Uline Stainless Steel Drums

Model Numbers: S-17353, S-17354, S-20529

Contact: 1-800-295-5510 | uline.com

Closure Instructions

Bolt Ring Closure for Open Head Drums

  1. CHECK GASKET – to ensure cover gasket is properly fitted into cover groove. (Refer to diagram showing a threaded lug and a diagram showing an unthreaded lug).
  2. PLACE COVER ON DRUM - being careful to properly seat gasket all around curl.
  3. POSITION & SEAT RING – with lugs downward. Ensure the inner channel of the closure ring engages entire drum curl and cover. Apply downward pressure on cover. Use a non-sparking dead-blow mallet to further seat cover and drum curl into the inner channel of the ring. (Diagram shows ring engaging drum and cover).
  4. INSERT BOLT – through the unthreaded lug of the ring. Assemble the locking hex nut onto the threaded end of the bolt and tighten into the threaded lug. Close the ring to an initial gap of about 1/2 inch (1.3 cm). (Diagram shows bolt and locking nut).
  5. TIGHTEN THE BOLT – with a calibrated torque wrench while using downward pressure on the cover and hammering the outside of the ring with a non-sparking dead-blow mallet to further seat the ring. Continue tightening and hammering the ring until the torque stabilizes at 55 - 60 ft-lbs (74.6 - 81.3 N.m) and does not decrease when further hammering on the ring circumference is performed. Ring ends must not touch. (Diagram indicates ring ends must not touch). (Effective 25 September, 2006 and in accordance with CFR 178.2(c), torque is the most effective closure requirement.)
  6. LOCK RING – by tightening the nut against the unthreaded lug. (Diagram shows locking nut against unthreaded lug).

Drums with Fittings

  1. CHECK GASKETS – and ensure gasket is properly seated on plug.
  2. TIGHTEN - to specifications listed in the table, and do not cross thread.
PLUG TYPETORQUE SPECIFICATIONS
TRI-SURE STYLERIEKE STYLE (PLASTIC)RIEKE STYLE (STEEL)
3/4" PLUGBuna12 ft-lbs9 ft-lbs20 ft-lbs (Poly)
Poly or Teflon20 ft-lbs9 ft-lbs15 ft-lbs (All Others)
PE / PP (Composite Drums)
2" PLUGBuna20 ft-lbs20 ft-lbs40 ft-lbs (Poly)
Poly or Teflon30 ft-lbs20 ft-lbs30 ft-lbs (All Others)
PE / PP (Composite Drums)10 ft-lbs

Important Information

Drums with Fittings

Models: Stainless Steel Drums, S-17353, S-17354, S-20529

File Info : application/pdf, 3 Pages, 200.13KB

PDF preview unavailable. Download the PDF instead.

IS-17353-SPFR Adobe InDesign 14.0 (Macintosh) Adobe PDF Library 15.0

Related Documents

Preview ULINE Fiber Drum Closure Instructions and UN Certification Guide
Comprehensive guide for closing ULINE Fiber Drums (Models S-7900, S-9944, S-11877, S-17005, S-17006) in compliance with DOT CFR 49 Part 178.2(c)(1). Includes steps for secure closure and details on UN performance test requirements.
Preview ULINE H-3886, H-4420 IBC Tanks Closure Specifications
Detailed closure specifications for ULINE H-3886 and H-4420 Intermediate Bulk Container (IBC) Tanks, including torque values for caps and valves.
Preview Uline Cut Resistant Glove Guide: Selecting the Right Gloves
A comprehensive guide from Uline on selecting cut-resistant gloves based on ANSI cut levels, typical applications, liner materials (Dyneema/HPPE and Kevlar), coating types (Polyurethane, Nitrile, Latex), gauge, and abrasion resistance. Features a product catalog with detailed specifications.
Preview ULINE Anti-Static Table Mat Installation Guide
Step-by-step installation instructions for the ULINE Anti-Static Table Mat, including grounding procedures and safety notes. Covers model numbers S-12741 through S-21921.
Preview ULINE Slings: Safe Operation, Capacity, and Inspection Guide
This ULINE guide details safe operation, capacity calculations, and inspection for lifting slings (models S-17880-S-17885). Essential for industrial lifting safety and efficiency.
Preview ULINE Metal Buckles for Poly Strapping Installation Guide - S-108, S-12709, S-12928, H-12929, S-12930, S-18507
Concise instructions for using ULINE metal buckles with poly strapping. Learn the threading and tightening process for models S-108, S-12709, S-12928, H-12929, S-12930, S-18507. Essential for secure packaging applications.
Preview ULINE H-1381 Drum Opener: Operation and Maintenance Guide
Comprehensive guide for the ULINE H-1381 Drum Opener, detailing safe operation, step-by-step instructions for opening steel drums, and essential maintenance procedures. Includes warnings and cautions.
Preview ULINE S-9947, S-9948, S-17942 Plastic Pail Lid Assembly Instructions
Step-by-step guide for attaching and securing ULINE plastic pail lids (models S-9947, S-9948, S-17942). Learn how to align and secure the lid using a rubber mallet, with clear instructions and tips to prevent breakage.