Description
The mains pressure indoor outdoor ReadyFit enamel 135/180 litre cylinders are designed for high volume specification jobs, such as terraced houses and apartments, significantly reducing installation time for hot water systems. All cylinders undergo rigorous leak testing before shipment, providing plumbers with confidence during commissioning. The ReadyFit cylinders are supplied with all valves and auxiliary pipework fitted and are available in two capacities with two element options.
Specifications
Codes | Capacity | Element size |
---|---|---|
ME135488E20R | 135 L | 2 kW |
ME135488E30R | 135 L | 3 kW |
ME180488E20R | 180 L | 2 kW |
ME180488E30R | 180 L | 3 kW |
Important Notes
- [Important] DO NOT handle or use the pipework to move the cylinder into place. Any damage caused by handling is not covered by warranty.
- [Important] This guide must be used in conjunction with the Mains Pressure Indoor Outdoor enamel owner and installer guide, which is supplied with the unit.
Included Components
The cylinder package includes:
- 1. 850 kPa TPR valve
- 2. Insulated hot water tee with optional untempered hot water outlet
- 3. Insulated 20 mm NZS3501 copper pipe
- 4. 20 mm (AVG TVA20C-I) tempering valve with insulation*—this valve can be rotated left or right to suit outlet requirements
- 5. 700 kPa (Apex EVT700) cold water expansion valve
- 6. Allproof 40 mm tundish*
- 7. ABS teardrop drip tray (CODTP520)
* Items marked with an asterisk are part of the component pack and need to be fitted by the installer.
Please note: An inlet non-return valve is supplied but not installed. The plumber must determine its suitable installation position.
Does not include: Isolating valve, seismic restraints, or mounting plinth (a mounting plinth is available as an accessory, code: R1000).
Dimensions and Connections
Cold inlet / hot outlet connections are DN20 (¾ “ BSP) and suitable for NZS3501 copper pipework.
Product Dimensions:
- 135 L Cylinder Height: 1417 mm
- 180 L Cylinder Height: 1812 mm
- Width (B): 565 mm
- Recommended Minimum Cupboard Opening (C): 600 mm
Key Connection Points Illustrated:
- Hot water outlet
- Cold water inlet
- 40 mm tundish connection
Clearance Requirements:
- A minimum clearance of 190 mm is recommended for the trap if installed on a plinth.
- The tundish should be located on the floor (A).
Note on Drainage: Drain from the safe tray must comply with AS/NZS 3500.4 or G12/AS1 standards.
ReadyFit Guarantee
Rinnai ReadyFit cylinders undergo rigorous leak testing before dispatch to ensure the delivery of a high-quality product. For comprehensive warranty information, please refer to the separate Mains Pressure Indoor Outdoor Cylinder Limited Warranty document. The ReadyFit warranty covers faults in parts and pipework provided by Rinnai for a duration of one year following installation. Damage resulting from mishandling during the installation process is not covered by warranty.