Vetus Bow and Stern Thruster Control Panel Operation

This document provides operating instructions for Vetus Bow and Stern Thruster Control Panels, including models BPAJ, BPAS, BPJR(C), and BPSR(C).

General Operation and Safety

CAUTION! If two control panels are installed, never operate the bow thruster from both panels simultaneously.

Switching on the panel: Press the on/off switch twice. The LED will flash blue and the buzzer will sound continuously (.......) after the first press. The on/off switch must be pressed a second time within 6 seconds. The LED will then remain blue, and the buzzer will confirm readiness with a signal (-.-).

Direction Switch: The electric motor is operated by the direction switch. A 1.5-second delay occurs when changing direction from port to starboard or vice versa, allowing the motor to stop before reversing. Operating the direction switch for over 2 minutes continuously will switch off the motor. A warning signal (...) will sound, and the LED will flash red for 5 seconds. The motor can be restarted once the switch is released and the LED is blue.

Switching off the panel: Press the on/off switch once after using the bow thruster. The panel will emit a signal (...-.-).

Automatic Switching Off: By default, the panel automatically switches off 30 minutes after the last operation of the direction switch. This feature can be disabled by pressing the on/off button again. It can also be re-enabled.

To switch 'Automatic Switching Off' on or off:

  1. Switch off the power supply to the bow thruster (Battery main switch).
  2. Operate the direction switch (or both) to starboard (right) and hold it.
  3. Switch on the power supply to the bow thruster.
  4. The LED(s) will light up briefly: RED indicates 'Automatic Switching Off' is now off; BLUE indicates it is now on.
  5. Release the direction switch(es). The setting is saved and retained even when the power supply is switched off.

Important: Switch off the main switch when leaving the ship.

Protections

Thermal protection of the control current: If the control current circuit is overloaded, the panel will sound a warning once (.-..-) and the LED will flash red and blue alternately for approximately 7 seconds. Normal function will resume once the overload is resolved.

Connection Diagrams

For wiring diagrams related to the remote-controlled use of a battery master switch through the bow thruster panel, please refer to www.vetus.com.

Product Dimensions

BPAJ / BPAS

Dimensions are provided in millimeters (with inches in parentheses).

BPJR(C) / BPSR(C)

Dimensions are provided in millimeters (with inches in parentheses).

Contact Information

Vetus B.V.
Havenstraat 11
3115 HC Schiedam - The Netherlands
Tel.: +31 (0)88 4884700
sales@vetus.com
www.vetus.com

Models: BPAJ, BPAS, BPJR C, BPSR C, BPAJ Bow and Stern Thruster Control Panels, BPAJ, Bow and Stern Thruster Control Panels, Stern Thruster Control Panels, Thruster Control Panels, Control Panels

File Info : application/pdf, 2 Pages, 490.93KB

PDF preview unavailable. Download the PDF instead.

020575.01-r04-2025-08-BPAJ-BPAS-BPJRC-BPSRC

References

Adobe PDF Library 17.0 Adobe InDesign 20.5 (Windows)

Related Documents

Preview VETUS Bow Thruster Panel Wiring Diagrams: BPAJ, BPAS, BPJR(C), BPSR(C)
Detailed wiring diagrams and component identification for VETUS bow thruster control panels, including models BPAJ, BPAS, BPJR(C), and BPSR(C). Covers main switch, solenoid switches, electric motors, and wiring color codes for 12/24V systems.
Preview Vetus BPJ5B & DBPJ5B Hydraulic Thruster Control Panels: Installation and User Manual
Comprehensive guide for installing and operating Vetus BPJ5B and DBPJ5B hydraulic thruster control panels, including joystick operation, wiring diagrams, dimensions, and mounting specifications.
Preview Vetus BOW PRO 'A' Series Thrusters Installation Manual
Comprehensive installation manual for Vetus BOW PRO 'A' Series Bow Thrusters, models BOWA0651 and BOWA0764. This guide provides detailed instructions, safety precautions, and technical specifications for the proper installation of these marine thrusters.
Preview VETUS BOW PRO 'B' Series Thrusters Installation Manual
Comprehensive installation manual for the VETUS BOW PRO 'B' Series Thrusters, model BOWB057. Provides detailed instructions, safety precautions, electrical connections, and technical specifications for marine thruster installation.
Preview Vetus BOWA0571 BOW PRO 'A' Series Thruster Installation Manual
Comprehensive installation guide for the Vetus BOWA0571 BOW PRO 'A' Series Bow Thruster, covering safety, mounting, electrical connections, and technical specifications.
Preview VETUS GRP Stern-Thruster Installation Guide
Comprehensive installation instructions for the VETUS GRP Stern-Thruster, detailing positioning, operation, maintenance, and flange installation for marine applications. Includes guidance on hull preparation and propeller clearance.
Preview VETUS BOWPRO Joystick Control Interface CANVXCJP Installation Manual
This manual provides comprehensive installation guidelines for the VETUS BOWPRO joystick control interface, model CANVXCJP. It covers safety precautions, connection procedures for CAN bus cables and joysticks, system testing, configuration, and troubleshooting.
Preview VETUS BPPPA/BPPJA Proportional Panel User Manual
This user manual provides essential operating and troubleshooting guidelines for the VETUS BPPPA and BPPJA proportional control panels. These panels are designed for precise control of bow and stern thrusters on marine vessels.