In This Kit
Part # | Description | Qty |
---|---|---|
8076491 | VFD DRIVE IHP-230V 3PH | 1 |
8198077 | VFD JUMPER SETTINGS INSTRUCTIONS | 1 |
Instructions
- Turn off the controllers.
- Disconnect power from the fryer.
- Remove the JIB/BIB oil reservoir.
- Pull the fryer out from under the hood to gain access to the rear of the fryer.
- Remove the three (3) screws to remove the splash shield from the rear of the SCB box (see Figure 1).
- Disconnect the five (5) Molex harnesses and unscrew the filter motor cable (see Figures 2 & 3).
- Remove the two (2) screws attaching the cover of the SCB box (see Figure 4).
- Lift up slightly on the cover and then angle forward to remove the SCB box cover (see Figure 5). Set the cover aside.
- Locate the two (2) harnesses that run through the grommet on the rear of the SCB box (see Figure 6).
- From the front of the SCB box, locate the red harness from step 9, with the red and black wires. Gently press on the [lock] to disconnect the two (2) pin connector, from the SCB board (see Figure 7).
- Locate the harness in the black netting from step 9. Gently press in on the side of the connector to disconnect the YELLOW CAN cable connector from the SCB board (see Figure 8).
- Disconnect the purple wire from the relay in the top left corner of the box that is tied into the harness in the previous step, (see Figure 9).
- From the rear of the SCB box, gently pull the harnesses disconnected in steps 10, 11 & 12 through the rear grommet in the rear of the SCB box (see Figure 10). Let them rest behind the SCB box.
- Loosen, DO NOT REMOVE, the two screws, on the LEFT SIDE of the SCB box, with the slots, as viewed from the front of the fryer, that attach the SCB box to the frame (see Figure 11).
- REMOVE, the two screws, on the RIGHT SIDE of the SCB box, as viewed from the front of the fryer, attaching the SCB box to the frame (see Figure 12).
- Gently slide the box to the right and lower the SCB box to the floor (see Figure 13).
- Slide the SCB box forward from underneath the fryer.
- Relocate the SCB box to a flat working surface to replace the VFD.
- Mark the four (4) center Molex connectors positions for easy reassembly (see Figure 14).
- Using a screwdriver loosen and push the four (4) center Molex connectors back into the SCB box (see Figures 15 & 16).
- Lay the wires towards the front of the box out of the way (see Figure 17). NOTE: Use caution working around the VFD capacitors. They still may store a charge and pose a shock hazard.
- Use a long extension with a 5/16" driver to LOOSEN the nuts on the RIGHT side of the VFD (see Figure 18).
- Use a long extension with a 5/16" driver to REMOVE the nuts on the LEFT side of the VFD (see Figure 19).
- Disconnect the gray CAN cable from the VFD (see Figure 20).
- Locate the green [ground] wire in the upper top left corner of the VFD (see Figure 24). Trace it back to the Yellow Wago terminal block (see Figure 21). Lift up on the orange tab and remove the [ground] wire from the terminal block (see Figure 22). Loosen the [ground] wire out of the harnesses. This will make the VFD easier to remove.
- Slide the VFD slightly left and off the studs and set the VFD on the top edge of the box (see Figure 23).
- Remove the green screw with [ground] wire & set aside (see Figure 24).
- Place the new VFD on a flat surface (see Figure 25).
- Lift up on the top cover clips to detach and discard the top cover (see Figure 26).
- If a WHITE jumper wire is currently connected to the VFD board, disconnect the jumper wire and install it on the new VFD (see Figure 27). NOTE: Use caution working around the VFD capacitors. They still may store a charge and pose a shock hazard. The new VFD ships without the jumper installed (200-250V range). The jumper is in a bag marked 115V. If using 100V-120V, ensure the jumper is attached. IF THE VOLTAGE IS 200V AND ABOVE, ENSURE THE JUMPER IS NOT INSTALLED!!!!!!! NOTE: If the jumper is NOT removed for high voltage (200V-250V), it will destroy the VFD!
- Locate the ribbon cable (see Figure 28). Under the ribbon cable is a series of jumpers. Set the jumper on J1 and J2 as shown (see Figure 29). J2 should be towards the outer edge of the VFD. Then there should be an open pin and then jumper on J1 and then an open pin. This jumper is the GFCI setting. If this setting isn't set correctly the fryer may trip a breaker during filtration.
- Attach the green [ground] wire removed from the old VFD in step 27 to the new VFD [ground] terminal (see Figure 30).
- Locate the new VFD next to the old VFD on the rail of the SCB box and swap wires over, one at a time to the same locations (see Figures 31 & 32).
- Reverse steps 5 through 27. Ensure that the CAN cable between the SCB board and the VFD is connected to the same position as Figure 20 (next to the blue terminal block).
- Push the fryer back under the hood.
- Reposition the JIB/BIB in the fryer.
- Reconnect power to the fryer.
- Perform a filter to ensure the VFD is functioning correctly.
Figure 1: Splash shield of the SCB box.
Figure 2: Molex harnesses and filter motor cable.
Figure 3: SCB box cover screws.
Figure 4: SCB box cover removed, showing internal components.
Figure 5: Angling the SCB box cover forward.
Figure 6: Harnesses running through the rear grommet.
Figure 7: Disconnecting the 2-pin red harness connector.
Figure 8: Disconnecting the YELLOW CAN cable connector.
Figure 9: Disconnecting the purple wire from the relay.
Figure 10: Pulling harnesses through the rear grommet.
Figure 11: Loosening screws on the LEFT SIDE of the SCB box.
Figure 12: Removing screws on the RIGHT SIDE of the SCB box.
Figure 13: Sliding the SCB box to the right and lowering it.
Figure 14: Marking Molex connector positions.
Figure 15: Loosening Molex connectors.
Figure 16: Pushing Molex connectors back.
Figure 17: Laying wires towards the front.
Figure 18: Loosening nuts on the RIGHT side of the VFD.
Figure 19: Removing nuts on the LEFT side of the VFD.
Figure 20: Disconnecting the gray CAN cable from the VFD.
Figure 21: Locating the green Wago terminal block.
Figure 22: Lifting the orange tab to remove the ground wire.
Figure 23: Sliding the VFD off studs.
Figure 24: Green screw with ground wire.
Figure 25: New VFD on a flat surface.
Figure 26: Discarding the top cover.
Figure 27: Installing the jumper wire on the new VFD.
Figure 28: Ribbon cable.
Figure 29: Jumper settings on J1 and J2.
Figure 30: Attaching the green ground wire to the new VFD.
Figure 31: Swapping wires to the new VFD.