Parts List
- Part 1: Front blind assembly
- Part 2: Left guide rail
- Part 3: Right guide rail
- Part 4: Bracket (4x)
- Part 5: Bracket (4x)
- Part 6: Screw (2x)
- Part 7: Bracket (6x)
- Part 8: Screw (14x)
Installation Instructions
Step 1: Prepare Sun Visors
The initial step involves preparing the vehicle's sun visors. The diagram shows attaching components to the sun visors.
Step 2: Install Main Blind Assembly
Position the main blind assembly (Part 1) against the windshield. Secure it using brackets (Parts 4 and 5) and screws (Part 6). The diagrams indicate specific placement points and measurements, such as 234 mm and 144 mm, for correct alignment.
Step 3: Drill Pilot Holes
⚙️ Use a drill bit of Ø2.5 mm to create pilot holes on the vehicle's A-pillars for mounting the guide rails. Follow the indicated positions [Step 1 arrow] and direction [Step 2 arrow].
Step 4: Mount Guide Rails
Mount the left guide rail (Part 2) and right guide rail (Part 3) onto the vehicle's A-pillars. Secure them using screws (Part 8). The diagrams show that 6 screws (from Part 8) and associated brackets (Part 7) are used for each guide rail.
Step 5: Insert Blind into Rails
Carefully insert the front blind assembly into the mounted guide rails. The diagram shows the insertion process with a detailed view of the mechanism [Step 1 arrow] followed by the insertion and rotation [Step 2 arrow].
Step 6: Final Operation
Pull the blind upwards to its final operating position. The diagram shows the final action [Step 1 arrow] and completion [Step 2 arrow].
Company Information
A complete list of Dometic companies, which comprise the Dometic Group, can be found in the public filings of:
DOMETIC GROUP AB
Hemvärnsgatan 15
SE-17154 Solna
Sweden
Find your local dealer: dometic.com/dealer
Find your local support: dometic.com/contact
Find your local sales office: dometic.com/sales-offices
[Recycling Icon] [Document Icon] [Disposal Icon]