Raychem RayClic Connection System

Installation Instructions

Product Description

The Raychem RayClic Connection System offers Power Connection, Powered Splice, and Powered Tee kits designed for use with Raychem IceStop, XL-Trace Edge, and HWAT heating cables. These kits are intended for strapping to pipes or mounting on walls at the start of a heating cable circuit. For detailed information, consult the relevant system installation and operation manuals.

Available Kits:

Tools Required:

Additional UL Listed or CSA Certified Materials Required:

Optional Accessories (Not Included):

Approvals

Pipe Heating Systems 718K

De-icing and Snow Melting Equipment 877Z

For Use in Hazardous Locations: Class I Div. 2 Group A, B, C, D T6 when installed with GM-1XT and GM-2XT only. Operating temperature range: -40°C to +40°C.

Certifications include UL and CSA listings.

Important Warnings

Avertissement (French):

Kit Contents

RayClic-PC Power Connection Kit

Item Qty Description
A 1 Power connection
B 1 Pipe mounting bracket
C 2 Plastic cable ties
D 1 Clip
E 1 End seal
F 4 Labels (1 HWAT, 1 De-Icing & Snow Melting, 2 Warning)
G 1 Cable lubricant (for use with HWAT cables only)

RayClic-PS Powered Splice Kit

Item Qty Description
A 1 Powered splice
B 1 Pipe mounting bracket
C 2 Plastic cable ties
D 2 Clips
E 2 End seals
F 4 Labels (1 HWAT, 1 De-Icing & Snow Melting, 2 Warning)
G 1 Cable lubricant (for use with HWAT cables only)

RayClic-PT Powered Tee Kit

Item Qty Description
A 1 Powered splice
B 1 Pipe mounting bracket
C 2 Plastic cable ties
D 3 Clips
E 3 End seals
F 4 Labels (1 HWAT, 1 De-Icing & Snow Melting, 2 Warning)
G 1 Cable lubricant (for use with HWAT cables only)

Power Connection, Splice and Tee Installation

  1. Attach Bracket: Using plastic cable ties, attach the mounting bracket to the pipe. For roof-mounted applications, follow steps 3-9 (pages 4-6) and then refer to "Roof Installation" on page 7.
  2. Connect RayClic-PC: Fold up the four outer snaps on the bracket, position the connector over the snaps, and press down.
  3. Connect RayClic-PS/PT: Fold up the two center snaps on the bracket, position the connector over the snaps, and press down.
  4. Prepare Heating Cable: Allow sufficient extra heating cable for service loops. Ensure the end of the heating cable is cut cleanly.
  5. Score Outer Jacket: Score around and down the outer jacket of the heating cable 3/8 inches from the end. Do not cut through the metal braid or inner jacket.
  6. Remove Outer Jacket: Remove the outer jacket.
  7. Place Metal Clip: Place the metal clip over the base of the exposed braid.
  8. HWAT Only - Cut Braid: Using wire cutters, cut away 1 inch of the braid.
  9. HWAT Only - Pull Braid Back: Pull the exposed braid back over the metal clip.
  10. HWAT Only - Cut Aluminum Wrap: Using wire cutters, cut away the aluminum wrap close to the braid and outer jacket.
  11. IceStop, XL-Trace Edge, and RaySol: Pull exposed braid back over the metal clip.
  12. Apply Lubricant: Apply a small amount of lubricant to the jacket surface near the braid. Do not apply lubricant within 2 inches of the cable end. (Excessive lubricant may cause low insulation resistance or short circuits).
  13. Insert Connector: Insert the prepared heating cable end into the connector. Push until fully inserted and the end is visible through the opening in the connection cover plate.
  14. Secure Connector: Securely tighten the two connection screws, alternating as they are tightened, until the metal top surface is level with the inner clear plastic module.
  15. Close Lid: Close the lid and snap the lever shut. Do not force the lid. If it does not close, check that all screws are fully tightened.
  16. Tighten Grommets: Tighten the nuts on the heating cable entries until the grommets are compressed.
  17. Conduit Attachment (Power Connection): Using two wrenches, attach user-supplied 1/2 inch conduit. Do not exceed 15 ft-lbs of torque to avoid breaking the housing.
  18. Final Steps (All Kits): Apply insulation, cladding, and warning labels. Terminate power wiring in a user-supplied junction box.

Note: RayClic connection kits are designed for single installation; the heating cable cannot be removed once installed.

Roof Installation

  1. Mount Bracket: Mount the RayClic-SB-02 wall-mounting bracket flat using screws through the center holes. Do not mount in a gutter or where it may be immersed in water.
  2. Position Clips: Position attachment clips on the mounting bracket based on the type of connector being installed (RayClic-PC, RayClic-PS, or RayClic-PT).
  3. Connect Heating Cable: Connect the heating cable as detailed in steps 3 through 9 (pages 4-6).
  4. Attach Connector to Bracket: Attach the connector to the mounting bracket by pressing until it snaps into place.
  5. Install Drip Loop: Complete heating cable installation and install a drip loop as shown. Protect the heating cable from sharp edges.
  6. Power Connection (Roof): Connect user-supplied 1/2 inch conduit following step 11A on page 6. Apply the Electric De-Icing and Snow Melting label on or near the junction box.

End Seal Installation

  1. Prepare Cable End: Score down and around the outer jacket 1 inch from the end. Remove the outer jacket, being careful not to damage the inner jacket.
  2. HWAT - Remove Aluminum Wrap: Using wire cutters, cut away aluminum wrap close to the braid and outer jacket.
  3. Remove Exposed Braid: Remove the exposed braid.
  4. Install End Seal: Push the end seal completely onto the heating cable.

Note: The end seal can only be installed once and cannot be removed from the heating cable. Do not use until ready for final installation.

Troubleshooting Guide

Problem Solution
Braid clips are missing. Braid clips are attached to the cardboard packing insert under the lid. Use them for a ground connection. Contact Chemelex at (800) 545-6258 if missing or lost.
Mounting bracket is missing. A pipe mounting bracket is supplied with the kits. A wall mounting bracket or additional pipe mounting bracket can be ordered separately. Refer to "Optional Accessories" for catalog numbers.
Connector does not snap onto bracket. For Power Connection kits, fold up the four outer clips. For Powered Splice and Powered Tee kits, fold up only the center clips.
Heating cable type not mentioned. Raychem RayClic connection kits are approved for use only with HWAT, XL-Trace Edge, and IceStop heating cables. Do not use with other types.
Braid clip does not fit. Ensure the clip is installed on the metal braid, not the outer jacket.
Heating cable does not have aluminum wrap. Only HWAT heating cables have aluminum wrap under the braid. Skip the aluminum wrap removal step for XL-Trace Edge and IceStop heating cables.
Heating cable cannot be inserted into connector.
  • Apply cable lubricant to the heating cable primary (white) jacket.
  • Ensure outer jacket strip length is 3½ inches.
  • Verify braid clip installation (on top of metal braid, not outer jacket).
  • Ensure braid is pulled back over the braid clip.
  • For HWAT, ensure 1 inch of braid is removed.
  • Check that the sealing nut is not loose (but not removed).
  • Ensure connection screws are loose.
Lid does not close. Ensure all screws are fully tightened before closing the lid.
Heating cable cannot be inserted into end seal. The outer jacket must be removed from the heating cable before installing the end seal (see "End Seal Installation" on page 8). Ensure 1 inch of the outer jacket, braid, and aluminum wrap (HWAT only) are removed.
Heating cable cannot be removed. The power connection and end seal are designed for single installation. The heating cable cannot be removed once installed. Additional Raychem RayClic-E end seals can be ordered from Chemelex.

Heating Cable Circuit Testing

The RayClic Power Connection Kits (RayClic-PC, RayClic-PS, and RayClic-PT) include test ports in the blank module for confirming continuity or power to the heating cable circuit.

Instructions:

  1. Open the RayClic Cover.
  2. Set multimeter to AC voltage function.
  3. Insert multimeter test probes into the two test ports.

WARNING: To avoid shock, do not cross the test probes or touch them to the metal pressure plate when measuring voltage.

AVERTISSEMENT : Pour éviter les chocs, ne pas chevaucher les sondes d'essai et ne pas toucher au plateau de pression métallique pour mesurer la tension.

Models: RayClic-PC, RayClic-PS, RayClic-PT, RayClic Connection System, Connection System, System

File Info : application/pdf, 12 Pages, 3.17MB

PDF preview unavailable. Download the PDF instead.

RAYCHEM-IM-H55092-RayClicConnectionSystem-EN ?srsltid=AfmBOorn0iAeHwCLnCIVKAZ0xHLY0HNIyC5dAon0cCwJ2-2D78pNfwca

References

Adobe PDF Library 17.0 Adobe InDesign 20.3 (Windows)

Related Documents

Preview Raychem RayClic Connection System Installation Instructions
Comprehensive installation instructions for the Raychem RayClic Connection System, including Splice, Tee, and Cross kits. Covers preparation, installation steps, roof mounting, end seal application, and troubleshooting for various Raychem heating cables like IceStop, XL-Trace Edge, and HWAT.
Preview Raychem GM-2X-KIT: Installation Guide for Gutter and Downpipe Frost Protection
Installation instructions and technical data for the Raychem GM-2X self-regulating heating cable kit, designed for frost protection of gutters and downpipes. Includes kit contents, installation steps, and specifications.
Preview Raychem Commercial Heat Tracing Solutions: Products and Services
Explore Raychem's comprehensive range of commercial heat tracing solutions for safety, comfort, and performance. This document details products and services for pipe freeze protection, roof and gutter de-icing, surface snow melting, freezer frost heave prevention, heat loss replacement, and hot water temperature maintenance, along with control and monitoring systems.
Preview Raychem H908 Plug-in Power Connection Kit with End Seal Installation Instructions
This document provides comprehensive installation instructions for the Raychem H908 Plug-in Power Connection Kit, designed for use with Raychem WinterGard heating cables (H311, H611, H612). It covers applications for pipe freeze protection and roof/gutter de-icing. The guide details kit contents, required tools, step-by-step installation procedures, electrical protection guidelines, testing, maintenance, and warranty information.
Preview Raychem HWAT-ECO V5 Installation, Operation, and Maintenance Manual
Comprehensive guide for the Raychem HWAT-ECO V5, covering installation, operation, and maintenance. Learn about its features for hot water temperature maintenance, energy savings, and system integration.
Preview Raychem IceStop System: Installation and Operation Manual for Roof and Gutter De-Icing
This comprehensive manual provides detailed instructions for the installation and operation of the Raychem IceStop system, designed for roof and gutter de-icing. It covers safety guidelines, application details, component descriptions, and maintenance procedures to ensure optimal performance and prevent hazards.
Preview Raychem E-100-LR-A and E-100-LR-E Light Replacement and Retrofit Kit Installation Instructions
Detailed installation instructions for the Raychem E-100-LR-A and E-100-LR-E light kits, designed for high-profile end seal applications. Covers both replacement and retrofit procedures for various Raychem heating cables.
Preview Raychem H900 WinterGard Power Connection Kit Installation Instructions
Comprehensive installation guide for the Raychem H900 WinterGard Power Connection Kit, detailing procedures for both pipe heating and roof/gutter de-icing applications. Includes safety warnings, tool requirements, kit contents, and electrical protection information.