Tennant CS5 Floor Scrubber
Quick Guide
This guide provides quick consultation for the Tennant CS5 Floor Scrubber. It is essential to read the full user and maintenance manual included with the machine for thorough understanding and strict adherence to all instructions before operation.
1. Illustration showing the main unit and the brush assembly.
2. Place the main unit of the floor scrubber onto the floor.
3. Attach the handle to the main unit.
4. Close-up view of a connection point, highlighted with an eye symbol [magnifying glass].
5. Insert the handle into the connection point, guided by an arrow.
6. Press the indicated button [power button symbol].
7. Assemble the indicated parts using the provided screws.
8. Remove protective packaging or covers, indicated by a scissors symbol [scissors].
9. Insert the solution tank into the machine.
10. Indicates a successful connection or step completion, shown by a checkmark ✔️.
11. Battery status indicator: 1.5 Hours of operation or charge time.
12. Side view of the Tennant CS5 Floor Scrubber.
13. Add water (H₂O) and cleaning solution (CHEM) to the tank.
14. Turn the handle to the ON position [power symbol].
15. Overview of the control panel, with a circular arrow indicating adjustment or selection options.
16. Remove and then reinsert the tank.
17. Control panel display showing cleaning modes: water drops ? (cleaning), chemical bottle ? (solution), fan ? (speed), and ECO button.
18. Control panel display showing cleaning modes: water drops ? (cleaning), chemical bottle ? (solution), fan ? (speed), and AUTO button.
19. Push the machine backward, indicated by a directional arrow.
20. Attach the handle to the secondary unit, indicated by a plus sign +.
21. Detailed view of a connection mechanism and lever.
22. Connect the machine to a power source. Battery indicator shows 1.5 Hours.
23. Status indicators: Checkmark ✔️ for correct operation, Cross ❌ for incorrect operation or error, Exclamation mark ⚠️ for caution or warning.