half on the unit surface. (See Figure 12)
- Attach the lock or inspection tag through the tab on the cover. (See Figure 12)
Figure 1: Drain Spigot Operation
Diagram shows a drain spigot with a handle. The handle can be turned to the rear to close the spigot. Two positions are shown: Open and Closed.
Figure 2A & 2B: Cover and Activating Door
Figure 2A shows a cover being lifted up. Figure 2B shows the activating door being opened, with arrows indicating the direction of movement.
Figure 3: Reservoir Latching
Diagram shows the reservoir being raised to the 'Up' position and latched onto the housing by pressing back on the latching tabs.
Figure 4: Cartridge Placement
Diagram shows two saline cartridges being placed on a shelf with the nozzle assembly facing forward.
Figure 5: Reservoir Drop-Down
Diagram shows green latch tabs being pulled forward to drop the reservoir. It emphasizes ensuring plates are seated on bags and not resting on cartridge boxes.
Figure 6: Cover Replacement
Diagram shows the cover being placed back onto the unit.
Figure 7: Strap and Nozzle Preparation
Diagram shows rubber bands being removed from the activating strap and nozzle, and the activating straps being extended to the side.
Figure 8: Right Nozzle Engagement
Diagram shows the right-hand nozzle being snapped into place on the white nozzle plate. An audible click confirms engagement.
Figure 9: Left Nozzle Engagement
Diagram shows the left-hand nozzle being snapped into place on the white nozzle plate. An audible click confirms engagement.
Figure 10: Strap Positioning
Diagram shows the two black straps positioned over the activation door, ensuring the expiration date and batch number are visible. The straps should not be twisted or crossed.
Figure 11: Fastener Installation
Diagram shows the activating straps positioned over the door and down the sides of the handle to cover labels. A plastic fastener is pushed into the door, and its center pin is pushed to secure it flush with the head.
Figure 12: Seal and Tag Attachment
Diagram shows a tamper seal being positioned on the right side of the door, covering both the door and the unit surface. An inspection tag or lock is attached through a tab on the cover.