Installation Instructions

Symbio™ 700 Customer Connection Module

Precedent™ Packaged Rooftop Units

3 to 25 Tons

Model Number: FIASCCM001*

Used With: Precedent™ with Symbio™ 700 Controls

▲ SAFETY WARNING

Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are attached to the equipment.

September 2024

ACC-SVN282A-EN

Introduction

Read this manual thoroughly before operating or servicing this unit.

Warnings, Cautions, and Notices

Safety advisories appear throughout this manual as required. Your personal safety and the proper operation of this machine depend upon the strict observance of these precautions.

The three types of advisories are defined as follows:

Important Environmental Concerns

Scientific research has shown that certain man-made chemicals can affect the earth's naturally occurring stratospheric ozone layer when released to the atmosphere. In particular, several of the identified chemicals that may affect the ozone layer are refrigerants that contain Chlorine, Fluorine and Carbon (CFCs) and those containing Hydrogen, Chlorine, Fluorine and Carbon (HCFCs). Not all refrigerants containing these compounds have the same potential impact to the environment. Trane advocates the responsible handling of all refrigerants.

Important Responsible Refrigerant Practices

Trane believes that responsible refrigerant practices are important to the environment, our customers, and the air conditioning industry. All technicians who handle refrigerants must be certified according to local rules. For the USA, the Federal Clean Air Act (Section 608) sets forth the requirements for handling, reclaiming, recovering and recycling of certain refrigerants and the equipment that is used in these service procedures. In addition, some states or municipalities may have additional requirements that must also be adhered to for responsible management of refrigerants. Know the applicable laws and follow them.

▲ WARNING

Proper Field Wiring and Grounding Required!

Failure to follow code could result in death or serious injury.

All field wiring MUST be performed by qualified personnel. Improperly installed and grounded field wiring poses FIRE and ELECTROCUTION hazards. To avoid these hazards, you MUST follow requirements for field wiring installation and grounding as described in NEC and your local/state/national electrical codes.

▲ WARNING

Personal Protective Equipment (PPE) Required!

Failure to wear proper PPE for the job being undertaken could result in death or serious injury. Technicians, in order to protect themselves from potential electrical, mechanical, and chemical hazards, MUST follow precautions in this manual and on the tags, stickers, and labels, as well as the instructions below:

▲ WARNING

Follow EHS Policies!

Failure to follow instructions below could result in death or serious injury.

▲ WARNING

R-454B Flammable A2L Refrigerant!

Failure to use proper equipment or components as described below could result in equipment failure, and possibly fire, which could result in death, serious injury, or equipment damage.

The equipment described in this manual uses R-454B refrigerant which is flammable (A2L). Use ONLY R-454B rated service equipment and components. For specific handling concerns with R-454B, contact your local representative.

Copyright

This document and the information in it are the property of Trane, and may not be used or reproduced in whole or in part without written permission. Trane reserves the right to revise this publication at any time, and to make changes to its content without obligation to notify any person of such revision or change.

Trademarks

All trademarks referenced in this document are the trademarks of their respective owners.

General Information

Inspection

  1. Unpack all components of the kit.
  2. Check carefully for shipping damage. If any damage is found, report it immediately, and file a claim against the transportation company.

Specifications

Operating Temperature Range -40 to 70°C (24 Vac)
LEDS Color Description
Green Status
Red Status
Agency Green TX
Yellow RX
UL/CSA 60730 listed
UL94-5V Flammability
FCC Part 15, Class B Emissions

Parts List

Figure 1. Kit contents

A diagram showing the components of the kit: a main circuit board (1), screws (2), a harness (3), and an information label (4).

Table 2. Kit parts list

Item Description Qty
1 Customer Connection module 1
2 Screws 4
3 Harness IMC communication (product dependent) 2
4 Information label 1

Installation

▲ WARNING

Hazardous Voltage!

Failure to disconnect power before servicing could result in death or serious injury. Disconnect all electric power, including remote disconnects before servicing. Follow proper lockout/tagout procedures to ensure the power can not be inadvertently energized. Verify that no power is present with a voltmeter.

  1. Confirm power to the unit has been disconnected and locked out.
  2. For Precedent™ units, open the access panel to gain access to the right side of the main unit control box.
  3. Install the customer connection module and secure the board with four screws (provided in kit). Confirm P5 connector is aligned to the top right position for B/C/D cabinet installations. 3 to 5 ton products (A cabinet) P5 connector is aligned to the lower right position.

Figure 2. Precedent B/C/D - customer connection module

A diagram showing the Precedent B/C/D unit with the customer connection module installed.

Figure 3. Precedent A cabinet - customer connection module

A diagram showing the Precedent A cabinet with the customer connection module installed.

  1. On the customer connection module, set the address rotary switches to 78. This is required to integrate the customer connection module with the Symbio™ controller. After installation is complete, the Symbio 700 UC configuration will need to be updated to enable this installed feature. UC configuration needs to be updated to enable this installed feature using Symbio Service and Installation Mobile application or Symbio 700 User Interface.
  2. Connect the harness included in kit (harness with blue connector) to customer connection module P5 and adapter board J19 per unit diagram. Note: The unit wiring diagram is located on the control box high voltage door.
  3. Close the access panel.
  4. Apply the information label next to the unit nameplate.
  5. Connect power to the unit. Refer to the troubleshooting section in the unit installation guide, if needed.

Notes

Models: FIASCCM001 Symbio 700 Customer Connection Module, FIASCCM001, Symbio 700 Customer Connection Module, 700 Customer Connection Module, Customer Connection Module, Connection Module, Module

PDF preview unavailable. Download the PDF instead.

ACC-SVN282A-EN 09152024 PDFlib PDI 9.2.0 (C /Win64)

Related Documents

Preview Trane LP Conversion Kit Installation Instructions for Precedent Rooftop Units
Comprehensive installation guide for the Trane LP Conversion Kit for Precedent™ Packaged Rooftop Units (6 to 25 Tons). Covers safety warnings, environmental concerns, parts lists, and detailed step-by-step procedures for converting natural gas units to propane (LP) gas.
Preview Trane Precedent Packaged Rooftop Unit TSJ120A4S00 Technical Specifications
Detailed technical specifications, electrical data, cooling and heating performance, fan performance, acoustics, dimensions, and wiring diagrams for the Trane Precedent Packaged Rooftop Unit, Model TSJ120A4S00.
Preview Trane Foundation™ Packaged Rooftop Units: Installation, Operation, and Maintenance Guide
Comprehensive guide for Trane Foundation™ Packaged Rooftop Units (15-25 Tons, Cooling Only with Electric Heat). Covers installation, operation, maintenance, safety warnings, and technical specifications for models like EDK180-300.
Preview Trane Precedent™ High Efficiency Packaged Rooftop Heat Pumps: Product Catalog
Discover the Trane Precedent™ series of high-efficiency packaged rooftop heat pumps, designed for exceptional reliability and advanced comfort control. This catalog details features, specifications, and applications for units ranging from 12.5 to 25 tons, highlighting Trane's commitment to quality and performance in commercial HVAC solutions.
Preview Trane CO2 Sensing Kit Installation Instructions: FIACO2K001, FIACO2K002 for Symbio 700 Rooftop Units
This document provides installation instructions for the Trane CO2 Sensing Kit (FIACO2K001, FIACO2K002) designed for Precedent™ Packaged Rooftop Units with Symbio™ 700. It covers essential safety warnings, general information, parts lists, installation procedures, and details on Demand Control Ventilation (DCV) operation.
Preview Trane Symbio 700 BACnet Integration Guide for Odyssey Units
This integration guide from Trane provides detailed instructions for connecting Trane Symbio 700 controllers to Odyssey units using BACnet protocols. It covers setup, configuration, and BACnet points for building automation systems.
Preview Installation Instructions: Trane Manual Fresh Air Damper for Precedent Rooftop Units
Step-by-step installation guide for the Trane FIADMPR003* Manual Fresh Air Damper, designed for Precedent™ Packaged Rooftop Units (12.5 to 25 Tons). Includes safety warnings, inspection procedures, installation steps, and airflow data tables.
Preview Trane Precedent Packaged Rooftop Units Clogged Filter Switch Installation Instructions
Installation instructions for the Trane Clogged Filter Switch accessory for Precedent™ Packaged Rooftop Units (3 to 25 Tons). Covers model numbers FIACLFS001 through FIACLFS006 and their compatibility with different cabinet types and filter efficiencies. Includes safety warnings, parts list, and detailed installation steps for wiring and component mounting.