Lian Li PC-011 Dual D5 Reservoir Distribution Plate Assembly Manual
Premium Liquidcooling Distribution Plates by CHANNEL Z
Dimensions & Flow
Dimensions: Width 194mm | Height 441mm | Depth 91mm
Flow Diagram:
The diagram shows two reservoirs, each with 'In' and 'Out' ports. There are also 'Fill' ports accessible from the front. The dimensions are indicated as 194mm width, 441mm height, and 91mm depth. Specific port locations are detailed with measurements.
Product Overview
This is a Dual Loop Distribution Plate which fits onto the front panel of the Lian Li PC-011 Dynamic inside of the tempered glass front panel window. It has two separate reservoirs and fits two D5 pumps. It is compatible with any D5 pumps. It comes included with two D5 Retention Rings which attach the pump to the Distribution plate. There are 4 ports per reservoir, 2 inlets and 2 outlets to allow for different tube routes and parallel configurations. One of the outlets can be used as a drain port. There are fill ports for each loop on the front of the distribution plate which can be accessed by removing the tempered glass front panel window. It comes included with a DRGB Addressable LED strip.
Specifications
- Dimensions: Width 194mm | Height 441mm | Depth 91mm
- Material: Clear Cast Acrylic
- Fasteners: Stainless Steel Silver
- Gaskets: Silicone Black
- O-Rings: Silicone Black & Clear
- Stop Fittings: Brass Black Powder coat
- Ports: 10 (Inlets x4 | Outlets x4 | Fill x2)
- LED Strip: DRGB 5V Addressable
Included Items
- PC-011 Dual D5 Reservoir Distribution Plate x1
- Protium D5 Retention Ring Black x2
- D5 O-Ring x2
- M3 x 6mm Countersunk Hex Bolt x4
- Stop Fittings x6
- SC Distribution Plate D5 Pump Top x2
- Spectrum 2.0 DRGB LED Strip x1
- M3-M4 Stand Off x4
Note: D5 Pump and Cover Not Included
Installation
Compatible with the Lian Li PC-011 Dynamic. Remove the front panel tempered glass from the PC-011. Drill out the 4 rivets in the 4 corners of the case with a 4mm drill bit. Cleanup the debris left inside of the case. Attach the M4-M3 Stand Offs to the M4 threads on the 4 corners of the distribution plate. Position the distribution plate inside of the front panel and mount it with the included M3 6mm Countersunk fasteners (do not overtighten fasteners on the acrylic). Replace the front panel tempered glass.
Visual Aid: The diagram shows a side view of the case with arrows indicating where to drill and mount the plate.
Filling The Loop
Recommended Items:
- Air Pressure Tester
- External Power Supply for D5 Pump
- Long Fill Tube
We recommend air pressure testing before filling any loop. Air pressure should not surpass 0.6 bar. To fill the loop, we strongly recommend a long fill tube. We use a 90-degree fitting with a barb fitting and a 200mm length of soft tube. This prevents spilling and helps to remove the air faster.
Use an external PSU for your pump or jump start your PSU. Do not boot your system to fill the loop.
Fill the reservoir 100% and run the pump until the reservoir is almost empty (do not run the pump dry). Keep repeating until you have full circulation. Give some time for the final air to come out, it can take 30min to 48hrs depending on your build. Keep the fill tube on until all the air is out and then seal up the reservoir with a stop fitting.