Vollrath Installation Instructions

One Piece Cafeteria Breath Guard & Three Piece Cafeteria Breath Guard

These instructions cover the installation of the one piece Cafeteria Breath Guard and the three piece Cafeteria Breath Guard.

One Piece Breath Guard Installation

Some units are shipped with a breath guard not installed. To install the breath guard follow these steps:

? NOTE: Use caution when tightening the cap nuts. Overtightening may cause the plastic to crack.

  1. Install the breath guard uprights (labeled A) to the studs (labeled B) securing with cap nuts (labeled C) as shown. See Figure 1. Repeat for all four uprights.
  2. Install the breath guard support tube (labeled D) between the uprights (labeled A) securing with cap nuts (labeled C) as shown. Repeat on the other side.
  3. Install the one piece breath guard (labeled E) securing with screws (labeled F) and cap nuts (labeled C) as shown. Repeat for all four mounting locations.
  4. Install the side breath protector (labeled G) to the support tube (labeled D) securing with cap nuts (labeled C) as shown. Repeat on the other side.

Figure 1. One Piece Breath Guard Installation Description

This diagram shows the assembly of the one-piece breath guard. It illustrates how upright supports (labeled A) are attached to base studs (labeled B) using cap nuts (labeled C). A horizontal support tube (labeled D) connects the two upright supports. A side protector (labeled G) is then secured to this support tube. The diagram indicates that these steps should be repeated for all mounting locations.

Three Piece Breath Guard Installation

Some units are shipped with a breath guard not installed. To install the breath guard follow these steps:

? NOTE: Use caution when tightening the cap nuts. Overtightening may cause the plastic to crack.

  1. Install the breath guard uprights (labeled A) to the studs (labeled B) securing with cap nuts (labeled C) as shown. See Figures 1 and 2. Repeat for all four uprights.
  2. Install the breath guard support tube (labeled D) between the uprights (labeled A) securing with cap nuts (labeled C) as shown. Repeat on the other side.
  3. Install the side breath guards (labeled E) securing with screws (labeled F) and cap nuts (labeled C) as shown. Repeat for all mounting locations.
  4. Install the side shield (labeled G) to the support tube (labeled D) securing with cap nuts (labeled C) as shown. Repeat on the other side.
  5. Install the support bar and stud assembly (labeled H) to the side breath guards (labeled E). Repeat for all mounting locations.
  6. Install the top breath guard (labeled I) to the support bar and stud assembly (labeled H) securing with cap nuts (labeled C). Repeat for all mounting locations.

Figure 2. Three Piece Breath Guard Installation Description

This diagram illustrates the assembly of the three-piece breath guard. It shows upright supports (labeled A) attaching to base studs (labeled B) with cap nuts (labeled C). A horizontal support tube (labeled D) connects the upright supports. Side breath guards (labeled E) are attached to the uprights using screws (labeled F) and cap nuts (labeled C). A side shield (labeled G) is then secured to the support tube (D). A support bar and stud assembly (labeled H) is attached to the side breath guards (E). Finally, the top breath guard (labeled I) is attached to the support bar and stud assembly (H) using cap nuts (labeled C). The diagram indicates that these steps should be repeated for all mounting locations.

Product Information

Item No.: 2350030-01

Revision: 04/12

Manufacturer: The Vollrath Company, L.L.C.

Address: 1236 North 18th Street, Sheboygan, WI 53081-3201, U.S.A.

Main Tel: 800.628.0830

Service Tel: 800.628.0832

FAX: 800.752.5620

Vollrath of Canada, Co. Tel: 800.695.8560, FAX: 800.752.5620

Website: www.vollrathco.com

© 2010 The Vollrath Company, L.L.C.

Models: T38946 Cafeteria Breath Guard, T38946, Cafeteria Breath Guard, Breath Guard, Guard

File Info : application/pdf, 2 Pages, 788.18KB

PDF preview unavailable. Download the PDF instead.

VOL-T38946 im ?v=1709587309865

References

Adobe InDesign CS4 (6.0.6) Adobe PDF Library 9.0

Related Documents

Preview Vollrath Installation Instructions: Cafeteria Breath Guards
Detailed installation instructions for Vollrath One Piece and Three Piece Cafeteria Breath Guards, including part identification and assembly steps for commercial food service environments.
Preview Vollrath Cafeteria Breath Guard Installation Guide
Comprehensive installation instructions for Vollrath one-piece and three-piece cafeteria breath guards, detailing assembly steps and component identification.
Preview Vollrath Cafeteria Breath Guard Installation Instructions
Step-by-step installation guide for Vollrath One Piece and Three Piece Cafeteria Breath Guards, covering assembly of uprights, support tubes, guards, and shields using provided hardware.
Preview Vollrath Cafeteria Breath Guard Installation Instructions
Step-by-step installation guide for Vollrath One Piece and Three Piece Cafeteria Breath Guards. Includes parts identification, assembly procedures, and safety notes.
Preview Vollrath Cafeteria Breath Guard Installation Instructions
Detailed installation guide for Vollrath One Piece and Three Piece Cafeteria Breath Guards, including part identification and step-by-step assembly instructions.
Preview Vollrath Cafeteria Breath Guard Installation Guide
Step-by-step installation instructions for Vollrath One Piece and Three Piece Cafeteria Breath Guards, including part identification and assembly details.
Preview Vollrath Cafeteria Breath Guard Installation Instructions
Official installation guide from Vollrath detailing the setup process for both the one-piece and three-piece cafeteria breath guards. Includes important notes on assembly and part identification.
Preview Vollrath Cafeteria Breath Guard Installation Instructions
Step-by-step installation guide for Vollrath one-piece and three-piece cafeteria breath guards, including parts identification and assembly procedures.