SolaX EV-Charger 7.2 kW-22 kW Quick Installation Guide
Packing List
- EV-Charger *1
- EV-Charger User Manual 7.2 kW - 22 kW
- Manual *1
- Expansion bolt *3/5 (3 for type S, 5 for type P)
- Self tapping screw *3/5 (3 for type S, 5 for type P)
- Gasket *3/5 (3 for type S, 5 for type P)
- Quick Installation Guide *1
- European terminal *3/5 (3 for single-phase; 5 for three-phase)
- RJ 45 terminal adapter *1
- RFID Card *2
- CT (single-phase) *1
- CT (three-phase) *1
- Cable hook *1 (only for type P)
Installation Steps
- Remove the screw from the EV-Charger with the cross screwdriver. Then remove the back bracket carefully.
- Fix the back bracket and the cable hook (only for type P) to the wall.
- Mark the position of the holes.
- Drill holes with a ⌀ 8 drill.
- Depth: at least 45 mm.
- Insert the expansion bolts.
- Align the bracket and the cable hook (only for type P) with the holes, and screw the self-tapping screws with the cross screwdriver. (Torque: 1.5~2 N·m)
- Hang the EV-Charger on the wall for trial, then estimate the required length of input cable (three-core for single-phase, five-core for three-phase, outer diameter: 12.5-18 mm) and communication cable. After that, take the EV-Charger down.
- Unscrew the EV-Charger's rear cover with the cross screwdriver and take it down. Then undo the fastening heads and take the waterproof materials away.
- Unscrew the countersunk screw of the base plate of the communication board with the cross screwdriver. Then pull the base plate of the communication board out.
- Insert the prepared communication cable through the waterproof connector in sequence. If the cable is self-made, insert the wires into the RJ45 terminals and then use crimping pliers to press them tightly.
- Strip the outer sheath of the input cable for a length of 60-70 mm, ensuring all wires reach the terminal blocks with a little excess length. Strip approximately 12 mm of insulation from the end of all colored wires. Crimp the European terminal with the wire crimper.
- Insert the input cable through the waterproof connector in sequence.
- Insert the wires into the appropriate holes of the terminal blocks, then secure the terminals with a straight screwdriver.
- Press the spring upward and push the base plate of the communication board in. Then screw the countersunk screw.
- Push the rear cover to the appropriate position of the cables and screw the self-tapping screws with the cross screwdriver. Then tighten the waterproof fastening head. (Torque: 2~2.5 N·m)
- Hang the EV-Charger up carefully and steady the EV-Charger with the self-tapping screw and the cross screwdriver. For type P, connect the charging connector with the EV-Charger and hang the connecting cable on the hook. (Torque: 2~2.5 N·m)
CT & WiFi Connection
CT Connection
Diagram: A diagram shows a PV array connected to an inverter, which connects to an AC distribution box. From the AC distribution box, a CT is connected to an electricity meter and then to the EV-Charger. Another line from the AC distribution box goes to 'other home Load'. A close-up of the CT shows an arrow indicating it must point towards the public grid. The CT is placed on the L line, with the public grid electricity on the other side. Notes indicate not to place the CT on the N or PE wire, on non-insulated wires, or on both N and L wires simultaneously. For three-phase CTs, clip them on the corresponding phases.
WiFi Connection
- Use your smartphone to scan the QR code or search for "SolaXCloud" in a browser to download the Monitoring App.
- Create a new account on the Monitoring App.
- Login and navigate to the Account page in the app. Click "Wi-Fi Connection" and follow the instructions to complete the process.