Jinko Battery System QUICK INSTALLATION GUIDE

Model: JKS-BXXX37-CS

File version: 20230118-V1-EN. Information might be subject to change without notice during product improvement.

Version: V1.0

Target Group

Skilled personnel recognized

This manual and the tasks and procedures described herein are intended for use by skilled workers only. A skilled worker is defined as a trained and qualified electrician or installer who has all of the following skills and experience:

  • Knowledge of the functional principles and operation of on-grid systems.
  • Knowledge of the dangers and risks associated with installing and using electrical devices and acceptable mitigation methods.
  • Knowledge of the installation of electrical devices.
  • Knowledge of and adherence to this manual and all safety precautions and best practices.

Please note that this is the quick reference guide only. It is a shortened assistance for the installation of the Battery HV and does not replace the original installation manual. The original installation manual must be read and understood completely before installation. Please download and view the installation manual on this website: www.jinkosolar.com (Downloads)

In order to ensure the normal operation of Battery-Box, please be sure to update the firmware to the latest version and finish the configuration on Battery-Box webpage in accordance with this document.

The system switch must be off before installing.

Please make sure the system switch is off in case of the system not working, and it would be better to repair it again within one week, avoiding overdischarge or other problems happen.

Please do not stack up batteries without protective package when storing or handling batteries, unless in the case of installation.

Any damage resulting from non-compliance with the information contained in this manual will void the warranty.

Total discharge of the battery is not recommended. In the event that this happens, it must be recharged within the next 12h.

For battery expansion module, all modules must be precharged at 100% SOC. For battery system expansion, please refer to the battery expansion guide.

Installation Environment Requirements

Maximum Temperature: +50°C

Minimum Temperature: -10°C

Relative Humidity (RH): +5% ~ +95%

Installation Location Guidelines:

  • YES: Indoor installation, or under outdoor eaves.
  • YES: Location protected from direct sunlight.
  • YES: Location protected from direct rainfall.
  • YES: Location protected from snow accumulation.
  • NO: Direct sunlight.
  • NO: Direct rainfall.
  • NO: Snow accumulation.
  • NO: Flammable material or gas near the installation.
  • NO: Flammable wall.

The battery could be installed both indoor or under the outdoor eaves where is not in direct sunlight, rain fall and snow accumulation. And the clearance to flammable materials or gas should be more than 1 meter.

Tools Required

A list of tools required for installation:

  • Power Cable Clamp
  • Pen
  • Phillips Screwdriver Bit
  • Flat Head Screwdriver
  • Wire Stripper
  • Crimping Pliers
  • Wrench
  • Tape Measure
  • Hair Dryer
  • Cylinder Screwdriver
  • Torque Wrench
  • Drill

Packing List

ItemSpecificationQuantityFigure Description
Communication Cable to InverterStandard, Black /L2000mm /RJ45 plug at both sides1 PCSA black communication cable with RJ45 connectors on both ends, 2000mm in length.
Communication Connector to BDURJ45 Waterproof connector1 PCSAn RJ45 waterproof connector.
Cross recessed countersunk head screwM4*1020 PCSScrews for securing components.
M6 3 Sets of Combined ScrewsM6×14 pcs1 PCSA set of M6 screws, likely for module stacking.
Ground terminalOT4-62 PCSTerminals for grounding connections.
Power Cable ConnectorTo positive pole of battery1 PCSA connector for the positive battery terminal.
Power Cable ConnectorTo negative pole of battery1 PCSA connector for the negative battery terminal.
Power CablePositive cable 6mm²,red,2m1 PCSA 2-meter red power cable, 6mm² gauge, for positive connection.
Power CableNegative cable 6mm²,black,2m1 PCSA 2-meter black power cable, 6mm² gauge, for negative connection.

Overall Structure

The Jinko Battery System JKS-BXXX37-CS is composed of a Base unit and optional Battery Management Units (BDU) and Battery Modules (JKS-Bxxx37-CS). The system can be expanded by connecting multiple battery modules.

  • Limited to the voltage interval of the inverter, the smallest number of JKS-B9637-CS modules used by series is 2.
  • Limited to the conversion conditions of the BDU internal DC, the maximum number of JKS-B9637-CS modules is 6.

Module Capacities:

  • JKS-B19237-CS: 7.1kWh
  • JKS-B28837-CS: 10.6kWh
  • JKS-B38437-CS: 14.6kWh
  • JKS-B48037-CS: 17.7kWh
  • JKS-B57637-CS: 21.3kWh

The system includes a Base unit, a BDU, and multiple JKS-Bxxx37-CS battery modules stacked on top.

Installation Steps

  1. Unpack: Unpack the BDU+Base and HV9637 battery modules.
  2. Separate the BDU and Base: Carefully separate the BDU from the Base unit using appropriate tools.
  3. Balance: Ensure proper ventilation by allowing a clearance of approximately 300mm to the side and approximately 50mm to the wall. This helps dissipate the heat of the battery.
  4. Stacking and locking: When assembling the BDU, ensure that the circuit breaker switch of the BDU is in the "OFF" state. Stack the modules securely and tighten the fixed bolt in turn.
  5. Connect the cable: Connect the communication cable, negative cable, and positive cable between the battery modules and the BDU. It is recommended that a circuit breaker is installed between the battery and the inverter to prevent damage when a short circuit occurs.
  6. Earth connection: Connect the earth cable to the designated grounding point, ensuring a secure connection. The diagram shows a green/yellow wire being connected.

Battery System Operation

  1. Battery system on:
    1. First, push the circuit breaker of BDU to the "ON" state.
    2. Turn the self-locking switch to "ON", press and hold the "WAKE" button for 3 to 7 seconds. Release your fingers; the green light will always be on, and the battery will be turned on successfully.
  2. Battery system Shut down:
    1. Switch off the "POWER ON" switch.
    2. Switch the "DC BREAKER" to the "OFF" state.

Battery System Expansion

Solution 1: High Voltage battery expansion (With DC Charger)

  1. Initial Preparation: Disconnect existing battery and ensure safety precautions.
  2. Charge the original battery tower to SOC 100%: Use an inverter to charge the tower until the SOC reaches 100%.
  3. Charge the new battery module to 100% with a DC charger: Add the new module JKS-B9637-CS between the base and HVB (High Voltage Box). The factory SOC of the module is initially set at 50%. A DC charger is needed. Configure the charging voltage of the DC charger to 110V. Continue charging the battery until the HVB automatically terminates the charging process. The diagram shows a new battery module being connected to an existing stack, with a DC charger supplying power.
  4. Add the new battery module to the system: The diagram shows a new battery module, charged to 100% SOC, being added to an existing battery stack.

Solution 2: High Voltage battery expansion (Without DC Charger)

  1. Initial Preparation: Disconnect existing battery and ensure safety precautions.
  2. Preparing for Expansion: Discharge the original battery tower to 40% State of Charge (SOC).
  3. Integrating the New Battery Module:
    1. Add the new battery modules into the existing battery tower.
    2. In cases of insufficient photovoltaic (PV) power generation, enable grid charging to the batteries in the inverter setting. Continue charging until the battery state of charge (SOC) reaches 100% or the charge current limit reaches 0A. The diagram shows modules being added to a stack, with SOC levels indicated.
  4. Removing the new battery modules and keep charge the original batteries to SOC 100%:
    1. Carefully disconnect and remove the new battery module from the integrated system.
    2. Restart the charging process for the original battery tower until battery state of charge (SOC) reaches 100% or until the charge current limit reaches 0A. The diagram shows modules being removed and the remaining stack being charged.
  5. Reintroducing the New Battery Module:
    1. Reconnect the new battery module, which is already at 100% SOC, to the original battery system.
    2. Ensure that the new module is securely integrated into the original system. Furthermore, please remember to restore the original settings of the inverter. The diagram shows a 100% SOC module being reconnected to the stack.
  6. Finalizing:
    1. Perform system assessment for stability and functionality.
    2. Create documentation for future reference.

Safety Warning: Ensure safety gear and protocols during all connections and disconnections to prevent accidents or damage. Always prioritize safety during installation.

Please refer to the detailed manual for specific instructions, manufacturer recommendations, and safety guidelines.

Inverter Compatibility Statement

Manufacturer: Jinko Solar Co., Ltd.

Address: No.1, Yingbin Road, Economic Development Zone, Shangrao City, 334100 Jiangxi, P.R. China

Web: www.jinkosolar.com

Jinko Solar Co., Ltd. declares that the following product is issued under their sole responsibility:

  • Product: Rechargeable Li-ion Battery
  • Model(s): JKS-BXXX37-CS (JKS-B19237-CS, JKS-B28837-CS, JKS-B38437-CS, JKS-B48037-CS, JKS-B57637-CS)
  • Description: JKS-B9637-CS is an energy storage unit composed of electrochemical cells, switch button, battery management system (BMS), power and signal terminals, and mechanical parts. Each JKS-B9637-CS consists of 37Ah cells which form a 96V voltage battery pack. Two to Six JKS-B9637-CS can be connected in parallel to extend the capacity and power of the energy storage system.

The statement described above is compatible with the inverters listed in the following table:

Inverter ManufactureProductModel
Jinko Solar Co., Ltd.Hybrid InverterJKS-5H-EI-AU
JKS-6H-EI-AU
JKS-8H-EI-AU
JKS-10H-EI-AU
JKS-12H-EI-AU
JKS-15H-EI-AU
JKS-20H-EI-AU
JKS-25H-EI-AU

Date: 03/08/2024

Contact Information

Jinko Solar Co., Ltd

No.1 Yingbin Road, Shangrao Economic Development Zone, Shangrao City, Jiangxi Province 334100 P.R. China

www.jinkosolar.com

PDF preview unavailable. Download the PDF instead.

JKS-BXXX37-CS-quick-installation-manual-1.1 3-Heights™ PDF Optimization Shell 6.3.1.5 (http://www -tools.com)

Related Documents

Preview Jinko Solar JKS-B51XXX-BI Series Residential Energy Storage User Manual
This user manual provides detailed instructions for the installation, operation, safety, maintenance, and troubleshooting of the Jinko Solar JKS-B51XXX-BI Series Residential Energy Storage Battery System. It covers product overview, technical specifications, and emergency response procedures.
Preview Jinko Solar JKS-B5150-BI Battery System Quick Installation Guide
Concise installation guide for the Jinko Solar JKS-B5150-BI Battery Energy Storage System (BESS), covering environment, packing, floor and wall mounting, wiring, and operation.
Preview Jinko Solar Tiger Neo 72HL4-V 570-600W N-type Mono-facial Module Datasheet
Technical datasheet for Jinko Solar's Tiger Neo 72HL4-V series N-type mono-facial solar modules, featuring HOT 2.0 technology, enhanced mechanical load capacity, and detailed electrical performance specifications. Includes mechanical characteristics, packaging, STC specifications, and application conditions.
Preview Jinko Solar Photovoltaic Module Installation Manual
This manual provides comprehensive installation, maintenance, and safety guidelines for Jinko Solar photovoltaic (PV) modules. It covers general information, installation conditions, mechanical and electrical installation procedures, and care instructions for various Jinko Solar module types.
Preview Jinko Solar Photovoltaic Module Storage and Unpacking Guide
Comprehensive guide from Jinko Solar on the safe storage, loading, unloading, unpacking, and sampling procedures for photovoltaic (PV) modules. Includes handling precautions and packing method details.
Preview Jinko Solar TIGER Neo III Neo 3.0 Solar Panel: Advanced Features and Applications
Discover the Jinko Solar TIGER Neo III Neo 3.0 solar panel, engineered for superior performance. Features include 650-670W power output, 85±5% bifaciality, a low -0.26%/°C temperature coefficient, and excellent 96.77% low irradiance efficiency. Ideal for diverse projects from residential rooftops to large ground-mounted power plants, offering high reliability and long-term energy generation.
Preview Jinko Solar PV Module Warranty Statement - JKM***N-54HL4M-BDV & JKM***N-48HL4M-DV
Official warranty statement from Jinko Solar CO., LTD. detailing the extended product warranty for JKM***N-54HL4M-BDV and JKM***N-48HL4M-DV PV modules, effective from June 1, 2025.
Preview Jinko Solar Tiger Neo N-Type 450-475W Solar Panel Datasheet
Explore the Jinko Solar Tiger Neo N-Type 450-475W solar panel. This datasheet details its advanced N-type TOPCon technology, dual glass design, high efficiency, durability, and comprehensive warranties for reliable solar energy generation.