Underground Cable Modernization Program

Meeting Electric System Needs in Dover & Needham

Project Need

As part of its ongoing commitment to deliver reliable energy and superior service to its customers, Eversource is proposing to replace an existing 115-kilovolt (kV) underground transmission line in the Dover, Needham and Westwood area. Eversource routinely evaluates the condition of its infrastructure to provide reliable electric service to the community. The existing transmission line was installed in 1967 and is nearing the end of its design life expectancy. As a result, it was determined this line should be replaced.

The proposed project is part of a larger program Eversource is conducting throughout its service territory in Connecticut and Massachusetts called the Underground Cable Modernization Program (UCMP). This program is designed to modernize and increase the capacity of the existing underground transmission cable systems by replacing existing fluid-filled cable with cross-linked polyethylene cable.

The existing transmission lines are high pressure fluid-filled (HPFF), and the replacement lines will be solid dielectric cross-linked polyethylene (XLPE). Replacing the existing HPFF with XLPE is designed to modernize the existing electric transmission system, increase reliability, enable Eversource to better access this cable as needed for future maintenance and align with the Commonwealth's goals to achieve net zero carbon emission standards by 2050.

Project Description

Map of Existing Line Route

The map illustrates the existing route of the underground transmission line. It originates from the Chestnut Street substation in Dover and extends to the Westfield Street Station in Westwood, traversing through Dover and Needham, generally following existing roadways. Key locations marked include Chestnut Street substation, Dover, Needham, and Westwood.

Community Outreach

Eversource is committed to engaging city officials, residents, businesses, community groups and other interested stakeholders about the Project through meaningful engagement. The team strives to incorporate local feedback as feasible and will remain engaged with the community throughout the Project to provide updates on the schedule and address questions and concerns.

For more information, please call: 1-833-836-0302 or email: ProjectInfoMA@eversource.com.

Anticipated Project Schedule*

*Dates subject to change pending all necessary approvals

More Information

For more information on the Project or to contact a Project representative, please visit our website at https://bit.ly/DoverNeedhamUCMP. To sign up for project updates, please use the following link: https://bit.ly/DoverNeedhamUpdates.

Language Assistance

Information about the Project is available in Spanish and other languages upon request.

Si necesita que le traduzcan esta notificación, envíenos un correo electrónico a ProjectinfoMA@eversource.com y escriba "D-N" en el asunto.

PDF preview unavailable. Download the PDF instead.

ucmp-dover-needham-one-pager Microsoft: Print To PDF

Related Documents

Preview Dover to Needham Underground Cable Modernization Project FAQ | Eversource
Frequently asked questions (FAQ) regarding Eversource's Dover to Needham Underground Cable Modernization Project (UCMP). This document details the project's purpose, timeline, construction phases, technical specifications, and mitigation measures for modernizing underground electric transmission lines.
Preview Mystic and Everett Underground Cable Modernization Project
Information about the Underground Cable Modernization Program for the Mystic and Everett areas, including project scope, timeline, and community engagement.
Preview Eversource X178-1 Line Rebuild Project: Technical Specifications and Permit Maps
This document details the technical specifications and construction permit map information for the Eversource X178-1 Line Rebuild Project, aimed at enhancing electrical infrastructure reliability between Beebe River and Whitefield.
Preview Eversource Beebe River to Whitefield (X178) Line Rebuild Project
Information regarding the Eversource Beebe River to Whitefield (X178) Line Rebuild Project, focusing on construction permit maps and project scope.
Preview Eversource 2025 Electric Rates Summary and Definitions
Comprehensive summary of Eversource's electric rates for 2025, detailing residential and commercial service charges, energy rates, and definitions of billing terms. Updated August 1, 2025.
Preview Eversource 2020 Sustainability Report: Driving Clean Energy and ESG Excellence
Explore Eversource Energy's 2020 Sustainability Report detailing commitments to environmental stewardship, social responsibility, and robust governance, including clean energy initiatives and community engagement.
Preview Eversource X178 Line Rebuild Project: Beebe River to Whitefield
Details on the Eversource X178 line rebuild project connecting Beebe River to Whitefield, focusing on infrastructure improvements and project scope.
Preview Connecticut Electric Vehicle Charging Program: Qualified Chargers & Vehicles
Explore the Connecticut Electric Vehicle Charging Program for residential single-family homes. Learn about incentives like Smart Charger rebates and enrollment incentives for qualifying Level 2 chargers and connected electric vehicles.