Raychem RayClic Connection System

Installation Instructions

Description

The Raychem RayClic Connection System offers three types of kits:

These kits are designed for use with Raychem IceStop, XL-Trace Edge, and HWAT heating cables. The connection can be strapped to the pipe or wall-mounted. These installation instructions should be used in conjunction with the IceStop, XL-Trace Edge, and HWAT System Installation and Operation Manuals. For technical support, contact your Chemelex representative or call Chemelex at (800) 545.6258.

Approvals

Certifications: UL Listed

Tools Required

Optional Accessories (Not Included in This Kit)

Kit Contents

RayClic-S Splice Kit

ItemQtyDescription
A1Splice
B2Plastic cable ties
C2Clips
D3Labels (1 splice, 2 warning)
E1Cable lubricant (for use with HWAT cables only)

RayClic-T Tee Kit

ItemQtyDescription
A1Tee
B2Plastic cable ties
C3Clips
D1End seal
E3Labels (1 splice, 2 warning)
F1Cable lubricant (for use with HWAT cables only)

RayClic-X Cross Kit

ItemQtyDescription
A1Cross
B2Plastic cable ties
C4Clips
D2End seals
E3Labels (1 splice, 2 warning)
F1Cable lubricant (for use with HWAT cables only)

Splice, Tee, and Cross Installation

For pipe-mounted applications, follow steps 1 through 10 (pages 4-6).

For roof-mounted applications, follow steps 2 through 9 (pages 4-6), then turn to "Roof Installation" on page 7.

  1. Place kit on pipe and attach with plastic cable ties.
  2. Allow enough extra heating cable to make service loops as required. Make sure the end of the heating cable is cut clean.
  3. WARNING: Do not cut through metal braid or inner jacket.
  4. Remove the outer jacket. Place the metal clip over the base of the exposed braid.
  5. HWAT ONLY: Using wire cutters, cut away 1 inch of the braid. Pull exposed braid back over metal clip.
  6. HWAT ONLY: Using wire cutters, cut away aluminum wrap.
  7. ICESTOP AND XL-TRACE EDGE ONLY: Pull exposed braid back over metal clip.
  8. Insert prepared heating cable end into connector. Push until heating cable is fully inserted and end is visible through opening in connection cover plate. Note: Heating cable cannot be removed. The connection and end seal are designed to be installed only once; the heating cable cannot be removed once installed.
  9. Securely tighten the two connection screws, alternating as they are being tightened. WARNING: Fire hazard. Loose screws can cause excessive heating. Be sure screws are fully tightened.
  10. Close the lid and snap the lever shut. Do not force lid closed. If lid does not close, check the connection to ensure all screws are fully tightened. Tighten the nuts on the heating cable entries until grommets are compressed.
  11. Using glass cloth tape, attach heating cable to pipe. Apply insulation, cladding, warning labels and yellow splice identification label.

Roof Installation

  1. Mount flat (wall-mounting) bracket by installing screws through the center holes. Mount bracket above water line. Do not mount in gutter or where it may be immersed in water.
  2. Position attachment clips on mounting bracket based on the type of connector being installed.
  3. Prepare and attach heating cables as detailed in steps 2 through 9 (pages 4-6).
  4. SPLICE: Attach connector to mounting bracket by pressing until it snaps into place. Complete heating cable installation and install drip loops as shown. Protect heating cable from sharp edges.
  5. TEE: Attach connector to mounting bracket by pressing until it snaps into place. Complete heating cable installation and install drip loops as shown. Protect heating cable from sharp edges.

End Seal Installation

  1. Score down and around outer jacket 1 inch from the end. Remove the outer jacket. Do not cut or damage inner jacket.
  2. HWAT: Using wire cutters, cut away aluminum wrap close to braid and outer jacket.
  3. IceStop, XL-Trace Edge and RaySol: Remove exposed braid.
  4. Push end seal completely onto heating cable. Note: The end seal can be installed only once; it cannot be removed from the heating cable. Do not use until ready for final installation.

Heating Cable Circuit Testing

The RayClic-T now includes test ports in the blank module. Voltage can be measured at these points to confirm continuity or power to the installed heating cable circuit. For detail heating cable operation refer to the appropriate installation and operating manual.

Instructions:

  1. Open the RayClic cover.
  2. Set multimeter to AC voltage function.
  3. Insert multimeter test probes into the two test ports. WARNING: To avoid shock do not cross the test probes or touch them to the metal pressure plate when measuring voltage.

Troubleshooting Guide

ProblemSolution
Braid clips are missing.The braid clips are attached to the cardboard packing insert under the lid. The braid clips must be used to ensure a ground connection. If clips are missing or lost, call Chemelex at (800) 545-6258.
Mounting bracket is missing.A mounting bracket is not included in the splice, tee and cross kits. One can be ordered using one of the catalog numbers listed under "Optional Accessories" on the front page of these instructions when you place your order.
Connector does not snap onto bracket.The bracket has two sets of attachment clips. Fold up the four outer clips for the splice kit. Fold up only the center clips for the tee and cross kits.
Heating cable type not mentioned.Raychem RayClic connection kits are approved for use only with HWAT, XL-Trace Edge and IceStop heating cables. Do not use with other heating cables.
Braid clip does not fit.Be sure the clip is installed on the metal braid, not on the outer jacket.
Heating cable does not have aluminum wrap.Only HWAT heating cables have the aluminum wrap under the braid. Skip the aluminum wrap removal step for XL-Trace Edge and IceStop heating cables.
Heating cable cannot be inserted into connector.Check for the following:
  • Apply cable lubricant to the heating cable primary (white) jacket.
  • Outer jacket strip length is 3/8 inches.
  • Braid clip is installed on top of the metal braid, not on the outer jacket.
  • Braid is pulled back over braid clip.
  • For HWAT, 1 inch of braid is removed.
  • Sealing nut is loose (but not removed).
  • Connection screws are loose.
  • Be sure all screws are fully tightened before closing the lid.
Heating cable cannot be inserted into end seal.The outer jacket must be removed from the heating cable before the end seal is installed (see the "End Seal Installation" instructions on page 8). Make sure 1 inch of the outer jacket, braid, and aluminum wrap (HWAT only) are removed.
Heating cable cannot be removed.The connection and end seal are designed to be installed only once; the heating cable cannot be removed once installed. Additional Raychem RayClic-E end seals can be ordered from Chemelex.

Contact Information

North America: Tel +1 800 545 6258, info@chemelex.com

Latin America: Tel +1 713 868 4800, info@chemelex.com

Europe, Middle East, Africa, India: Tel +32 16 213 511, Fax +32 16 213 604, info@chemelex.com

Asia Pacific: Tel +86 21 2412 1688, infoAPAC@chemelex.com

©2025 Chemelex. All Chemelex marks and logos are owned or licensed by Chemelex Europe GmbH or its affiliates. All other trademarks are the property of their respective owners. Chemelex reserves the right to change specifications without notice.

RAYCHEM-IM-H55388-RayClicConnectionKits-EN-2504

Models: RayClic-S, RayClic-T, RayClic-X, RayClic-S Connection System, RayClic-S, Connection System

File Info : application/pdf, 12 Pages, 3.04MB

PDF preview unavailable. Download the PDF instead.

RAYCHEM-IM-H55388-RayClicConnectionKits-EN ?srsltid=AfmBOoqY44tsaw-Z2keDAoOrw8413Wpyd-qffDYfj kkwiTdngx4weFw

References

Adobe PDF Library 17.0 Adobe InDesign 20.4 (Windows)

Related Documents

PreviewRaychem RayClic Connection System Installation Instructions
Comprehensive installation guide for the Raychem RayClic Connection System, including Power Connection, Powered Splice, and Powered Tee kits. Covers preparation, installation steps for various heating cables (HWAT, IceStop, XL-Trace Edge), roof mounting, end seal installation, troubleshooting, and circuit testing.
PreviewRaychem GM-2X-KIT: Installation Guide for Gutter and Downpipe Frost Protection
Installation instructions and technical data for the Raychem GM-2X self-regulating heating cable kit, designed for frost protection of gutters and downpipes. Includes kit contents, installation steps, and specifications.
PreviewRaychem Commercial Heat Tracing Solutions: Products and Services
Explore Raychem's comprehensive range of commercial heat tracing solutions for safety, comfort, and performance. This document details products and services for pipe freeze protection, roof and gutter de-icing, surface snow melting, freezer frost heave prevention, heat loss replacement, and hot water temperature maintenance, along with control and monitoring systems.
PreviewRaychem H908 Plug-in Power Connection Kit with End Seal Installation Instructions
This document provides comprehensive installation instructions for the Raychem H908 Plug-in Power Connection Kit, designed for use with Raychem WinterGard heating cables (H311, H611, H612). It covers applications for pipe freeze protection and roof/gutter de-icing. The guide details kit contents, required tools, step-by-step installation procedures, electrical protection guidelines, testing, maintenance, and warranty information.
PreviewRaychem E-100-E End Seal Kit Installation Instructions
Comprehensive installation guide for the Raychem E-100-E end seal kit, compatible with various Raychem heating cables including BTV, QTVR, XTV(R), KTV, HTV, and VPL. This document provides safety warnings, technical specifications, and step-by-step instructions in multiple languages.
PreviewRaychem H900 WinterGard Power Connection Kit Installation Instructions
Comprehensive installation guide for the Raychem H900 WinterGard Power Connection Kit, detailing procedures for both pipe heating and roof/gutter de-icing applications. Includes safety warnings, tool requirements, kit contents, and electrical protection information.
PreviewRaychem E-100-L-A High-Profile Lighted End Seal Installation Instructions
Installation instructions for the Raychem E-100-L-A High-Profile Lighted End Seal, a NEMA 4X-rated end seal kit with a voltage indicator light, designed for use with Raychem industrial parallel heating cables.
PreviewRaychem HAK-C-100 Connection Kit for Division 1 Hazardous Locations Installation Instructions
Detailed installation instructions for the Raychem HAK-C-100 connection kit, designed for use in Division 1 hazardous locations with specific Raychem heating cables. Includes safety warnings, required tools, kit contents, step-by-step assembly, and troubleshooting guidance.