Introduction
This document provides essential installation instructions for the ASKO TD75 Heat Pump Tumble Dryer. It is crucial to read these guidelines carefully before proceeding with the installation to ensure safe and proper operation of the appliance.
General Installation Requirements
Installation should be performed by a qualified person familiar with local codes. Key considerations include:
- Allowing 24 hours after installation before first use.
- Proper handling during transport if laid on its side.
- Checking for cosmetic damage within five days of purchase.
Dryer Placement
The ASKO TD75 can be installed as a free-standing unit or stacked on a washing machine. Ensure:
- Adequate ventilation in the room (10°C to 25°C).
- Avoidance of rooms below 0°C.
- Clearance from walls and adjacent furniture for optimal airflow.
- The door can be opened freely without obstruction.
- Air exhaust openings are never blocked.
Stacking Instructions
When stacking the dryer on an ASKO washing machine, use the provided vacuum feet and tipping guard for stability and safety. Ensure the washing machine can support the dryer's weight.
Door Opening Direction
Instructions are provided for changing the direction of the dryer door opening to suit installation requirements.
Electrical Connections
Detailed guidance is given for connecting the dryer to the power supply, covering both 3-wire and 4-wire configurations, including grounding requirements and specific NEMA receptacle types.
Condensate Draining
Information on draining the accumulated condensate, including options for direct drain connection or using the condensate tank, is detailed.
Support
For customer support, contact ASKO Customer Care at 1-800-898-1879 or visit www.askousa.com.