JKS-B5150-BI Quick Installation Manual

Brand: Jinko Solar

1. Installation Environment

Operating Temperature: Max +50°C, Min -10°C

Operating Humidity: RH 5% ~ 95%

2. Installation Tools

Tools required include a screwdriver, wrench, and potentially others as depicted in diagrams.

3. Check

3.1 Check Packing List

Verify all components are present:

3.2 Check Accessories

Details on system configurations and sizes:

Installation Method System Size (mm) Compound Mode
Standard wall-mounted installation 2000 (W) x 676 (H) x 283 (D) A+B
Standard floor installation 2500 (W) x 650 (H) x 260 (D) A+B+D
Wall-mounted battery system stacked in two lines 2500 (W) x 676 (H) x 283 (D) A+B+C
Floor installation battery system stacked in two lines 2500 (W) x 650 (H) x 260 (D) A+B+C+D*2

Note: 'A', 'B', 'C', 'D' refer to specific battery modules or configurations not detailed here.

4. Floor Installation with Base

4.1 Installation Location Requirements

Clearances:

Recommendations:

4.2 Installation Procedure

Diagrams illustrate the process of stacking batteries on a base. The procedure involves placing the first unit, then subsequent units on top, ensuring proper alignment and connection.

5. Wall-Mounted Installation Process

5.1 Installation Location Requirements

Clearances:

Important Notes:

5.2 Installation Procedure

Diagrams show the steps for wall mounting, including attaching brackets to the wall, lifting and securing the battery unit onto the brackets, and connecting cables.

6. Installation Environment (Continued)

Recommendation: Build a sun and rain shade to avoid direct exposure to sunlight and rain.

7. Wire Connection

7.1 Connection End Face Introduction

The battery unit features several ports:

7.2 Diagram of Wiring Connection

The diagram illustrates parallel wiring connections between multiple battery units and the Power Conversion System (PCS). It shows the use of parallel cables connecting positive and negative terminals, and CAN communication cables. A circuit breaker is recommended for connecting the PCS to the JKS-B5150-BI. The recommended circuit breaker specifications are a rated working voltage greater than 80V and a rated working current greater than 125A.

8. Terminal Connection

8.1 Power Terminal

Procedure: Press the indicated position on the power terminal before disconnecting to ensure safe removal. Diagrams show the battery side and wire harness side connections.

8.2 Communication Terminal

Diagrams show the connection of communication harnesses between battery units and to the PCS.

9. Battery System Switch Operation

Power ON Battery System:

Power OFF Battery System:

10. Key Operation

Power Button:

Note: When multiple battery modules are connected in parallel, pressing the power button on any single module will start or shut down the entire system. The ALM/RUN light turns green when the system is powered on.

11. Service and Contact

Company: Jinko Solar Co., Ltd.

Address: No.1, Jinko Road, Shangrao Economic Development Zone, Shangrao City, Jiangxi Province, 334100, P.R. China

Website: www.jinkosolar.com

Email: BESS_AU@Jinkosolar.com

Models: 044.DA0092000, JKS-B5150-BI, JKS-B5150-BI Energy Storage, Energy Storage, Storage

File Info : application/pdf, 2 Pages, 2.94MB

PDF preview unavailable. Download the PDF instead.

JKS-B5150-BI-Quick-Installation-Manual

References

Corel PDF Engine Version 18.1.0.661 CorelDRAW X8

Related Documents

Preview Jinko Solar JKS-B51XXX-BI Series Residential Energy Storage User Manual
This user manual provides detailed instructions for the installation, operation, safety, maintenance, and troubleshooting of the Jinko Solar JKS-B51XXX-BI Series Residential Energy Storage Battery System. It covers product overview, technical specifications, and emergency response procedures.
Preview Jinko Battery System JKS-BXXX37-CS Quick Installation Guide
A quick installation guide for the Jinko Battery System, model JKS-BXXX37-CS, detailing setup procedures, environmental requirements, packing contents, system structure, expansion methods, and inverter compatibility. This guide is intended for skilled personnel.
Preview Jinko Solar Photovoltaic Module Storage and Unpacking Guide
Comprehensive guide from Jinko Solar on the safe storage, loading, unloading, unpacking, and sampling procedures for photovoltaic (PV) modules. Includes handling precautions and packing method details.
Preview Jinko Solar Photovoltaic Module Installation Manual
This manual provides comprehensive installation, maintenance, and safety guidelines for Jinko Solar photovoltaic (PV) modules. It covers general information, installation conditions, mechanical and electrical installation procedures, and care instructions for various Jinko Solar module types.
Preview Jinko Solar TIGER Neo III Neo 3.0 Solar Panel: Advanced Features and Applications
Discover the Jinko Solar TIGER Neo III Neo 3.0 solar panel, engineered for superior performance. Features include 650-670W power output, 85±5% bifaciality, a low -0.26%/°C temperature coefficient, and excellent 96.77% low irradiance efficiency. Ideal for diverse projects from residential rooftops to large ground-mounted power plants, offering high reliability and long-term energy generation.
Preview Jinko Solar Neo 3.0: Industry-Leading 85±5% Bifaciality Solar Panel
Discover the Jinko Solar Neo 3.0 TOPCon solar panel, featuring an industry-leading 85±5% bifaciality. Learn about its advanced technology, superior performance in low-light conditions, and enhanced power generation compared to BC technology.
Preview Jinko Solar Photovoltaic Module Installation Manual
Comprehensive installation manual for Jinko Solar Photovoltaic Modules, covering safety, mechanical installation, wiring, maintenance, and electrical specifications. Essential guide for installers.
Preview JinkoSolar Photovoltaic Module User Manual (UL1703)
This user manual provides comprehensive installation, safety, wiring, maintenance, and electrical specification details for JinkoSolar photovoltaic modules, ensuring compliance with UL1703 standards for reliable solar energy systems.